Statistical Forecast Model Comparison Worksheet
Choosing between a moving average, exponential smoothing or a seasonal method should rest on measured error, not preference. This worksheet lays two models against the same actuals and gives the error for each period and on average.
| Period | Actual | Model A forecast | Model B forecast | Model A APE % | Model B APE % | Model A error | Model B error | |
|---|---|---|---|---|---|---|---|---|
3.7% | 4.9% | -15 | 20 | |||||
3.9% | 5.2% | 15 | 20 | |||||
10.6% | 3.2% | -50 | -15 | |||||
3.3% | 1.1% | -15 | -5 | |||||
9.6% | 2.9% | -50 | -15 | |||||
1% | 2% | 5 | 10 |
Compare models on data the models did not see while fitting (a holdout). Judge on the bias column too: a model with slightly worse MAPE but near zero bias is often better for supply planning.
Backtest every item automatically
Ask for an optional review of running forecast backtests across your whole item master.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Enter actuals for a holdout window, ideally 6 to 12 periods that were not used to fit the models. Paste in the forecast each method produced for the same periods. The worksheet calculates absolute percentage error and signed error per row, and the average MAPE and net error for each model. Export to Excel to keep the backtest evidence with the item or family.
Reading MAPE and bias together
MAPE is the average of absolute percentage errors. It tells you how far off the forecast is typically, but not in which direction. The net error column shows bias: a consistently positive sum means over forecasting. A model with a slightly higher MAPE and no bias can be a better planning input than one with lower MAPE that always runs high.
- MAPE = average of |actual - forecast| / actual
- Positive net error = over forecast
- Prefer low MAPE and near zero bias
- Use WAPE when volumes vary widely
Avoiding a false winner
With only a few periods, one outlier can pick the winner. Test across several items of the same type before changing a model for a whole family. Percentage error is unstable when actuals are close to zero, so for intermittent items compare absolute error instead or use a volume weighted measure.
Common mistakes
The most common error is scoring a model on the same data it was fitted to, which always flatters it. Another is changing the model after every bad month. Set a review rule, for example re-test quarterly, and switch only when the gain holds over a full season.
Frequently Asked Questions
How do I compare two forecasting methods?
Run both on the same historical window, hold back the most recent periods as a test set, then compare error measures such as MAPE and bias on that test set. Pick the method that wins consistently, not once.
What is a good MAPE?
It depends on the item. Stable high volume items may reach single digit MAPE, while lumpy low volume items can exceed 50%. Compare against a naive forecast and your own history rather than a universal target.
Why does MAPE blow up on small numbers?
Dividing by a very small actual makes any miss look enormous, and zero actuals cannot be scored. For intermittent demand use absolute error or WAPE instead.
Should I always choose the lowest MAPE model?
Not always. Check bias, stability and whether the model suits the demand pattern. A slightly less accurate but unbiased and explainable model may serve supply planning better.
Netray can run these backtests across thousands of items from your ERP history and recommend a method per item, with the evidence for a planner to approve.
Related Tools
Forecast Override Log Worksheet
Log every manual forecast override and measure whether it improved accuracy against the statistical baseline.
Supply Chain & InventoryForecast Exception Review Template
Document which SKUs breached your forecast tolerance, why, and who fixes it before the demand review. Exports to PDF or Word.
Supply Chain & InventorySKU ABC XYZ Segmentation Worksheet
Rank SKUs by annual value and demand variability. Calculates coefficient of variation per SKU and the share of total value, ready for Excel.
Supply Chain & InventoryConsensus Forecast Weighted Blend Calculator
Weight four forecast sources into one consensus figure and see how far apart the sources are.
More Supply Chain & Inventory tools
See all- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
- Distributor Backorder Cost and Fill Rate Calculator
- EOQ with Vendor Minimum Order Calculator
Keep exploring
Free tools
- Statistical Forecast Methods Reference GuideA searchable table of forecast methods with the demand pattern each suits, the data needed, key parameters and typical pitfalls.
- Statistical vs Sales Forecast Blend CalculatorWeight the statistical forecast and the sales or customer forecast by how accurate each has been, and see the consensus number and the gap between sources.
- Moving Average Forecast CalculatorEnter the last six periods of demand, choose a 3, 4 or 6 period window and get the simple moving average forecast with a comparison to the naive forecast.
Guides
- Demand Forecasting Configuration in Infor SyteLineConfigure SyteLine demand forecasting with statistical models, forecast consumption, demand management parameters, and accuracy measurement for production planning.
- SyteLine Costing Methods Comparison GuideCompare SyteLine costing methods: standard, actual, average, and FIFO. Selection criteria, configuration, and impact analysis for manufacturers.
- SyteLine Statistical Process Control (SPC) Implementation GuideImplement statistical process control in SyteLine for manufacturing quality. Configure control charts, Cpk calculations, and process monitoring in CloudSuite Industrial.