USML Categories (I to XXI) and Export Control Reference
Anyone in defense electronics hears USML category numbers daily: Category XI, Category XII, Category VIII. This reference lists all 21 categories by title and the main regulation names, so purchasing, contracts and shop floor staff can speak the same language as the export compliance office.
| Reference | Title or name | Type | Note |
|---|---|---|---|
Category I | Firearms and Related Articles | USML | |
Category II | Guns and Armament | USML | |
Category III | Ammunition and Ordnance | USML | |
Category IV | Launch Vehicles, Guided Missiles, Ballistic Missiles, Rockets, Torpedoes, Bombs, and Mines | USML | |
Category V | Explosives and Energetic Materials, Propellants, Incendiary Agents, and Their Constituents | USML | |
Category VI | Surface Vessels of War and Special Naval Equipment | USML | |
Category VII | Ground Vehicles | USML | |
Category VIII | Aircraft and Related Articles | USML | Avionics may fall here or in XI depending on the entry |
Category IX | Military Training Equipment and Training | USML | |
Category X | Personal Protective Equipment, Shelters, and Related Articles | USML | |
Category XI | Military Electronics | USML | Core category for radar, electronic warfare, command and control electronics |
Category XII | Fire Control, Laser, Imaging, and Guidance Equipment | USML | Electro-optics, night vision, laser and inertial navigation items |
Category XIII | Materials and Miscellaneous Articles | USML | |
Category XIV | Toxicological Agents, Including Chemical Agents, Biological Agents, and Associated Equipment | USML | |
Category XV | Spacecraft and Related Articles | USML | |
Category XVI | Nuclear Weapons Related Articles | USML | |
Category XVII | Classified Articles, Technical Data, and Defense Services Not Otherwise Enumerated | USML | |
Category XVIII | Directed Energy Weapons | USML | |
Category XIX | Gas Turbine Engines and Associated Equipment | USML | |
Category XX | Submersible Vessels and Related Articles | USML | |
Category XXI | Articles, Technical Data, and Defense Services Not Otherwise Enumerated | USML | |
ITAR | International Traffic in Arms Regulations, 22 CFR Parts 120 to 130 | Regulation | Administered by the State Department, DDTC |
USML text | United States Munitions List, 22 CFR 121.1 | Regulation | Where the categories are published |
EAR | Export Administration Regulations, 15 CFR Parts 730 to 774 | Regulation | Administered by the Commerce Department, BIS |
CCL | Commerce Control List, Supplement No. 1 to Part 774 | Regulation | Lists ECCNs for dual-use and some military items |
3A611 | Military electronics ECCN (600 series) | ECCN | Items moved from USML to the CCL are in the 600 series |
DDTC | Directorate of Defense Trade Controls | Agency | Registration and licensing under ITAR |
BIS | Bureau of Industry and Security | Agency | Licensing under EAR |
This list is for orientation only. Classification of an actual article is the exporter's responsibility and can require a commodity jurisdiction request or a written determination. It is not legal advice. Entries inside each category change by rule, so read the current text of 22 CFR 121.1.
Keep classification data close to your parts
Optional: a short look at storing classification fields in your ERP item master.
Optional. The tool and every export work without this. No spam.
How to use the reference
Search for a word such as electronics, aircraft or spacecraft to see the categories that mention it. Use the Type column to isolate categories, regulations and agencies. Export the table to attach to a supplier onboarding pack or a training slide. The category is only the start of classification. Each category has paragraphs (a), (b), (c) and so on, and the specific paragraph, plus any notes and technical parameters, decide whether your item is covered.
ITAR versus EAR
ITAR controls items on the USML, which are specially designed for military use, and is run by the State Department. EAR controls dual-use items and items moved off the USML, and is run by Commerce. Moved items sit in the 600 series of ECCNs. Defense electronics suppliers often handle both: a ruggedized board may be ITAR while a commercial FPGA on it is EAR. Marking, storage, foreign person access and technical data handling differ, so classify at the part and the assembly level.
- Keep a classification record for each part and assembly
- Treat technical data and software as controlled, not only hardware
- Check foreign person access to shared drives and ERP screens
- Review classification when a design changes
Common mistakes
A common error is classifying by the customer's name rather than by the article. Another is assuming that a purchased commercial part stays commercial after it is built into a USML assembly. The assembly takes its own classification, and supplier flowdown clauses may require the same handling for the parts. Also avoid emailing technical data through uncontrolled tools. Keep the classification, the license or exemption reference and the end-use details on the order record so audits are quick.
Frequently Asked Questions
How many USML categories are there?
There are 21 categories, numbered I to XXI. Each category lists the covered articles, technical data and defense services in paragraphs. The official list is in 22 CFR 121.1 and is amended by rule from time to time.
Which USML category covers military electronics?
Category XI is titled Military Electronics, including items such as certain radar and electronic warfare equipment. Imaging and fire control items are in XII, and avionics specially designed for aircraft may be in VIII. The exact paragraph decides.
Does this tool classify my product?
No. It lists the categories for orientation. Classification needs analysis of the specific design against the current regulation, and sometimes a government determination. Work with your export compliance lead or counsel for decisions.
What is a 600 series ECCN?
These are Commerce Control List entries for military items that were moved from the USML to EAR control. They are numbered with a 6 in the position that identifies the group, for example 3A611 for certain military electronics.
Netray designs private, on-prem AI so controlled data stays inside your environment. We can discuss how classification fields could surface in your ERP.
Related Tools
MIL-STD-461 EMI/EMC Test Method Reference Table
Every MIL-STD-461 method code (CE101 to RS105) with its title and emission or susceptibility type, searchable and exportable.
Aerospace & DefenseMIL-STD-810H Test Methods Reference Table
Look up every MIL-STD-810H environmental test method number, title and the stress it covers, then export the list for your test plan.
Developer ToolsElectronic Component Lot Traceability SQL Generator
Fill in your table and column names to get forward trace, backward trace and quarantine-scope SQL for a component lot or date code.
Electronics ManufacturingJ-STD-020 MSL Floor Life and Soak Reference
Look up floor life and soak conditions for each moisture sensitivity level in J-STD-020, with dry pack basics from J-STD-033.
More Compliance & Contracts tools
See all- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
- GDPR ERP Data Migration Checklist
- EU Machinery Regulation 2023/1230 Readiness Checklist
Keep exploring
Free tools
- ITAR USML Categories Reference TableA searchable list of the 21 USML categories, I through XXI, with a plain-language note on what each tends to cover and how to flag it in your ERP.
- ITAR USML Categories I to XXI ReferenceAll 21 USML categories with their official titles and a plain summary of what a machine shop, electronics house or software team should look for.
- Export Classification Matrix Worksheet (USML and ECCN)A part-level classification register with jurisdiction, control number, basis, reviewer and next review date.