ERP toolkits / SAP
SAP S/4HANA (on-premise) toolkit
SAP S/4HANA on-premise and private cloud editions keep the system under the customer's control, unlike the public cloud edition.
Free tools that run in your browser, fixes written for admins and developers, and how to put a private AI assistant on top of SAP S/4HANA (on-premise) without your data leaving your servers.
Plan your SAP S/4HANA work
Free planning apps built for SAP S/4HANA (on-premise). Your work saves to your Netray account.
Training Path Builder
Week by week ERP training plans by role and module, with real screens to practice on, dated lessons, progress tracking and export.
ERP Certification Study Planner
Study plans for ERP certifications built from the official exam objectives, re-weighted toward your weak areas, with progress, readiness and exam-day deadlines.
Upgrade Path Planner
Pick your current and target ERP release and describe your landscape. Get the verified upgrade path, the changes in every release you cross, a risk score, an effort range and a regression test plan.
ERP Table and Field Explorer
Search the core database tables of SyteLine, LN, M3, JD Edwards, SAP, Oracle EBS, NetSuite, Epicor and SYSPRO by name, field or description, see keys and joins, and generate a JOIN query skeleton.
Integration and EDI Designer
Pick business objects and target systems and get the ERP's real interface for each flow (BODs, IDocs, APIs, open interface tables, EDI documents), a field-level starter map and effort notes.
Module Fit and Gap Explorer
Map your manufacturing requirements to an ERP's official modules, see native fit, add-ons and gaps, and compare two ERPs side by side.
ERP Cost of Ownership Model
Five-year ERP total cost model built from your own license or subscription quotes: users, deployment, infrastructure, implementation effort, staff and support.
Implementation Partner Scorecard
Weighted scorecard and ERP-specific interview question bank for comparing ERP implementation partners and consultants.
Design private AI for SAP S/4HANA (on-premise)
The builder starts with SAP S/4HANA (on-premise) connected the way it supports. Pick a model and GPUs, add documents, and export the architecture.
Loading the architecture builder...
Free SAP S/4HANA (on-premise) tools
Calculators and simulators (86)
- SAP Reorder Point and Safety Stock Field Calculator
- SAP MRP Lot Sizing Cost Comparison Calculator
- SAP MRP Reorder Point and Safety Stock Calculator
- SAP Moving Average Price (MAP) Calculator
- SAP Invoice Verification Tolerance Calculator
- SAP MRP Rounding Value and Lot Size Order Quantity Calculator
- SAP Consignment vs Owned Stock Cost Calculator
- SAP Three-Way Match and Invoice Tolerance Calculator
- SAP Work Center Capacity Planning Calculator
- SAP Total Replenishment Lead Time Calculator
- SAP PP Safety Stock and Reorder Point Calculator
- SAP PP Economic Production Quantity Lot Size Calculator
- SAP PP Work Center Available Capacity and Load Calculator
- SAP PP Operation Lead Time Scheduling Calculator
- SAP PP Kanban Quantity and Container Calculator
- SAP PP Production Order Variance Calculator
- SAP SD Rebate Accrual Calculator
- SAP SD Pricing Condition Price Calculator
- SAP SD Volume Rebate Accrual Calculator
- SAP SD Credit Exposure Simulator
- SAP SD ATP Availability Check Calculator
- SAP SD Delivery Scheduling Date Calculator
- SAP SD Milestone Billing Plan Calculator
- SAP Standard Cost Variance Calculator
- SAP Activity Type Rate Calculator
- SAP Overhead Rate and Absorption Calculator
- SAP Asset Depreciation Calculator
- SAP Costing Sheet Overhead Rate Calculator
- SAP Production Order WIP Calculator
- SAP Purchase Price Variance and Moving Average Price Calculator
- SAP Foreign Currency Valuation Calculator
- SAP Payment Terms Cash Discount Calculator
- SAP Cost Center Assessment Allocation Calculator
- SAP Material Ledger Periodic Unit Price Calculator
- SAP Fiscal Year and Posting Period Calculator
- SAP QM Dynamic Modification Rule Calculator
- SAP QM Zero Acceptance Sample Size Calculator
- SAP QM OC Curve and Acceptance Probability Calculator
- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Inspection Effort and Cost Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- SAP Maintenance Plan Scheduling Calculator
- SAP PM Preventive Maintenance Compliance Calculator
- SAP PM Maintenance KPI Calculator (MTBF, MTTR, Backlog)
- SAP EWM Picker Headcount and Resource Sizing Calculator
- ABAP Development Effort Estimator
- ABAP FOR ALL ENTRIES vs SELECT in LOOP Runtime Calculator
- ABAP Background Job Runtime and Batch Window Calculator
- SAP Dialog Work Process Sizing Calculator
- S/4HANA Custom Code Remediation Effort Calculator
- ABAP Internal Table Memory Size Calculator
- SAP Number Range Exhaustion Calculator
- SAP User Access Review Sample Size Calculator
- SAP HANA Memory Sizing Calculator
- SAP Transport Import Window Calculator
- SAP User License Optimization Calculator
- SAP SoD Residual Risk Score Calculator
- SAP Background Job Capacity Calculator
- SAP Dialog Work Process Estimator
- SAP IDoc Backlog Clearance Time Calculator
- SAP IDoc Database Growth Calculator
- SAP IDoc Processing Work Process Sizing Calculator
- SAP IDoc Error Backlog Clearance Calculator
- SAP OData Pagination and Extraction Time Calculator
- SAP RFC Connection Pool Sizing Calculator
- SAP RISE vs On-Premise TCO Calculator
- SAP Custom Code Remediation Estimator
- SAP S/4HANA Migration Business Case Payback Calculator
- S/4HANA Conversion Downtime Window Calculator
- S/4HANA HANA Memory Sizing Estimator
- S/4HANA Migration Business Case NPV Calculator
- SAP Migration Schedule Risk PERT Calculator
- SAP Migration Project Team Cost Calculator
- S/4HANA User Licence Cost Estimator
- SAP Variant Combination and Test Scope Calculator
- SAP Variant Combination Explosion Calculator
- SAP Variant Condition Pricing Calculator
- SAP VC Material Master Reduction Calculator
- SAP Engineering Change Obsolescence Exposure Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
- SAP VC Order Entry Time Savings Calculator
- SAP Variant Configuration Combination Calculator
- SAP QM Sample Size Calculator by Lot Size and Sampling Procedure
- SAP S/4HANA On-Prem AI Assistant Sizing and Value Calculator
Code and document generators (102)
- SAP Release Strategy Design Template
- SAP Source List Upload Template
- SAP Physical Inventory Count Sheet Template
- SAP Purchase Requisition Approval Form Template
- SAP Material Master Creation Request Form Template
- SAP Goods Receipt Discrepancy Report Template
- SAP Open Purchase Order Items ABAP SELECT Generator
- SAP Open PO Items ABAP SELECT Generator
- SAP BAPI_PO_CREATE1 ABAP Skeleton Generator
- SAP MRP Controller Daily Worklist Template
- SAP Work Center Master Data Request Template
- SAP PP Master Data Change Request Template
- SAP Production Order Variance Review Template
- SAP PP Business Blueprint Workshop Template
- SAP Open Production Orders ABAP SELECT Generator
- SAP BAPI Production Order Create and Release ABAP Template
- SAP Delivery Block Reasons Template
- SAP SD Enhancement Functional Specification Template
- SAP SD Partner Determination Design Template
- SAP SD Rebate Agreement Request Form Template
- SAP SD Sales Order Item ABAP SELECT Generator
- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP GL Account Master Data Request Template
- SAP Vendor Master Change Request Form Template
- SAP Internal Order Budget Request Template
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Sampling Procedure Design Template
- SAP QM Inspection Plan Design Template
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- SAP Functional Location Structure Template
- SAP Equipment Master Data Template
- SAP PM Breakdown Notification Request Form Template
- SAP PM Shutdown and Turnaround Work Package Template
- SAP PM Work Clearance and Work Permit Template
- SAP PM Open Maintenance Orders ABAP SELECT Generator
- SAP PM Equipment and Functional Location SQL Generator
- SAP PM Order Create BAPI ABAP Skeleton (BAPI_ALM_ORDER_MAINTAIN)
- SAP WM Open Transfer Order ABAP SELECT Generator
- SAP WM Bin Stock LQUA ABAP Report Generator
- ABAP SELECT Statement Generator
- ABAP Internal Table Declaration Generator
- BAPI_PO_CREATE1 Call Skeleton Generator
- ABAP ALV Report Skeleton Generator
- ABAP Naming Convention Template
- ABAP CDS View Skeleton Generator
- ABAP Functional Specification Template
- ABAP Technical Design Document Template
- ABAP Technical Specification Template
- ABAP BAPI Return Handling and Commit Generator
- SAP User Access Review Template
- SAP Background Job Scheduling Template
- SAP Firefighter Emergency Access Request Template
- SAP Role Change Request Form Template
- SAP Security Incident Report Template
- SAP ABAP AUTHORITY-CHECK Snippet Generator
- SAP Inactive Users ABAP Report Generator
- SAP OData Service URL Builder
- SAP API Business Hub Request Generator
- SAP IDoc Partner Profile (WE20) Setup Template
- SAP IDoc Error Incident Ticket Template
- SAP IDoc Reprocessing Runbook Template
- SAP Integration Technical Specification Template
- SAP IDoc Interface Specification Document Template
- SAP ABAP Outbound IDoc Code Generator (MASTER_IDOC_DISTRIBUTE)
- SAP ABAP IDoc Status Query Generator (EDIDC and EDIDS)
- SAP BAPI_GOODSMVT_CREATE ABAP Code Generator
- SAP Go-Live Hypercare Plan Template
- SAP S/4HANA Project Charter Template
- SAP S/4HANA Steering Committee Status Report Template
- S/4HANA Steering Committee Status Report Template
- SAP CVI Business Partner Gap Report ABAP Generator
- SAP Custom Code Inventory ABAP Query Generator (TADIR)
- SAP HANA Largest Tables SQL Query Generator
- SAP Object Dependency Syntax Template
- SAP Document Info Record Template
- SAP Configuration Profile Setup Template
- SAP Engineering Change Request (ECR) Template
- SAP Variant Configuration Sales Order UAT Script Template
- SAP Configurable Material Selection ABAP Generator
- SAP Classification Values ABAP Generator
- SAP BOM Where-Used SQL Generator
- SAP Open Outbound Deliveries ABAP Generator
- SAP Change Number BOM ABAP Select Generator
- SAP MBEW Price Control ABAP SELECT Generator
- SAP MBEW Material Valuation ABAP SELECT Generator
- SAP Process Order ABAP SELECT Snippet Generator (AUFK, AFKO, AFPO)
- SAP Batch Shelf Life Expiry Stock SQL Query Generator (MCH1, MCHB)
- SAP Installed Base Equipment ABAP SELECT Generator
- SAP Packaging Materials (VERP) ABAP SELECT Generator
- SAP VAT Tax Code ABAP SELECT Generator
- SAP Outline Agreement Expiry ABAP SELECT Generator
- SAP Manufacturing Order Table Join SQL Generator
- SAP S/4HANA Production Order Tables and Join SQL Generator
- SAP Global Template Rollout Plan Template
- SAP Purchase Order Example, Format and Document Types
- SAP MM Support Ticket Template and Examples
- SAP S/4HANA On-Prem Private AI Layer Blueprint Generator
- ABAP CDS Table Function with AMDP Generator
Reference tables and worksheets (132)
- SAP Movement Types Reference
- SAP Purchasing Document Types Reference
- SAP GR/IR Clearing Worksheet
- SAP Info Record Mass Upload Worksheet
- SAP MRP Type Reference
- SAP Vendor Evaluation Scorecard Worksheet
- SAP Subcontracting Component Tracking Worksheet
- SAP Scheduling Agreement Delivery Schedule Worksheet
- SAP Material Valuation and Price Unit Worksheet
- SAP MM Transaction Codes Reference
- SAP MM Tables and Key Fields Reference
- SAP PO Item Category, Account Assignment and Special Stock Reference
- SAP Production Order Types, Categories and Statuses Reference
- SAP MD04 Exception Messages and MRP Elements Reference
- SAP Routing Upload Worksheet (Excel)
- SAP BOM Usage, Status and Item Category Reference
- SAP Lot Sizing Procedures and MRP Parameters Reference
- SAP MRP Material Parameters Worksheet
- SAP Work Center Weekly Load Worksheet
- SAP PP Cutover Data Load Tracker
- SAP PP BOM Component Scrap and Requirements Worksheet
- SAP PP Transaction Codes Reference
- SAP PP Database Tables Reference
- SAP MRP Types and MD01 Run Parameters Reference
- SAP Procurement Type and Special Procurement Key Reference
- SAP Sales Document Types Reference
- SAP Pricing Procedure Design Worksheet
- SAP Item Category Determination Reference
- SAP Billing Types Reference
- SAP SD Condition Record Load Worksheet
- SAP SD Customer Master Sales Area Load Worksheet
- SAP SD Copy Control Design Worksheet
- SAP SD Transaction Codes Reference
- SAP SD Tables Reference (VBAK, VBAP, LIKP, VBRK and More)
- SAP SD Pricing Condition Types Reference (PR00, K004, MWST)
- SAP SD Configuration Transactions and IMG Reference
- SAP Cost Element Categories Reference
- SAP Document Types Reference
- SAP Posting Keys Reference
- SAP Cost Center Hierarchy Upload Worksheet
- SAP CO-PA Value Field Mapping Worksheet
- SAP Fixed Asset Depreciation Schedule Worksheet
- SAP Accrual Journal Entry Worksheet
- SAP Intercompany Reconciliation Worksheet
- SAP Foreign Currency Valuation Worksheet
- SAP FICO Transaction Codes Reference
- SAP FICO Database Tables Reference
- SAP Special G/L Indicators Reference
- SAP QM Inspection Types Reference
- SAP QM Usage Decision Codes Worksheet
- SAP QM Quality Notification Types Reference
- SAP Master Inspection Characteristic Upload Worksheet
- SAP QM Inspection Lot Origins Reference
- SAP QM Master Data Cutover Tracker Worksheet
- SAP QM Inspection Plan Planning Worksheet
- SAP QM Database Tables Reference
- SAP QM Transaction Codes Reference
- SAP PM Maintenance Order Types, Tables and Transactions Reference
- SAP PM Notification Types, Tables and Statuses Reference
- SAP PM Task List Upload Worksheet
- SAP PM Measuring Point and Counter Readings Worksheet
- SAP PM Maintenance BOM and Spare Parts Cost Worksheet
- SAP PM Spare Parts Kitting and Reservation Worksheet
- SAP PM Catalog and Code Group Design Worksheet
- SAP PM Database Tables Reference
- SAP PM Transaction Codes Reference
- SAP PM Order and Notification Status Reference
- SAP WM and EWM Warehouse Tables Reference
- SAP WM and EWM Transaction Codes Reference
- SAP WM to EWM Terminology Map
- SAP System Fields Reference (SY-SUBRC, SY-DATUM and more)
- SAP Transport Request Log Worksheet
- ABAP Unit Test Case Worksheet
- ABAP Field Mapping Specification Worksheet
- SAP RICEFW Object Inventory Worksheet
- ABAP RICEFW Estimation Worksheet
- SAP Core Tables and Key Fields Reference
- SAP Role Design Worksheet
- SAP Critical Authorization Objects Reference
- SAP Segregation of Duties Conflict Matrix Worksheet
- SAP System Landscape Inventory Worksheet
- SAP SoD Mitigating Control Register Worksheet
- SAP Profile Parameter Change Log Worksheet
- SAP Firefighter ID Usage Review Log
- SAP Basis Transaction Codes Cheat Sheet
- SAP User Types and Default Users Reference
- SAP IDoc Message Types Reference (ORDERS, DESADV, INVOIC, MATMAS, DEBMAS)
- SAP IDoc Status Codes Reference
- IDoc to EDI X12 Mapping Worksheet (INVOIC to 810)
- SAP Interface Inventory Register Worksheet
- SAP Interface Volume and Storage Sizing Worksheet
- SAP Integration Test Case Matrix Worksheet
- SAP IDoc Control Record (EDIDC) Fields Reference
- SAP IDoc and ALE Transactions, Tables and Programs Reference
- SAP OData V2 and V4 Query Options Reference
- S/4HANA Simplification Item Worksheet
- SAP Data Migration Object Worksheet
- SAP Fit-to-Standard Workshop Log
- SAP Migration RAID Log Worksheet
- SAP Cutover Runbook Timing Worksheet
- SAP S/4HANA Test Scenario Tracker
- SAP Business Partner CVI Conversion Worksheet
- S/4HANA Migration Risk Register Worksheet
- SAP S/4HANA Key Simplifications Reference
- SAP ECC Obsolete Transactions and S/4HANA Replacements
- SAP S/4HANA Conversion and Migration Tools Reference
- SAP Characteristic and Class Design Worksheet
- SAP Super BOM Design Worksheet
- SAP Configurable Material Test Matrix Worksheet
- SAP Material Type Reference (FERT, HALB, ROH, HAWA)
- SAP Variant Condition Pricing Worksheet
- SAP Variant Table Maintenance Worksheet
- SAP Change Master and Revision Level Log
- SAP BOM Usage and Item Category Reference
- SAP Engineering Change Affected Materials Impact Worksheet
- SAP Variant Configuration Tables Reference
- SAP Variant Configuration Transaction Codes
- SAP BOM Category, Usage and Item Category Codes
- SAP Controlling (CO) Database Tables Reference
- SAP SD Document Category (VBTYP) Reference
- SAP S/4HANA Replaced FI and CO Tables Reference
- SAP MM Table Relationships and Join Keys Reference
- SAP QM Tables Map: Notification, Inspection Plan and Results
- SAP PP Tables Map: Orders, Routings, Resources and PIR
- SAP MM and QM BAPI and API List Reference
- SAP PP Test Scenarios and Test Script Worksheet
- SAP QM Tables Relationship Map and Key Joins
- SAP MM BPML Business Process Master List Template
- SAP MM Output Form Templates List
- SAP ECC MM and SD Tables Replaced in S/4HANA Reference
- ABAP CDS Annotations Reference (Common On-Premise Annotations)
- SAP SUM 2.0 Roadmap Phases Reference (Upgrade, Conversion, DMO)
Checklists (37)
- SAP MIGO Goods Receipt Checklist
- SAP Physical Inventory Count Checklist
- S/4HANA MM Simplification Readiness Checklist
- SAP Planned Order to Production Order Conversion Checklist
- SAP PP Go-Live Master Data and Cutover Checklist
- SAP Credit Management Checklist
- SAP Output Determination Checklist
- SAP Incompletion Log Checklist
- SAP SD Go-Live and Cutover Readiness Checklist
- SAP Period End Closing Checklist
- SAP F110 Payment Run Checklist
- SAP QM in Procurement Setup Checklist
- SAP QM Implementation Readiness Checklist
- SAP QM Go-Live and Cutover Checklist
- SAP PM Maintenance Order Settlement Checklist
- SAP PM Go-Live Readiness Checklist
- SAP WM to EWM Migration Readiness Checklist
- ABAP Code Review Checklist
- SAP Transport Import and Go-Live Checklist
- ABAP Transport Request Release Checklist
- ABAP Performance Tuning Checklist
- SAP Transport Request Checklist
- SAP System Copy Checklist
- SAP Kernel Upgrade Checklist
- SAP Go-Live Security Readiness Checklist
- SAP Daily Basis Health Check Checklist
- SAP RFC Destination Setup Checklist (SM59)
- SAP Batch Input Session Checklist (SM35)
- SAP IDoc Interface Go-Live Checklist
- SAP S/4HANA Migration Cutover Checklist
- SAP S/4HANA Pre-Conversion Technical Checklist
- SAP Engineering Change Number Checklist
- SAP AVC Migration Checklist
- SAP VC Model Design Review Checklist
- SAP New Plant Setup Checklist
- SAP MM Configuration Checklist (SPRO)
- SAP S/4HANA On-Premise Release Upgrade Checklist (e.g. 2021 to 2023)
Assessments (12)
- SAP PP Planning Process Maturity Assessment
- SAP Order-to-Cash (SD) Health Assessment
- SAP S/4HANA Finance Migration Readiness Assessment
- SAP QM Maturity Assessment
- SAP PM Process Maturity Assessment
- SAP EWM Go-Live Readiness Assessment
- SAP Basis Security Hardening Assessment
- SAP Integration Readiness Assessment
- ECC to S/4HANA Readiness Assessment
- SAP Greenfield vs Brownfield Assessment
- SAP Clean Core Extensibility Assessment
- SAP Variant Configuration Readiness Assessment
Guides
Private AI layer architecture (1)
How-to and fixes (108)
- SAP M7 021: Deficit of SL Stock Quantity
- SAP IDoc Status 51: Application Document Not Posted
- SAP Short Dump TIME_OUT: Maximum Runtime Exceeded
- How to Read MD04 Exception Messages in SAP
- How to Use BAPI_TRANSACTION_COMMIT Correctly
- SAP F5 060: Posting Only Possible in Periods X and Y
- SAP KI 235: G/L Account Requires an Assignment to a CO Object
- SAP VL150: Collective Processing of Documents Due for Delivery
- SAP CO11N Confirmation Errors and How to Fix Them
- SAP SE16N vs SQVI: Table Browser vs Ad Hoc Query
- SAP ECC 2027: what mid-size manufacturers should actually do
- SAP ME21N: why the release strategy is not determined on a purchase order
- SAP MIGO error M7 053: posting only possible in periods X and Y
- SAP MIRO: invoice blocked for price variance, and how to release it in MRBR
- SAP GR/IR clearing account balance: reconcile with MB5S and clear with MR11
- SAP open purchase orders report: ME2N, ME2M, ME2L and the underlying tables
- SAP MD01N (MRP Live) vs MD01: How to Run MRP Correctly
- SAP Production Order Technically Complete (TECO): Set and Reverse in CO02
- SAP CO01 Error: No Production Version Found for Material
- SAP QM: Inspection Lot Not Created at Goods Receipt
- SAP QA11 Usage Decision: Make It and Post Stock Correctly
- SAP VF04 Billing Due List Is Empty: Why Documents Do Not Appear
- SAP Sales Order Incompletion Log in VA01/VA02: Fix and Configure
- SAP Pricing Error: Condition Record Missing for PR00 in a Sales Order
- SAP F110 Payment Run: No Payments and the Exception List
- SAP AFAB Depreciation Run: Fix Errors, Restart and Reverse
- What Is First Article Inspection in SAP, and How to Run It in QM
- SAP Table for Routing and Work Center, Work Orders and Capacity
- SAP QM Integration With LIMS: How the Hand-Off Works
- SAP QM Integration With EWM and WM: Steps and Configuration
- How to Create a MIC (Master Inspection Characteristic) in SAP QM
- How to Create a Sampling Procedure in SAP QM
- How to Cancel a Usage Decision in SAP QM
- Define QM Procurement Key Error in SAP: What It Means and the Fix
- Planning Strategy 40 in SAP PP, with a Worked Example
- Capacity Leveling in SAP PP, with an Example
- SAP MM Errors and Solutions: The Common Ones, by Process Step
- Pricing Procedure in SAP MM, with a Worked PO Example
- SAP MM Approval Process: Release Strategies, Workflow and Fiori
- SAP S/4HANA API Documentation: Where It Is and How to Use It
- SAP MM Error Messages List: Reading Codes and Changing Message Severity
- SAP MMPV Period Closing Error: Opening and Closing MM Periods
- Release Strategy in SAP MM Not Working: A Troubleshooting Checklist
- How to release (and cancel) an inspection lot in SAP QM
- How to create an inspection plan in SAP QM (QP01)
- How to create a quality notification in SAP QM (QM01) and set up an 8D report
- SAP QM inspection results report: which tcode shows what
- SAP QM SPC: control charts, Cpk and stability studies
- SAP MM price determination: pricing procedure, condition types and fixing wrong PO prices
- Landed cost in SAP MM: planned and unplanned delivery costs
- How to create a material in SAP MM (MM01) and mass-change it with MM17
- How to create a routing, work center and production supervisor in SAP PP
- SAP S/4HANA upgrade steps: a runbook for manufacturers
- SAP PP End to End Configuration: Steps, IMG Paths and Process Flow
- How to Create a Control Key in SAP PP (OPJ8)
- How to Create a Master Recipe in SAP PP-PI (C201)
- How to Reverse or Cancel a Usage Decision (UD) in SAP QM
- How to Create a Selected Set in SAP QM (QS51)
- How to Create a Status Profile in SAP QM (BS02)
- How to Create an Inspection Method in SAP QM (QS31)
- SAP Error: Define QM Procurement Key (How to Fix It)
- SAP QM Sample-Drawing Procedure: Setup and Use (QPV1)
- SAP MM Pricing Procedure Configuration (Calculation Schema, M/08)
- Freight Cost in SAP MM: Planned and Unplanned Delivery Costs
- SAP MM BAPI for PO Create and Change: BAPI_PO_CREATE1 and BAPI_PO_CHANGE
- How to Create a Plant in SAP MM and Configure the Organizational Structure
- SAP MM Return to Vendor Process: Return PO, MIGO 161 and Credit Memo
- MMPV Date Check Error in SAP: Causes and Fix
- SAP Error Message MM899 and the Most Common MM Error Messages
- SAP PP Standard Reports: COOIS, CO46, MD04, CM01, CS12 and PPIO_ENTRY
- SAP S/4HANA Intercompany Process Setup Guide: STO, Pricing, Billing and Reconciliation
- How to Create a Material in SAP S/4HANA: MM01, Fiori and Manufacturing Views
- IDocs for SAP PP: LOIPRO, LOIROU and PORDCR Configuration and Monitoring
- MMPV and MMRV in SAP: Which Table, and What They Control
- SAP PO Report by Creator: Transactions and EKKO-ERNAM
- PO Not Released in SAP: Release Strategy, ME28 and ME29N Fixes
- MPS in SAP PP: PIRs (MD61), MPS Items and the MD40 Run
- Phantom Assembly in SAP PP: Setup, Example and MRP Behaviour
- SAP PP, PM and MM API: Production Orders, Maintenance Orders and Material Master
- SAP S/4HANA API Guide: Business Hub, OData, Public Cloud and Business Partner
- Calling SAP APIs from Python: OData with requests, Authentication and PyRFC
- How to Reverse a Usage Decision in SAP QM
- Inspection Results and Inspection Plan Reports in SAP QM
- Production version in SAP S/4HANA: how to create it and why it is required
- SAP: error in determining actual costs for order (and valuation with material cost estimate errors)
- API_MATERIAL_STOCK_SRV: reading SAP stock by plant and storage location with OData
- Material Classification Report in SAP PP (CL30N, Tables and Queries)
- SAP PP-PI and the PI Sheet Explained
- Cost Center in SAP MM: Purchase Orders and Goods Issues
- SAP PO Print Preview Not Working in ME21N and ME9F
- Contract, MMBE and PPV Reports in SAP MM
- SAP S/4HANA Standard Reports: Fiori, Embedded Analytics and CDS Views
- SAP Procure-to-Pay (PTP) Reporting: Reports, Tcodes and Tables
- How to Create a Purchase Order in SAP MM (ME21N)
- SAP PP Tolerance Keys: Overdelivery, Underdelivery and OMR6
- SAP QM Valuation Mode and Valuation Rule: Where Set and How They Decide
- SAP QM Sample Label Printing: How to Print Physical Sample Labels
- SAP MM Contract T-Codes: ME31K, ME32K, ME33K and Release Orders
- SAP MMBE Stock Overview: How to Run It, Read It and When to Use MB52 or MD04
- SAP Purchase Price Variance (PPV) Report: T-Codes, Accounts and Analysis
- SAP PP and MM Enhancement Examples: User Exits, BAdIs and Enhancement Spots
- API Creation Process in SAP S/4HANA: From CDS View to OData Service
- Printer Not Working in SAP: Troubleshooting Spool Requests with SP01 and SPAD
- SAP MM Order Creation: ME21N Step by Step and the Procure-to-Pay Process
- SAP: 'This Function Is Not Possible' - Causes and How to Diagnose
- Batch Report in SAP PP: Where-Used and Traceability Tcodes
- SAP S/4HANA Material Groups: Configure, Assign and Report
- SAP PM Reports: Key Plant Maintenance Tcodes and What They Answer
Add-on products that run with it (50)
- Nagarro Invoice Scanner for SAP S/4HANA
- delaware Production Scheduling Board with SAP S/4HANA
- Experlogix CPQ with SAP S/4HANA
- Embedded SAP Transportation Management in S/4HANA
- SAP Digital Manufacturing and SAP S/4HANA: OEE and shop floor execution
- Cantier MES 4.0 and SAP S/4HANA: shop floor data and digital travellers
- SAP Sapience Manufacturing Hub and S/4HANA: equipment data for electronics
- Porta-X and SAP S/4HANA: SOLIDWORKS integration, BOMs and CAD storage
- SwiftScan RF and SAP S/4HANA EWM: mobile barcode scanning for warehouse tasks
- AI Invoice Management and SAP S/4HANA Cloud: OCR capture and AP processing
- ERP Integrator and SAP S/4HANA Cloud: materials and BOMs from CAD and PLM
- 42Q Cloud MES and SAP S/4HANA Cloud Private Edition: MES for electronics and discrete
- Avalara AvaTax with SAP S/4HANA: sales tax on orders and invoices
- SAP Commerce Cloud B2B with SAP S/4HANA: webshop to ERP integration
- Esker Accounts Payable Automation with SAP S/4HANA and ECC
- BarTender label printing with SAP S/4HANA and ECC
- NeuConnectz mobile scanning with SAP S/4HANA and Business One
- OpenText Vendor Invoice Management with SAP S/4HANA and ECC
- Serrala FS2 AccountsPayable inside SAP S/4HANA and ECC
- SAP Ariba Invoicing with SAP S/4HANA and ECC
- Tacton CPQ with SAP S/4HANA: how the integration works
- SAP CPQ and S/4HANA variant configuration: LO-VC vs AVC
- SPS Commerce Fulfillment and SAP S/4HANA: EDI for retail partners
- SEEBURGER Business Integration Suite and SAP S/4HANA
- OpenText Trading Grid and SAP S/4HANA: B2B connectivity
- OneStream and SAP S/4HANA: consolidation and close
- OPAL LabelManagement Classic and SAP S/4HANA
- TEKLYNX SENTINEL and CODESOFT with SAP: automated barcode labels
- Tulip Frontline Operations Platform with SAP S/4HANA
- PROGATE 6.0 Interface with SAP ECC and S/4HANA
- Octave Reliance (ETQ Reliance) QMS with SAP S/4HANA
- Vertex O Series with Accelerator+ for SAP S/4HANA
- Sovos Indirect Tax Suite with SAP ERP and S/4HANA
- Manhattan Active Warehouse Management with SAP S/4HANA
- MPDV MES HYDRA with SAP S/4HANA: how the integration works
- Prometheus Planning & Scheduling with SAP Plant Maintenance
- RFgen Mobile Edge with SAP S/4HANA: mobile barcode integration
- BlackLine with SAP S/4HANA: reconciliations and close automation
- SOLIDWORKS PDM with SAP S/4HANA: CIDEON material and BOM integration
- Zebra RFID and barcode devices with SAP S/4HANA via Cleverence
- SAP EWM on S/4HANA: embedded vs decentralized for manufacturers
- Cleo Integration Cloud with SAP: EDI 850, 856 and 810
- SAP Joule in S/4HANA Cloud Public Edition: what it does for manufacturers
- conOperationScheduling Cloud with SAP S/4HANA Cloud Public Edition
- Avalara AvaTax with SAP S/4HANA Cloud Public Edition: US sales tax for manufacturers
- Delfoi Planner with SAP S/4HANA: finite scheduling for production orders
- Casset Tagging Inventory RFID with SAP S/4HANA: RFID tagging and cycle counts
- Loftware with SAP ECC and S/4HANA: label design and printing from SAP transactions
- SAP SuccessFactors Time Tracking with S/4HANA: labor time for payroll and costing
- UKG (Kronos) with SAP S/4HANA and SuccessFactors: syncing time and labor data
Integrations (12)
- How to add AI agents to SAP S/4HANA
- How to connect ChatGPT to SAP S/4HANA
- How to use Claude with SAP S/4HANA
- How to build an MCP server for SAP S/4HANA
- How to add an AI chatbot to SAP S/4HANA
- How to connect Power BI to SAP S/4HANA
- How to add WhatsApp to SAP S/4HANA
- How to add Microsoft Teams to SAP S/4HANA
- How to add Slack to SAP S/4HANA
- How to automate email into SAP S/4HANA
- How to add document OCR to SAP S/4HANA
- How to add a mobile app to SAP S/4HANA
AI use cases (11)
- AI for SAP S/4HANA, Running On-Prem or in Your Private Cloud
- Get AI Value From SAP ECC Now, and Use It to De-Risk the Move to S/4HANA
- AI on SAP for Aerospace and Defense Manufacturers, Without the ITAR Exposure
- AI for SAP S/4HANA in Automotive: Scheduling Agreements, Quality Notifications and Line-Side Pressure
- AI for SAP S/4HANA in Chemicals: Batch Characteristics, Process Orders and Regulated Substance Data
- AI for SAP S/4HANA in Pharmaceuticals: Read-Only, GxP-Aware Answers From Batch and Quality Data
- AI for SAP S/4HANA in Industrial Machinery: Project Structures, Variant BOMs and Aftermarket Parts
- AI for SAP S/4HANA in Food and Beverage: Batch Traceability, Shelf Life and Recall Readiness
- AI for SAP S/4HANA Procurement (MM) That Reads POs, Receipts and Invoices Together
- AI for SAP S/4HANA Finance Close (FI/CO) That Traces the Universal Journal for You
- AI for SAP S/4HANA Sales and Distribution (SD) That Explains Orders, Pricing and Blocks