Forecast Override Log Worksheet
Manual overrides are sometimes the smartest part of a forecast and sometimes the biggest source of bias. This log records each override with its requester and reason, then compares the error of the adjusted forecast with the statistical baseline once actuals are in.
| SKU | Requested by | Reason | Statistical forecast | Adjusted forecast | Override size | Actual | Statistical abs error | Adjusted abs error | Error reduction | |
|---|---|---|---|---|---|---|---|---|---|---|
300 | 280 | 20 | 260 | |||||||
300 | 100 | 200 | -100 | |||||||
-400 | 50 | 450 | -400 | |||||||
-80 | 85 | 5 | 80 | |||||||
150 | 10 | 140 | -130 |
Fill actuals after the period closes. Summarise by requester in Excel to see whose adjustments add value. Positive FVA means overrides help, negative means they hurt.
Automated override tracking
Ask for an optional review of capturing overrides and FVA directly from your planning data.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Record each override when it is agreed: SKU, who asked, why, the statistical forecast and the adjusted one. After the period closes, add the actuals. The worksheet computes absolute error for both versions, the error reduction per row, and the total forecast value added across the log. Export to Excel and pivot by requester or reason.
Reading forecast value added
Forecast value added is the share of statistical error removed by the adjustments. A positive result means that human input improved the forecast. A negative result means overrides, in total, increased error. Break it down by reason: promotions with evidence often add value, while optimistic sales uplifts with no evidence often subtract it.
- Positive FVA: overrides helped
- Negative FVA: overrides hurt
- Slice by requester and by reason
- Look at net override volume for bias
Using the findings
Share the results with each requester in the demand review in a neutral way. If one group consistently pushes volumes up without result, require evidence for their overrides, such as signed orders. If the planner correcting the model adds value, keep that route open. The aim is a fair process, not blame.
Common mistakes
Logging only large overrides hides the many small ones that add up to bias. Recording actuals against a version of the forecast that was changed after the fact makes the comparison meaningless. Freeze both versions at the time of the review and compare only against those.
Frequently Asked Questions
What is forecast value added?
Forecast value added measures whether a step in the forecast process, such as a manual override, improved accuracy compared with the previous step. It is calculated as the reduction in error versus the baseline.
Should I allow manual overrides at all?
Yes, when they carry information the model cannot see, such as signed orders or planned promotions. Track them, require a reason and review the results so poor overrides are discouraged.
Which error measure should I use?
Absolute error in units is simple and clear in this worksheet. Many teams also report percentage or weighted error. Whatever you choose, use it consistently for both versions.
How many cycles of data do I need?
At least three to six cycles before drawing conclusions about a group, because a few large items can dominate any single cycle.
Netray can capture overrides from your planning system and ERP automatically and report forecast value added by requester every cycle.
Related Tools
Demand Review Meeting Minutes Template
Capture forecast changes, assumptions, risks and owned actions from the monthly demand review in one clean document.
Supply Chain & InventoryForecast Exception Review Template
Document which SKUs breached your forecast tolerance, why, and who fixes it before the demand review. Exports to PDF or Word.
Supply Chain & InventoryStatistical Forecast Model Comparison Worksheet
Line up actuals against two forecast methods, see absolute percentage error per period and average MAPE for each, then export to Excel.
Supply Chain & InventoryConsensus Forecast Weighted Blend Calculator
Weight four forecast sources into one consensus figure and see how far apart the sources are.
More Supply Chain & Inventory tools
See all- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
- Distributor Backorder Cost and Fill Rate Calculator
- EOQ with Vendor Minimum Order Calculator
Keep exploring
Free tools
- Statistical Forecast Methods Reference GuideA searchable table of forecast methods with the demand pattern each suits, the data needed, key parameters and typical pitfalls.
- Statistical Forecast Model Comparison WorksheetLine up actuals against two forecast methods, see absolute percentage error per period and average MAPE for each, then export to Excel.
- Safety Interlock Bypass and Override Log WorksheetAn editable log of safety interlock bypasses and alarm overrides with approvals, compensating measures, time limits and hours remaining.
ERP fixes and how-tos
- SYSPRO Forecasting: How Forecasts Feed MRPHow SYSPRO forecasting feeds MRP: setting up forecasts, choosing a method, how sales orders consume forecast, and how to check the MRP result before releasing.
- How to Release a Customer Order from Credit Hold in SyteLineFind why a SyteLine customer order is on credit hold, see who is authorized to release it, and set credit limits and days-past-due rules so it stops recurring.
- Business Central for Process Manufacturing, Production Forecasts and Production DebuggingWhat Business Central can and cannot do for process manufacturing, how to set up a production forecast for planning, and how to debug production order problems.
Guides
- Demand Forecasting Configuration in Infor SyteLineConfigure SyteLine demand forecasting with statistical models, forecast consumption, demand management parameters, and accuracy measurement for production planning.
- Demand Sensing for Manufacturers: Shortening the Forecast HorizonDemand sensing for manufacturers: how short-horizon signals, POS and channel data, and ML models cut forecast error 20-40% over statistical baselines.
- Infor M3 Demand Planning and Forecasting ConfigurationConfigure Infor M3 demand planning with statistical forecasting, forecast consumption, MPS integration, and demand sensing for accurate production scheduling.
AI on your ERP
- AI-Powered Demand Forecasting Integrations for NetSuite: Models, Item Demand Plans and ExplanationsHow AI demand forecasting integrates with NetSuite: native demand plans, external forecast models, importing item demand plans and explaining changes.
- AI Demand Forecasting for Manufacturers: Better Numbers and an Explanation Planners Can TrustAI demand forecasting explains ERP forecast changes in plain language, flags exceptions for planners, and handles short-history SKUs without Excel overrides.