SyteLine Database Tables Reference: Core _mst Tables and Keys
SyteLine stores business data in SQL Server tables whose names end in _mst. This lookup lists the core tables for inventory, production, sales, purchasing and finance with the business key you normally join on. Use it when you are writing a report, an IDO or a quick diagnostic query.
| Table | Area | What it holds | Typical business key (with site_ref) |
|---|---|---|---|
item_mst | Inventory | Item master, one row per item per site | item |
itemwhse_mst | Inventory | Item quantities and planning data by warehouse | item, whse |
itemloc_mst | Inventory | Item quantity by warehouse location | whse, item, loc |
loc_mst | Inventory | Warehouse location master | loc |
lot_mst | Inventory | Lot master for lot tracked items | item, lot |
lot_loc_mst | Inventory | Lot quantity by warehouse location | whse, item, loc, lot |
whse_mst | Inventory | Warehouse master | whse |
matltran_mst | Inventory | Inventory transaction history (receipts, issues, moves) | trans_num |
prodcode_mst | Inventory | Product code master used for GL and reporting | product_code |
job_mst | Production | Job header | job, suffix |
jobroute_mst | Production | Job operations (routing copy on the job) | job, suffix, oper_num |
jobmatl_mst | Production | Job material requirements | job, suffix, oper_num, sequence |
jobtran_mst | Production | Job labor, machine and move transactions | trans_num |
wc_mst | Production | Work center master | wc |
co_mst | Sales | Customer order header | co_num |
coitem_mst | Sales | Customer order lines and releases | co_num, co_line, co_release |
customer_mst | Sales | Customer master (sequence 0 is the bill-to record) | cust_num, cust_seq |
custaddr_mst | Sales | Customer name and address data | cust_num |
po_mst | Purchasing | Purchase order header | po_num |
poitem_mst | Purchasing | Purchase order lines and releases | po_num, po_line, po_release |
vendor_mst | Purchasing | Vendor master | vend_num |
vendaddr_mst | Purchasing | Vendor name and address data | vend_num |
arinv_mst | Finance | Accounts receivable invoices | inv_num |
chart_mst | Finance | Chart of accounts | acct |
ledger_mst | Finance | General ledger postings | trans_num |
parms_mst | System | Site level parameters | parm_key |
Every _mst table is multi-site and carries site_ref plus system columns such as RowPointer, NoteExistsFlag, CreatedBy, UpdatedBy, CreateDate, RecordDate and InWorkflow. Names and keys reflect common releases. Confirm against your own database before relying on them in production code.
Want a read-only SyteLine data map for your own database?
Ask for an optional review of your SyteLine schema, including custom tables, with notes on which queries are safe to automate.
Optional. The tool and every export work without this. No spam.
How to use this reference
Type a table name, an area such as Production, or a word from the description into the search box to filter the list. Each row gives the usual business key. In SyteLine every key is effectively prefixed with site_ref, so joins between multi-site tables need site_ref on both sides or you will multiply rows across sites. Export the filtered list to Excel to keep a cheat sheet next to your query tool.
- Search by area to see all tables for one module
- Always join on site_ref as well as the business key
- Use the view without the _mst suffix when your tool offers it
Tables versus views and IDOs
Most SyteLine forms do not read the _mst tables directly. They go through IDOs, which sit on views that filter by the current site. If you query the raw table you see every site in the database, which is useful for audits and misleading for reports meant for one site. Reporting tools that connect to the application database should usually read the site aware views, while diagnostic work such as blocking analysis or data fixes happens at the table level with care.
Common mistakes
The most frequent errors are joining job_mst to jobroute_mst without suffix, which mixes a job with its sub jobs, forgetting that customer_mst uses a sequence number for ship-to records, and updating _mst tables directly. Direct updates bypass SyteLine business logic, triggers and the audit trail, and Infor support will not stand behind data created that way.
- Join job tables on job and suffix together
- Use cust_seq 0 for the bill-to customer record
- Prefer IDO methods or supported utilities over direct UPDATE statements
Frequently Asked Questions
Why do SyteLine tables end in _mst?
The suffix marks the multi-site base table. The application normally reads a view with the same name minus the suffix, which restricts rows to the current site. Custom code that needs one site's data should usually filter on site_ref or use the view.
Is there an official SyteLine data dictionary?
Infor documents tables and IDO properties inside the product through the IDO and form tooling, and your database itself is the final authority. This list is a quick orientation, not a replacement for checking your own release.
Can I write directly to these tables?
It is risky. Direct writes skip validation, event handlers, triggers and the audit trail. Use IDO methods, import utilities or supported APIs for any change, and use SQL mainly for reading and diagnosis.
How do I find a table that is not listed?
Search the SQL Server catalog with a query on INFORMATION_SCHEMA.COLUMNS for a known column name, or check the IDO definition of the form you are looking at. The IDO property maps back to a table and column.
If you maintain many SyteLine reports and queries, Netray can walk through your database and show which ones an AI assistant could draft and explain safely, with read-only access.
Related Tools
SyteLine Item Master Fields Reference
Searchable list of important item_mst fields with typical values and what each one drives in planning, costing and inventory.
Infor SyteLineSyteLine IDO Names Reference
Searchable list of common SyteLine IDO names with the underlying tables, to speed up REST integrations and form work.
Developer ToolsSyteLine Custom Table CREATE Script Generator
Creates a SQL Server CREATE TABLE script for a custom SyteLine table that follows the standard column and key conventions.
Developer ToolsSyteLine SQL Blocking and Long Running Query Script Generator
Builds read-only SQL Server diagnostic scripts for blocking, head blockers, open transactions and slow requests on a SyteLine database.
More Infor SyteLine tools
See all- SyteLine Form Personalization Checklist
- SyteLine User Access Request Form Template
- SyteLine Custom Report Request Template
- SyteLine Data Conversion Mapping Worksheet
- SyteLine UAT Test Script Worksheet
- SyteLine Cutover Plan Worksheet
- SyteLine Change Request Form Template
- SyteLine Cycle Count Variance Worksheet
- SyteLine Database Growth Forecast Calculator
New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- SyteLine Customer Order Tables Columns ReferenceThe key columns in SyteLine 9/10 customer order tables, what they mean, how they join and how to use them in custom reports.
- SyteLine Purchasing Tables Columns ReferenceSearchable column list for SyteLine purchase order, line, vendor and receipt tables with join keys and the formulas behind open, late and unvouchered PO reports.
- SyteLine Job Tables Columns ReferenceSearchable column list for SyteLine production job tables with the composite keys, units basis and the formulas for WIP, shortages and actual hours.
ERP fixes and how-tos
- How to Build SQL Views for Custom SyteLine ReportingWhy custom SyteLine reports should read from purpose-built SQL views, not core tables directly, and how to build and place those views safely.
- Work order (job) item, status and routing tables in SyteLineWhere SyteLine stores work orders (jobs), routings, operations and materials: job, jobroute, jobmatl, jobtran tables, status values and sample SQL queries.
- QAD ERP Tables and API Access: Key Tables, SQL and Integration OptionsKey QAD ERP tables such as pt_mstr and so_mstr, how to query them via OpenEdge SQL, and which API options exist for integration. Read-only guidance.
Guides
- A Practical Guide to SyteLine's Core SQL TablesA practical guide to the core SyteLine SQL tables, customer orders, lines, items, purchasing, jobs, their join paths, _mst conventions, and site_ref scoping for correct queries.
- SQL Query Optimization for SyteLine ReportingOptimize SQL queries against Infor SyteLine database tables. Index strategies for SL tables, query plan analysis, and performance tuning for SSRS reports.
- SyteLine SQL Server Maintenance GuideSyteLine SQL Server maintenance guide covering backups and recovery model, index and statistics jobs, integrity checks, and purging history tables safely.