Supplier Switching Cost Breakeven Calculator

A lower quote is not a saving until it has paid back everything it costs to move. This calculator counts requalification, tooling, transition inventory and other costs against the price difference.

Your numbers

$
9.4 $
units
$

First article inspection, PPAP or equivalent, audits, lab tests, travel, engineering time.

$
units

Extra inventory built to cover the changeover.

% per year
months
$

Legal review, freight setup, ERP master data, scrap of old stock.

Your results

Total one time cost
$65,520
Net benefit over 3 years
$132,480
Annual price saving
$66,000
Cost of holding the buffer
$7,520
Payback period
11.9 months
Shown as zero when there is no saving.
Highest new price that breaks even in 3 years
$10

Planning estimate. It does not price quality risk, lead time risk, or the value of a second source. Add those as one time or recurring costs if they matter to your decision.

Save results:

3 year net benefit by new supplier price

Sweeps New supplier unit price from 7 to 11, holding your other inputs fixed.

Landed cost comparison by supplier

Optional: see how landed cost and delivery performance can be compared from your ERP data.

Optional. The tool and every export work without this. No spam.

How to use the calculator

Enter your current price, the quoted price and annual volume. Then fill in one time costs: qualification, tooling, transition stock and anything else such as legal review or old inventory write off. The result shows payback in months, the net benefit over three years and the highest new price that still breaks even in three years. The slider and chart make it easy to test how negotiation on price changes the case.

  • Use the supplier's firm quote, including freight and duties on a landed basis.
  • Ask quality for a realistic qualification cost, including internal hours.
  • Count tooling even if the supplier says it will pay, since it is usually amortized in the price.

The formula

Annual saving equals current price minus new price, times annual volume. Buffer cost equals buffer units times new price times the carrying rate times months held divided by twelve. Total one time cost sums qualification, tooling, buffer cost and other costs. Payback in months equals one time cost divided by annual saving, times twelve. Three year net equals three years of saving minus the one time cost. The breakeven price equals current price minus one time cost divided by three times the volume.

Reading the result

A payback under twelve months is usually attractive for stable, long running parts. For short program life, set the horizon to the remaining life of the part rather than three years. If the saving is small against a long payback, the change may only make sense if it adds a second source or reduces risk. Always weigh the cost against the price of a quality escape, as covered in the liability cap tool.

Common mistakes

Teams compare unit prices and ignore freight, duty, payment terms and minimum order quantities. Another is leaving out internal engineering and quality time, which can be the largest qualification cost. Record the one time costs against the sourcing project so the actual savings can be compared with the plan once the new supplier ships at volume.

Frequently Asked Questions

What costs are included in switching suppliers?

Typically qualification and first article work, tooling transfer or new tooling, transition inventory, logistics setup, legal and contract work, ERP master data changes, and scrap of old stock. Include internal labor, not only cash costs.

What payback period is good?

It depends on part life and risk. Under twelve months is often attractive for a long running part, while a short program may need payback in a few months. Choose a horizon that matches the remaining demand.

Does this include quality risk?

No. A new supplier carries ramp up risk. You can reflect that by adding an expected cost of early quality issues to the other one time costs, based on your history with new sources.

Who owns the tooling?

That should be written in the contract. If you own the tools, transfer is easier but you pay to move them. If the supplier owns them, you may have to pay for replacement tooling at the new source.

If you want landed cost and supplier performance side by side, we can help build that view from your purchasing and receiving data in your ERP.