ERP Table and Field Explorer
SyteLine Database Tables and Field Explorer
Search the core Infor SyteLine (CloudSuite Industrial) tables by table name, field or description, see each table's key, important columns and joins, then pick two to four tables to get a SQL Server JOIN skeleton. Every table is a _mst table that carries site_ref, and the item's current routing and BOM live in jobroute_mst and jobmatl_mst under a type S job.
72 tables, 371 documented fields and 100 join paths across 9 modules. Free, runs in your browser, no login needed.
1Find a table by name, description or field
Naming: SyteLine 9 and later store data in _mst tables with a site_ref column; views named without the suffix (item, coitem) filter to the current site and return no rows until the site context is set with EXEC dbo.SetSiteSp. _mst_all tables hold copies of other sites' data for multi-site.
Tables by module
2Pick tables
72 of 72Items
item_mst
Item master: one row per item per site, with source, status, costing, planning and the link to the current routing and BOM.
Also known as: Items form, SLItems, item master
itemsite_ref| Field | Meaning |
|---|---|
| item | Item number. |
| description | Item description. |
| u_m | Stocking unit of measure. |
| product_code | Product code, drives default GL accounts and reporting (prodcode_mst). |
| p_m_t_code | Source: P purchased, M manufactured, T transferred. |
| stat | Item status, for example A active, O obsolete, S slow moving. |
| matl_type | Material type: M material, T tool, F fixture, O other. |
| stocked | 1 when the item is stocked. |
| lot_tracked | 1 when the item is lot tracked. |
| serial_tracked | 1 when the item is serial tracked. |
| job | Job number of the current routing and BOM (job_mst row with type S). |
| suffix | Suffix of the current routing and BOM job. |
Joins
- item_mst.job = job_mst.job AND item_mst.suffix = job_mst.suffix
Current routing and BOM header (job type S).
- item_mst.job = jobroute_mst.job AND item_mst.suffix = jobroute_mst.suffix
Current operations.
- item_mst.job = jobmatl_mst.job AND item_mst.suffix = jobmatl_mst.suffix
Current materials (single-level BOM).
- item_mst.product_code = prodcode_mst.product_code
- item_mst.item = itemwhse_mst.item
- item_mst.item = itemloc_mst.item
- item_mst.item = lot_mst.item
- item_mst.item = serial_mst.item
- item_mst.item = matltran_mst.item
- item_mst.item = matltrack_mst.item
- item_mst.item = rsvd_inv_mst.item
- item_mst.item = trnitem_mst.item
- item_mst.item = itemprice_mst.item
- item_mst.item = itemcust_mst.item
- item_mst.item = itemvend_mst.item
- item_mst.item = coitem_mst.item
- item_mst.item = poitem_mst.item
Other planning and costing columns used in public SyteLine code include plan_code, buyer, lead_time, family_code, cost_type, cost_method, unit_weight, drawing_nbr and revision. item_glbl holds the global item for multi-site setups.
3Generate a JOIN skeleton (2 to 4 tables)
Dialect: SQL Server (T-SQL)
-- Query skeleton generated by netray.co/tools/table-explorer
-- Dialect: SQL Server (T-SQL). Review keys, filters and indexes before running on production.
-- Querying the _mst tables directly: filter site_ref. To use the site views instead, run EXEC dbo.SetSiteSp 'YOURSITE', @Infobar OUTPUT first.
-- Job, order and PO numbers are stored right-justified: pad typed values with dbo.ExpandKyByType or compare with LTRIM.
-- Read only. Write through IDOs or forms, not with direct UPDATE statements.
SELECT TOP 100
co.co_num,
co.cust_num,
co.cust_seq,
co.order_date,
co.stat,
cust.name,
cust.addr##1,
cust.city,
cust.state,
cust.zip,
coit.co_line,
coit.co_release,
coit.item,
coit.qty_ordered,
coit.qty_shipped,
item.description,
item.u_m,
item.product_code,
item.p_m_t_code,
item.matl_type
FROM dbo.co_mst AS co
-- co_mst to custaddr_mst: Ship-to name and address.
LEFT JOIN dbo.custaddr_mst AS cust
ON co.cust_num = cust.cust_num
AND co.cust_seq = cust.cust_seq
AND co.site_ref = cust.site_ref
LEFT JOIN dbo.coitem_mst AS coit
ON co.co_num = coit.co_num
AND co.site_ref = coit.site_ref
LEFT JOIN dbo.item_mst AS item
ON coit.item = item.item
AND coit.site_ref = item.site_ref
WHERE co.site_ref = 'YOURSITE' -- replace with your site code
ORDER BY co.co_num;How to use it
- 1
Search
Type a table name such as coitem_mst, a column such as qty_ordered, or a business word such as invoice. Field matches are highlighted under each table.
- 2
Filter and inspect
Narrow by module, then open a table to see its key, the columns that matter, and the tables it joins to. Click a join to jump to that table.
- 3
Build the join
Add two to four tables with the plus button or a starter. The SQL skeleton includes the documented join columns plus site_ref, ready for SQL Server Management Studio.
- 4
Keep it
Star tables as favorites, export to PDF, Excel, Word or CSV, and optionally save the whole setup to your Netray account to reopen it later.
Questions about Infor SyteLine (CloudSuite Industrial) tables
What is the difference between item_mst and item in SyteLine?
Since SyteLine 9 the physical tables end in _mst and carry a site_ref column, so one database can hold several sites. The objects without the suffix, such as item and coitem, are views that filter to the current site. They return no rows from a plain SQL session until you set the site context, for example EXEC dbo.SetSiteSp 'SITE', @Infobar OUTPUT. In reports you can either do that or query the _mst tables and filter site_ref yourself.
Where is the bill of material stored in SyteLine?
The current routing and BOM of an item are stored like a job. item_mst.job and item_mst.suffix point to a job_mst row with type S. Its operations are in jobroute_mst and its materials, by operation, in jobmatl_mst. When you release a production job (type J), the current operations and materials are copied into that job's own jobroute_mst and jobmatl_mst rows, so later BOM changes do not alter existing jobs.
Which tables hold customer orders and order lines?
co_mst is the order header (customer, ship-to sequence, order date, status, terms). coitem_mst holds lines and releases keyed by co_num, co_line and co_release, with qty_ordered, qty_shipped, qty_invoiced, price, due_date and stat. Shipments are in co_ship_mst, blanket lines in co_bln_mst, and orders moved to history in coh_mst and citemh_mst.
Why does my WHERE co_num = '1234' return nothing?
SyteLine stores job, order and PO numbers right-justified with leading spaces. Either pad the value the way the application does, with dbo.ExpandKyByType('CoNumType', '1234'), or compare with LTRIM(co_num) = '1234'. Padding keeps the index usable; LTRIM on the column does not.
Where are customer and vendor names stored?
Not in customer_mst or vendor_mst. Names and addresses are in custaddr_mst (join on cust_num and cust_seq, where cust_seq 0 is the bill-to) and vendaddr_mst (join on vend_num). Infor documents vendaddr_mst as the table shared among all sites, while vendor_mst holds site specific data.
How do I find inventory transactions for a job, PO or order?
Use matltran_mst. trans_type tells you the movement (R PO receipt, I job issue, F job finish, S CO shipment and so on) and ref_type tells you the source document: O customer order, P purchase order, J job, T transfer, R RMA. ref_num, ref_line_suf and ref_release then point to the order, line and release, or to the job and suffix.
Is it safe to update SyteLine tables with SQL?
Read with SQL, write through the application. Inserts and updates through IDOs, forms or the documented import utilities fire the triggers, validation and cost logic that direct UPDATE statements skip. Multi-tenant cloud editions do not allow direct database access at all, so use IDO REST or data views there.
What are the _mst_all tables?
In a multi-site setup, _mst_all tables hold rows from all sites in the replication group, while the base _mst table holds the local site only. Infor's example is terms_mst and terms_mst_all, where site_ref tells the sites apart. Replication rules decide which categories, and so which _all tables, are filled.
Sources
Table names and columns were checked against these public references. Tables whose key or columns we could not confirm say so in their notes. Column sets change between releases, so confirm against the data dictionary of your own version before you build on it.
- Infor CSI 2026.10: Centralized Order Entry category (table list)
- Infor CSI 2026.10: Multi-Site Items category (item, job, jobmatl, jobroute tables)
- Infor CSI 2026.10: Inventory/Transfers category
- Infor CSI 2026.10: A/P category
- Infor CSI 2026.10: A/R category
- Infor CSI 2026.10: G/L category
- Infor CSI 2026.10: Voucher Builder category
- Infor CSI 2026.10: Purchase Order Builder category
- Infor CSI 2026.10: Ledger Detail category
- Infor CSI 2026.10: _All tables (terms_mst_all and site_ref)
- Infor CSI 2026.10: Maintaining vendor data for other sites (vendor_mst_all, vendaddr_mst)
- Infor CSI 10: Inbound Demand EDI flat-file layout (coitem, co columns)
- Infor CSI 10: Outbound Demand EDI flat-file layout (custaddr, inv_hdr, inv_item columns)
- Infor CSI 10: Outbound Supply EDI flat-file layout (po_mst, vendaddr_mst, terms_mst columns)
- Infor CSI 9.01: Setting up a stored procedure critical number drilldown (co, coitem, custaddr join)
- Infor SyteLine Manufacturing User Guide 9.00 (current operations and materials, sub-jobs)
- MachineMetrics: Infor SyteLine on-premises connector (job, jobroute, jobtran, jrt_sch, wc tables)
- SytelineMaster: SQL query SyteLine 9 (views, _mst tables, SetSiteSp)
- SytelineMaster: material transaction types (trans_type, ref_type)
- SytelineMaster: fixing YTD numbers in item warehouse (itemwhse, matltran columns)
- GitHub: CSI 9 customization stored procedures (current job type S, jobmatl, jobroute)
- GitHub: published aptrxp_mst DDL