IEC 60204-1 Wire Colour and Pushbutton Colour Chart

Electrical designers and panel builders often need the colour for a conductor or a pushbutton and do not want to open the standard. This chart lists the commonly applied colours from IEC 60204-1 for conductors, pushbuttons and indicator lamps on machines.

Download:
GroupColourTypical meaning or useNote
Conductor
Black
AC and DC power circuits
Main circuits
Conductor
Red
AC control circuits
Conductor
Blue
DC control circuits
Conductor
Orange
Circuits that stay live when the main supply is disconnected
Externally supplied interlock circuits
Conductor
Green and yellow
Protective earth conductor
Never use this combination for any other purpose
Conductor
Light blue
Neutral conductor
Where a colour is used to identify neutral
Pushbutton
Red
Emergency stop, on a yellow background
Mushroom head, latching
Pushbutton
Red
Stop or off
Black, grey or white also allowed
Pushbutton
White, grey, black or green
Start or on
Pushbutton
Yellow
Intervention in abnormal conditions, suppress abnormal state
Pushbutton
Blue
Reset or mandatory action
White, grey or black also allowed for reset
Indicator lamp
Red
Emergency, danger, immediate action required
Indicator lamp
Yellow
Abnormal condition, impending critical condition
Indicator lamp
Green
Normal condition, safe to proceed
Indicator lamp
Blue
Mandatory action required
Indicator lamp
White
Neutral, other conditions
Use when other colours do not apply

This chart reflects the commonly applied provisions of IEC 60204-1 (and its US counterpart NFPA 79 differs in places, for example in control circuit conductor colours). Customer specifications, regional codes and the edition in force take precedence. Verify against the current edition before releasing drawings.

Variant standards per order

Optional: a short review of how regional electrical variants can be captured on configured machine orders.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use this chart

Filter by group to see conductor, pushbutton or indicator lamp rows. When laying out a panel, set a project wiring standard from the chart and put it in the electrical design brief, so every panel builder uses the same convention. Add any customer exceptions, such as site standards that require specific control colours.

  • Pick one colour scheme per project
  • Record the standard edition on the drawing
  • Mark orange conductors clearly: they stay live
  • Label with wire numbers as well as colours

Why colour conventions matter

A maintenance technician isolates the main supply and expects the cabinet to be dead. Orange conductors warn that interlock circuits fed from an external source may still be live. Colour on its own is not enough, since colour blindness and lighting affect perception, so combine colour with wire numbers, terminal labels and legends on devices.

Worked example

On a 400 V machine with a 24 V DC control supply, you would use black for the main power, blue for 24 V DC control wiring, red for any 230 V AC control circuits, green and yellow for protective earth, and orange for an external interlock from a conveyor. Emergency stop is a red mushroom button on a yellow backing plate.

Common mistakes

Using red for a start button because it looks like power is a common error. Another is wiring a reset in green. Mixing NFPA 79 and IEC conventions on one machine also confuses service teams, so decide by destination market and state it in the manual.

Frequently Asked Questions

What colour is a DC control wire?

Blue is the commonly applied colour for DC control circuits under IEC 60204-1, red for AC control and black for power. Customer standards or NFPA 79 may specify different colours, so confirm the destination requirement.

What does an orange wire mean?

Orange identifies circuits that may remain live when the main supply is disconnected, usually interlocked circuits supplied from another source. Treat them as live until verified otherwise.

What colour must an emergency stop be?

Red, ideally a mushroom head on a yellow background. See ISO 13850 for the function requirements, including that the device latches and resets only by a deliberate action.

Can I use green and yellow for anything but earth?

No. The green and yellow combination is reserved for protective conductors. Using it for signal or other conductors is a safety and compliance problem.

If you sell machines worldwide and want the right electrical standard variant attached to each order in your ERP, we can help configure that.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Manufacturing hubs