SAP health check and audit: technical, security and control review
An SAP health check tests whether the system is fast, stable, secure and controlled, using evidence from the system itself: EarlyWatch Alert reports, workload statistics, the Security Audit Log, authorisation data, transport history and custom code checks. Many organisations run it alongside an internal or external SAP audit, so findings should be ones auditors accept, not just tuning tips.
When this makes sense
- Users complain about slow transactions or month-end jobs that overrun
- Auditors raised findings on SAP access, change management or logging
- You inherited an SAP landscape through an acquisition or a change of support partner
- You plan an S/4HANA conversion or cloud move and need a clear picture of the current state
- Nobody has looked at EarlyWatch Alert reports or SAP security notes for months
What the engagement covers
Performance and stability
Workload analysis in ST03N, expensive SQL statements, short dumps in ST22, update errors in SM13, work process use in SM50 and SM66, and job runtimes in SM37.
Security configuration
Password and logon profile parameters, RFC destination security, gateway access control lists (secinfo and reginfo), default users such as SAP* and DDIC, and missing notes from SAP Security Patch Day.
Audit logging
Security Audit Log set-up (SM19 and SM20, or RSAU_CONFIG and RSAU_READ_LOG on newer releases), table change logging with rec/client and SCU3, and change documents on critical master data.
Authorisations and segregation of duties
Users holding SAP_ALL or SAP_NEW, critical transactions via SUIM and RSUSR002, firefighter usage, and SoD conflicts with or without GRC Access Control.
Change management
Client settings in SCC4, transport routes and history in STMS and table E070, direct changes in production and the emergency change procedure.
Database and housekeeping
Growth by table, archiving candidates, spool, job log and IDoc housekeeping, and evidence of tested backup restores.
Custom code
ATC or Code Inspector findings for security and performance, unused Z objects and code with no owner. AI-assisted review can triage large finding lists so people focus on the risky ones.
How it runs
- 1
Data collection (1-2 weeks)
- Collect EarlyWatch Alert, workload and dump statistics
- Extract security parameters, users and roles
- Pull transport and client change history
- 2
Analysis (2-3 weeks)
- Trace performance hot spots to root causes
- Assess security settings against SAP's security baseline guidance
- Analyse critical access and SoD conflicts
- 3
Findings and roadmap (1-2 weeks)
- Rate each finding by risk and effort
- Separate quick fixes from changes that need testing
- Present to IT and audit stakeholders
What you get
- Health check report with findings rated by risk and effort
- Security settings review against SAP's security baseline guidance
- Critical access and SoD conflict list with suggested mitigations
- Performance list covering top transactions, jobs and SQL statements
- Change management and logging assessment written for auditors
- Remediation roadmap with named owners
What drives cost and effort
| Systems and clients in scope | Production only is far quicker than the whole landscape including BW, PI/PO and non-production. |
| Depth of security review | A configuration check is lighter than a full role and SoD analysis. |
| Available tooling | Solution Manager, Focused Run or GRC data speeds the work; without them more data is extracted by hand. |
| Custom code volume | Large Z code bases need more ATC runs and triage. |
| Audit framework mapping | Mapping findings to a specific control framework or auditor checklist adds documentation effort. |
Fixed-scope health check
Organisations that want a point-in-time view of performance, security and controls.
Audit readiness project
Teams preparing for, or responding to, specific audit findings.
Recurring quarterly review
Landscapes that want trend tracking of EarlyWatch results, security notes and access risk.
Questions to ask any SAP consultant
Will you work from system evidence or from questionnaires?
Findings based on parameters, logs and usage data hold up with auditors; interviews alone do not.
Which security baseline will you measure against?
A named baseline makes findings repeatable and comparable year on year.
How do you separate quick fixes from changes that need testing?
Some changes, such as gateway ACLs, can break interfaces if applied untested.
Can you analyse SoD without GRC Access Control?
Not every customer owns GRC, but conflicts still need a credible rule set.
Will you also fix the findings, and how is that priced?
Some reviewers write long lists to sell remediation; ask for an effort estimate per finding.
What will you need from our Basis and security teams?
Access and extracts take internal time that should be planned.
Score candidate partners side by side with the free Implementation Partner Scorecard
Where these projects go wrong
A report full of problems with no priorities
Require findings rated by risk and effort, each with an owner.
Security changes that break interfaces
Test gateway, RFC and parameter changes in non-production first.
Audit logging switched on with no storage plan
Size the Security Audit Log and set retention and review responsibility.
Findings forgotten after the review
Track remediation through normal change control and recheck after three to six months.
If you have SAP Enterprise Support, EarlyWatch Alert and some SAP services already give a solid first view at no extra cost, and your Basis team may be reviewing them. An external health check is worth it when nobody owns those reports, when auditors want independent evidence, or before a major change such as an S/4HANA conversion.
Frequently asked questions
What is SAP auditing?
It is the review of SAP controls: who can do what, how changes reach production, what is logged and whether critical settings follow policy. Auditors typically sample user access, transport history and logs.
How do you enable the SAP Security Audit Log?
Activate it through the relevant profile parameters and define filters in SM19, or RSAU_CONFIG on newer releases, then read events in SM20 or RSAU_READ_LOG. Plan storage, retention and who reviews the log.
What is the SAP Security Optimization Service?
It is an SAP service that checks a system's security configuration and reports risks. Availability depends on your support agreement, and it complements rather than replaces an access and SoD review.
How often should we run an SAP health check?
Many organisations review EarlyWatch Alert and security notes monthly and run a deeper check yearly or before major changes. The monthly pass catches drift early, while the yearly check looks at architecture, custom code growth and authorisations in depth.
Does a health check cover SAP licences?
It can include user type and usage checks, but licence optimisation is usually separate because it needs contract data. Keep the two linked, because usage findings from the health check are the evidence a licence review needs.