Dynamics 365 manufacturing consultants: scope, products and how to choose

Dynamics 365 manufacturing consulting means configuring and fixing production in either Dynamics 365 Supply Chain Management (discrete, process and lean manufacturing for larger operations) or Business Central (production BOMs, routings and planning for smaller manufacturers). The core topics are BOMs and routes, production orders, master planning, costing, shop floor execution and quality.

When this makes sense

  • Production order costs never match standard and variances are a month-end mystery.
  • Master planning produces too many or no planned orders and planners override it in Excel.
  • You run discrete and process production and need formulas, co-products and batch orders.
  • Shop floor reporting is on paper and WIP is a guess.
  • You are choosing between Business Central and Supply Chain Management for a growing plant.

What the engagement covers

Product choice

Compare Business Central manufacturing (production BOMs, routings, work and machine centers, planning worksheet) with Supply Chain Management (BOMs and formulas, routes and operations, resources, master planning) against your complexity, entities and growth.

Engineering data

Design BOM and formula versions, route operations, resource groups and capabilities, and engineering change management so production data stays controlled.

Production control

Configure production orders, batch orders for process manufacturing, kanban for lean, scheduling (operations or job scheduling), and backflushing rules.

Planning

Set item coverage, master plans and Planning Optimization in SCM, or the planning worksheet and reordering policies in Business Central, and tune lead times and safety stock.

Costing

Set up costing versions and standard cost rollups or actual costing, cost groups, indirect costs, and production variance analysis.

Shop floor and quality

Configure the production floor execution interface or job card device for time and quantity reporting, plus quality orders, test groups and quarantine.

Warehouse and traceability

Link production to warehouse management, raw material picking, finished goods put-away, and batch and serial tracking for recalls.

How it runs

  1. 1

    Assessment (2-4 weeks)

    • Plant walk and process mapping
    • Review BOMs, routes and costing
    • Identify top problems
  2. 2

    Design (2-6 weeks)

    • Production and planning parameters
    • Costing approach
    • Shop floor reporting design
  3. 3

    Configure and test (4-12 weeks)

    • Configure in sandbox
    • Pilot with one product family
    • Validate costs and plans
  4. 4

    Rollout (2-8 weeks)

    • Train planners and supervisors
    • Roll out by line or plant
    • Monitor variances

What you get

  • Manufacturing process maps and fit-gap
  • BOM, route and resource design standards
  • Planning parameter set with rationale
  • Costing design and variance analysis report
  • Shop floor reporting configuration and training
  • Traceability test results

What drives cost and effort

Manufacturing modeDiscrete only is simpler than mixed discrete, process and lean.
Number of plantsEach site adds resources, calendars, warehouses and testing.
Engineering data qualityInaccurate BOMs and routes must be fixed before planning or costing can work.
Costing methodStandard costing needs cost rollups and variance processes; actual costing needs closing and recalculation discipline.
Shop floor devicesTerminals, scanners and network on the floor add setup and testing.
Regulatory needsLot traceability, electronic signatures and quality records add configuration and validation.

Problem-focused assessment

A specific issue such as costing variances or planning output.

Phased improvement project

Rolling out shop floor execution or planning changes line by line.

Fractional manufacturing consultant

Plants needing ongoing expert guidance a few days a month.

Questions to ask any Microsoft Dynamics 365 consultant

Have you configured manufacturing in Supply Chain Management, Business Central, or both?

The products differ a lot; experience in one does not transfer fully.

How do you approach costing variances?

Costing is where most manufacturing projects struggle.

Have you worked in plants with our manufacturing mode?

Process manufacturing, discrete assembly and job shops need different setups.

How will you test planning output before trusting it?

Planners abandon MRP when early results are wrong.

How do you handle shop floor reporting with gloves, noise or no network?

Real floor conditions decide adoption.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Planning output is ignored.

Fix lead times, coverage and BOM accuracy first, then pilot planning with one product family.

Unexplained production variances.

Validate standard costs, routes and backflushing before go-live and review variances weekly.

Shop floor reporting is skipped.

Make reporting fast on the floor and show supervisors live WIP.

Choosing the wrong product for the plant's complexity.

Test real scenarios in both products before deciding.

If your manufacturing is simple assembly with few routings, Business Central manufacturing or even assembly orders may be enough, and your existing partner can tune it. Bring in a manufacturing specialist when costing, planning or shop floor issues persist after basic setup is checked.

Frequently asked questions

Does Dynamics 365 have manufacturing?

Yes, in two products. Supply Chain Management has discrete, process and lean manufacturing for larger operations, and Business Central has production orders, BOMs and routings for smaller manufacturers.

Business Central or Supply Chain Management for manufacturing?

Business Central suits smaller plants with simpler processes. SCM suits multi-site, process or mixed-mode manufacturing, advanced warehousing and planning.

Why does master planning create no planned orders?

Common causes are item coverage settings, missing coverage groups, plan parameters or BOM and route issues. Check coverage and plan setup first.

Can Dynamics 365 handle process manufacturing?

SCM supports formulas, batch orders, co-products and by-products, potency and batch attributes. Business Central has more limited process features.

What is production floor execution?

A touch-friendly interface in SCM for workers to start and report jobs, quantities and scrap. It replaces older job card devices for many plants.

Talk to a Microsoft Dynamics 365 consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.