How-toInfor OSExcel add-in / Office integration

Infor OS Add-In for Microsoft Excel: Install, Sign In and Use

Question
infor os add in for microsoft excel

Also searched as

  • infor excel add-in install
  • infor excel add in download
  • pull infor erp data into excel

Short answer

Infor offers Excel add-ins that connect to Infor OS and the ERP behind it so users can pull data into a worksheet and, where the product allows, send data back. The exact add-in depends on your Infor product and release, so get the installer and prerequisites from your Infor support portal, then sign in with your Infor OS identity.

Applies to: Microsoft Excel desktop (Microsoft 365 or recent perpetual versions) with Infor OS; which add-in applies depends on your Infor application, so confirm with Infor documentation

How to install and use an Infor add-in for Excel

  1. 1Identify the correct add-in for your product from Infor documentation or your account team; several Infor products ship their own Office add-in.
  2. 2Confirm prerequisites: Excel version and bitness (32 or 64 bit), .NET or VSTO runtime if required, and permission to install add-ins on the PC.
  3. 3Download the installer from the Infor support portal or the location your administrator publishes, and run it with local admin rights if required.
  4. 4Open Excel, and enable the add-in under File > Options > Add-ins if it is not already loaded. Look for the Infor tab on the ribbon.
  5. 5Sign in with the Infor OS identity or the configured single sign-on. The add-in uses your user, so you only see data your ERP roles allow.
  6. 6Choose the data source or query, set the filters and run it. Results land in the worksheet.
  7. 7Save the workbook and test a refresh as a second user to confirm security is applied per person, not baked into the file.

What the add-in is good for

An Excel add-in suits finance and planning users who already work in spreadsheets: month-end reconciliations, ad hoc extracts, and variance analysis on data they are allowed to see. It keeps the ERP as the source and lets people build their own layout.

It is a user-driven tool, not an integration platform. Anything scheduled, high volume or unattended belongs in a proper integration, an API call or a reporting database rather than in a workbook someone must open and refresh.

Alternatives when the add-in is not the right fit

If your product has no suitable add-in, there are other routes. Excel Power Query can call a REST service such as an ION API endpoint if your administrator provides the credentials and scope. A reporting database or data lake connection gives users governed access to extracts with the full power of Excel pivot tables.

Whichever you choose, avoid sharing a service account for everyone. Per-user access preserves the ERP security model and audit trail, and it prevents a workbook from becoming an uncontrolled copy of sensitive data.

Governance for spreadsheet extracts

Treat Excel extracts as data copies. Decide who may export which data, where workbooks may be stored, and how long they live. Finance workbooks containing cost or customer data should live in a controlled location, not in email.

Refresh behavior matters too. A workbook that silently shows last month's numbers because refresh failed is a risk. Show the refresh time on the sheet and make failures visible.

Try it here, free

Infor OS ION API and API Flow Payload and Timeout Calculator

Open full tool

Find a records-per-call batch size that stays inside ION API Gateway time-outs and API Flow payload limits, and estimate total run time.

Common pitfalls

  • !Installing a 32 bit add-in on 64 bit Excel, or the reverse, and getting a load failure.
  • !Using one shared login so every user sees the same data regardless of role.
  • !Building scheduled reporting on a workbook that needs a person to open it.
  • !Emailing workbooks that contain cost or customer data.
  • !Assuming a number is current without checking when it was last refreshed.

How an ERP-grounded AI assistant handles this

Many spreadsheet requests are really questions: why did freight cost rise, which items are below safety stock. A grounded assistant can answer those directly and export the result, instead of someone assembling a workbook. ERPray does this read-only against the ERP with the query shown, and can run on-prem so the data does not leave your network.

Frequently asked questions

Is there an Excel add-in for Infor OS?

Infor products offer Excel add-ins, but the exact one depends on the application and release. Check your Infor documentation or support portal for the add-in that matches your product.

Where do I download the Infor Excel add-in?

Usually from the Infor support portal or from a location your administrator publishes. Download only from those sources and match the version to your environment.

Can I write data back to the ERP from Excel?

Only where the specific add-in and ERP function support it, and with proper roles. Many users use Excel read-only. Writes need validation, approval and an audit trail.

What can I use if the add-in is not available?

Power Query against an authorised API, or a connection to a reporting database or extract. Both keep user-level security if configured carefully.

Related

Error fix

Infor OS Add-In for Excel Not Showing or Not Signing In: How to Fix It

When an Infor add-in for Excel does not appear or cannot connect, the cause is usually one of five things: a bitness or runtime mismatch, Excel having disabled the add-in, blocked trust or macro settings, a sign-in or SSO problem, or a network and proxy block to the Infor endpoint. Work through them in that order.

How-to

How to Create an .ionapi File and Service Account in Infor OS

An .ionapi file is a JSON credentials file you download from ION API after registering an Authorized App of type Backend Service and creating a service account for it. It carries the tenant, client id, client secret, the token and authorization endpoints, and the service account keys that your scripts or integrations use to request an OAuth 2.0 access token.

Advanced

How to Build SQL Views for Custom SyteLine Reporting

Reports should read from purpose-built SQL views, not directly from SyteLine's core transactional tables, so an Infor patch cannot silently break them and heavy report queries do not lock rows the ERP itself needs. Put custom views in their own schema or under a clear naming convention, build them on stable base tables, and grant reporting tools read access to the views only.

Advanced

How to Call M3 API (MI Programs) Through ION API

Calling M3 from an external system today almost always means going through ION API rather than the older direct MvxAPI SOAP endpoint: you create an ION API authorized app or service account in the ION API portal, download its .ionapi credential file, obtain an OAuth 2.0 access token, and call the M3 MI program transaction through the m3api-rest execute endpoint with that token.

Error fix

Fix a 401 Unauthorized error from Infor ION API

A 401 from ION API almost always means the credentials in the .ionapi file no longer match what ION API Gateway expects - not that the password is simply wrong. Check whether the Authorized App or service account behind the file was revoked, regenerated, expired, or issued for a different tenant, then re-test with a direct OAuth2 client_credentials call before touching any calling code.

Error fix

Diagnose and fix a failed BOD document flow in ION Desk

A Document Flow showing Failed in ION Desk means a BOD (Business Object Document) stopped either at schema validation, at the mapping step, or at the target application. Open the failed instance's detail to see the exact failing element, fix the source data or mapping, then use Resubmit rather than re-triggering the original transaction to avoid duplicates.

AI for ERP

AI Agents Over Infor ION API, BODs, and the Infor Data Lake

Build AI agents on Infor ION API Gateway, BODs, and Data Lake, alongside or instead of Infor's own GenAI features, with your choice of model and hosting.

AI for ERP

Infor M3 AI: A Practical Path from MI Programs to a Private Assistant

Infor M3 AI explained: grounded natural-language answers over MI programs and MEC, agents for distribution and manufacturing, on-prem or EU private cloud.

Stuck on Infor OS?

Talk to engineers who work inside Infor OS every week, and who build private AI that answers these questions from your own ERP data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Software