D365 Finance and Supply Chain Data Entity Reference for Manufacturing
Choosing the right data entity is the first decision in any Dynamics 365 Finance and Supply Chain data load or integration. This reference groups the entities manufacturing projects touch most, with what each carries and the traps that cost consultants time.
| Area | Entity (label or OData name) | What it carries | Consultant note |
|---|---|---|---|
Product | Released products V2 (ReleasedProductsV2) | Released product master: item number, product type, units, groups | Most common item load. Legal-entity specific. Pair with the product master entity first. |
Product | Products V2 (EcoResProductV2Entity) | Shared product master, product dimensions and search names | Load before released products. Not company specific. |
Product | Released distinct products | Released products for distinct (non-variant) items | Use for simple item loads when no product variants are needed. |
Product | Product categories / category hierarchy entities | Category hierarchies and assignments for products | Hierarchy must exist before assigning products to categories. |
Product | Item coverage (per-item coverage settings) | Item coverage: coverage group, min and max, lead times by item and site | Required for master planning to behave per item. Check the entity name in your version. |
BOM | Bill of materials headers (BillOfMaterialsHeaders) | BOM header: BOM number, name, approval and active flags | Load headers before lines. Approve and activate through the import or after. |
BOM | Bill of materials lines (BillOfMaterialsLines) | BOM component lines: item, quantity, unit, line type, scrap | Watch line type (Item, Vendor, Pegged supply) and the constant scrap fields. |
BOM | Bill of materials versions | BOM versions with date and quantity validity and site | A version links a BOM to an item, site and validity window. |
Routes | Route headers and route operations entities | Route header and operations: operation number, resource requirement, times | See the Data entities form for the exact public names in your version. |
Routes | Operations (operation master) entity | Operation definitions referenced by routes | Load operations and resource groups before routes. |
Resources | Resources and resource groups entities | Work centers, machines, labor resources and groups | Resources need calendars and capabilities assigned to be schedulable. |
Resources | Calendars and calendar working times | Working time calendars used for scheduling | Master scheduling and shop floor dates depend on them. |
Production | Production order headers (ProductionOrderHeaders) | Production order header: item, quantity, status, dates, BOM and route | Used for integration and migration of open orders. Status transitions need care. |
Production | Production order BOM and route lines entities | Production order component and operation lines | Consult the Data entities form for names. Posting changes to inventory is not an entity import. |
Production | Production order picking list / route card journals | Journals that consume material and report operations | Journal entities have posting implications. Test in a non-production environment. |
Inventory | Inventory on-hand entity | Read access to on-hand by dimensions | For reads, prefer the on-hand API over bulk entity export when volume is high. |
Inventory | Inventory journal headers and lines | Counting, movement and adjustment journals for opening balances | Typical opening balance load. Posting is a separate step. |
Inventory | Warehouses and sites entities | Sites, warehouses and locations | Dimension values must exist before inventory is loaded. |
Procurement | Purchase order headers V2 (PurchaseOrderHeadersV2) | Open purchase orders header | Vendor and delivery terms must exist. Check currency and legal entity. |
Procurement | Purchase order lines V2 (PurchaseOrderLinesV2) | Purchase order lines | Use received quantity carefully when migrating partially received orders. |
Procurement | Vendors V2 (VendorsV2) | Vendor master | Party record is created with the vendor. Watch vendor groups and payment terms. |
Sales | Sales order headers V2 (SalesOrderHeadersV2) | Sales order headers | Order of load: customers, items, then orders. |
Sales | Sales order lines V2 (SalesOrderLinesV2) | Sales order lines | Delivery dates and reservations influence master planning. |
Sales | Customers V3 (CustomersV3) | Customer master | Group, currency and payment terms must be present. |
Finance | Main accounts (MainAccounts) | Chart of accounts main accounts | Shared across legal entities that use the same chart. |
Finance | Legal entities (LegalEntities) | Company list with identifiers | Use dataAreaId values when filtering OData across companies. |
Finance | General journal entities | Ledger journal headers and lines | Used for opening balances. Validate dimension formats in advance. |
Cost | Item prices and cost entities | Standard cost, price and trade agreement style records | Standard cost activation is a separate step in costing versions. |
Quality | Quality order and test entities | Quality associations, tests and results | Availability depends on enabled modules and features. |
Admin | Number sequences entities | Number sequence definitions | Do not overwrite live sequences during a cutover rehearsal. |
Entity names and exact public collection names vary by version and enabled features. Always confirm in Data management > Data entities (filter by module) before building an integration or a data project.
Map your D365 entities to a migration plan
Send us your entity list and we will review the load order and validation risks. Optional, the reference is free without it.
Optional. The tool and every export work without this. No spam.
How to use this reference
Search by area (Product, BOM, Routes, Production, Inventory) or by a term such as 'lines'. The consultant note column flags load order and posting behavior. Treat the names as a starting point, then confirm the exact entity in Data management > Data entities, where you can filter by module, see whether an entity is OData-enabled and review its staging table and target fields.
- Search a term, then export the matches to Excel for your mapping workbook
- Confirm each name in the Data entities form of your environment
- Check the 'Is public' and OData properties before building an integration
- Note legal-entity scope before you design the load per company
Load order for a manufacturing data project
Entities depend on each other. A typical order is: legal entities, calendars, sites and warehouses, units and groups, products and released products, resources and operations, routes, bills of materials and versions, item coverage, vendors and customers, then open orders and opening inventory. Loading in a different order creates avoidable validation errors, such as a BOM line referencing an item that is not yet released to the legal entity.
Data entities, OData and the integration choice
A data entity is a denormalized view over several tables. It can be used in the Data management framework (import and export through staging) and, when public, exposed as an OData collection. For high-volume reads, recurring data export or the data lake style options are usually better than paging OData. For writes with business logic, entity imports run the same validation as the form, which is slower but safer than direct table writes.
Common mistakes
The usual errors are loading a company-specific entity into the wrong legal entity, importing BOM lines before the header is approved, assuming an entity name from a previous version, and treating posting journals like simple master data. Document the entity, the sequence number in the data project and the owner of each load in your cutover plan.
Frequently Asked Questions
Where do I find the exact data entity name in D365?
Open Workspaces > Data management, then the Data entities tile. Filter by module, search by label, and check the entity name, staging table and whether it is public. The public collection name is what an OData URL uses, and it can differ from the label.
What is the difference between ReleasedProductsV2 and ProductsV2?
The shared product (EcoResProductV2Entity) is company independent and holds the product master. Released products are the per-legal-entity record with units, groups and item model data. Load the shared product first, then release it to the legal entity.
Can I import production orders through data management?
You can, through the production order entities, and projects do it for open work in progress. Status, reservations and inventory postings need careful design, so most teams migrate open orders at a defined status and test in a sandbox before any production load.
Do entity names change between versions?
Yes. New versions are added with a V2 or V3 suffix and older ones are deprecated over time. Features also change which entities are available. Always verify against your environment instead of copying names from older documentation.
If you want these entities queried by plain language over your own D365 data, with the query shown and role security respected, we can scope that with you.
Related Tools
D365 F&O OData URL Builder
Fill in your environment, entity and query options to get a correctly formed D365 F&O OData request and a sample OAuth token call.
Microsoft DynamicsD365 Data Management Import Worksheet Template
Track every D365 DMF import by entity, sequence, legal entity, rows loaded and errors, with an automatic error rate for cutover reporting.
Microsoft DynamicsD365 Production Order Status Reference
A searchable table of production order statuses and the process steps between them, with what each status allows and what to check before moving on.
Microsoft DynamicsD365 Master Planning Setup Checklist
A step-by-step checklist for configuring and validating master planning in D365 Supply Chain Management, from parameters to a trustworthy planning run.
More Microsoft Dynamics tools
See all- D365 Batch Job Checklist
- D365 Security Role Design Worksheet
- D365 One Version Update Test Checklist
- D365 Finance and Supply Chain Functional Design Document Template
- D365 Finance and Supply Chain Fit-Gap Analysis Worksheet
- D365 Finance and Supply Chain Data Migration Mapping Worksheet
- D365 Finance and Supply Chain Cutover Plan Template
- D365 Finance and Supply Chain UAT Test Case Worksheet
- D365 Finance and Supply Chain Integration Interface Register
Keep exploring
Free tools
- D365 F&O Order and Inventory Transaction Status ReferenceSearchable list of status and document status values for sales, purchase and transfer orders and inventory transactions in D365 F&O.
- D365 Production Order Status ReferenceA searchable table of production order statuses and the process steps between them, with what each status allows and what to check before moving on.
- D365 Finance and Supply Chain Implementation Effort EstimatorA rough-order estimate of D365 F&O implementation hours and cost from modules, legal entities, integrations, extensions, migration objects and reports.
ERP fixes and how-tos
- Dynamics 365 Supply Chain Management API: OData, Custom Services and Data PackagesD365 Supply Chain / F&O APIs explained: OData data entities, custom services, the data management package API, Entra ID authentication and when to use each.
- Dynamics 365 Supply Chain Wave Planning and Inventory JournalsHow wave planning and inventory journals work in Dynamics 365 Supply Chain Management: wave templates, wave steps, work templates, journal names and posting.
- Dynamics 365 Supply Chain Warehouse Only Mode: What It Is and Its LimitsWhat warehouse management only mode is in Dynamics 365 Supply Chain Management, how to enable it, how orders arrive as shipment orders, and its limits.
AI on your ERP
- AI for Dynamics 365 Finance and Supply Chain beyond CopilotAI for D365 Finance and Supply Chain beyond Microsoft Copilot: private LLM grounded on data entities and OData, on-prem-capable via Local Business Data.
- Dynamics 365 AI Consulting: Copilot, Agents and Private AI for Finance, Supply Chain and Business CentralDynamics 365 AI consulting for Finance, Supply Chain and Business Central: Copilot, agents, Copilot Studio, private models and on-prem deployments, explained.
Integrations
- How to add WhatsApp to Dynamics 365 Finance and Supply ChainHow to add WhatsApp to Dynamics 365 Finance and Supply Chain: business events, OData entities, Cloud API templates, opt-in rules and two-way replies.
- How to build an MCP server for Dynamics 365 Finance and Supply ChainBuild a Model Context Protocol server for Dynamics 365 Finance and Supply Chain: tools to expose, Entra auth, transports, scoping and audit for any MCP client.
Software
- Microsoft Dynamics 365 Finance and Supply ChainDynamics 365 Finance and Supply Chain Management explained for manufacturers: modules, data entities, OData, deployment, strengths, limits and alternatives.
- Dynamics 365 Field ServiceDynamics 365 Field Service handles work orders, resource scheduling and mobile technicians on Microsoft Dataverse. Modules, integrations and alternatives.