Error fixInfor SyteLine (CloudSuite Industrial)SQL Server / Database

SyteLine: Transaction Deadlocked, Chosen as the Deadlock Victim

Error
SyteLine transaction was deadlocked on lock resources chosen as the deadlock victim

Also searched as

  • SQL Server error 1205 SyteLine
  • SyteLine deadlock victim rerun the transaction
  • CloudSuite Industrial deadlock graph
  • SyteLine intermittent deadlock during posting

Short answer

SQL Server error 1205 means two sessions each held a lock the other needed, and SQL Server killed one to break the tie. In SyteLine it usually appears during concurrent posting, shipping, MRP or custom code touching the same inventory and ledger rows. Capture the deadlock graph, identify the two statements, and fix the order, the indexes or the isolation level.

Applies to: Infor SyteLine 8.x and CloudSuite Industrial on Microsoft SQL Server (2016 and later; extended events available)

How to diagnose and reduce SyteLine deadlocks

  1. 1Record the time, user, form and action when the 1205 error appeared.
  2. 2Pull the deadlock report from the system_health extended events session using the query below, matching the timestamp.
  3. 3Read the graph: identify the two victim and survivor processes, the resources (key, page, object) and the statements.
  4. 4Map the statements to SyteLine: stored procedures such as posting, ship, or inventory routines, or a custom IDO method or event.
  5. 5Check for missing or wrong indexes on the locked table; deadlocks on page locks often vanish with a better index.
  6. 6If custom code is involved, make it touch tables in the same order as standard code and keep its transactions short.
  7. 7Add a limited retry on the application or integration side for the victim transaction.
  8. 8Consider read committed snapshot isolation only after testing and a conversation with Infor support.

What actually happens

Deadlock is not slowness and not ordinary blocking. Session A holds a lock on row X and wants Y, session B holds Y and wants X. Neither can proceed, so the SQL Server lock monitor picks the cheaper transaction to roll back and returns error 1205 to that client. The other session continues, which is why the problem looks random: the user whose session was chosen sees the error, and a rerun usually works.

SyteLine makes this likely at certain hotspots because many processes update the same inventory, cost and ledger rows: job material posting, shipping, receiving and background MRP or cost jobs running while users enter transactions. The more concurrent processes, the more chances for two to touch the same rows in opposite order.

Capture the deadlock graph

SQL Server records deadlocks in the default system_health extended events session, so you can usually read a recent one after the fact. Alternatively enable trace flag 1222 to write graphs to the SQL error log. Capturing the graph is the step that turns a vague complaint into a specific pair of statements.

In the graph look at the resource list first. Key locks on an index of a specific table tell you where the collision is. The input buffer of each process shows the statement or procedure name. Note whether either side comes from a nightly job, an integration account, or a custom report, since those are the easiest to reschedule.

-- Recent deadlock graphs from system_health
SELECT CAST(xed.event_data AS xml) AS deadlock_graph,
       xed.timestamp_utc
FROM (
  SELECT CAST(target_data AS xml) AS td
  FROM sys.dm_xe_session_targets st
  JOIN sys.dm_xe_sessions s ON s.address = st.event_session_address
  WHERE s.name = 'system_health' AND st.target_name = 'ring_buffer'
) t
CROSS APPLY td.nodes('//RingBufferTarget/event[@name="xml_deadlock_report"]') AS q(n)
CROSS APPLY (SELECT q.n.query('.') AS event_data, q.n.value('(@timestamp)[1]','datetime2') AS timestamp_utc) xed
ORDER BY xed.timestamp_utc DESC;
-- Optional: write graphs to the SQL error log (turn off after capture)
DBCC TRACEON (1222, -1);

Fix options, from safe to invasive

Safest: schedule heavy background jobs away from peak entry, and make custom code short, ordered and indexed. Next, review indexes on the contended tables, but add them through a controlled change because SyteLine upgrades and Infor support may not expect unknown indexes. Document every change.

Most invasive: enabling READ_COMMITTED_SNAPSHOT changes how readers behave and affects tempdb load. It removes many reader-writer deadlocks but not writer-writer ones, and you should confirm support for your version before changing it. Do not enable it on a production database because a forum post suggested it.

Try it here, free

SQL Server Blocking and Deadlock Diagnostic Script Generator

Open full tool

Generate T-SQL to list blocked sessions, find the head blocker and its SQL text, spot idle open transactions and read recent deadlock graphs.

Common pitfalls

  • !Treating a one-off 1205 as a bug when a retry would have succeeded; look for frequency and pattern first.
  • !Leaving trace flag 1222 on permanently, which bloats the error log.
  • !Adding indexes blindly to tables you do not own; test and document them.
  • !Enabling snapshot isolation without checking tempdb sizing and vendor support.
  • !Blaming SQL Server when the conflicting statement comes from a custom event or integration that holds transactions open.

How an ERP-grounded AI assistant handles this

SyteRay can read a deadlock graph and translate it: which two statements collided, which table and index, which form or job probably issued them, and whether a custom IDO or event was involved. It can propose a sequence change or index for review. Applying anything to the database stays with your DBA and a change ticket.

Frequently asked questions

Is a SyteLine deadlock the same as blocking?

No. Blocking means one session waits for another and resolves when the first finishes. A deadlock is a cycle that can never resolve, so SQL Server cancels one transaction with error 1205. Blocking shows as slowness, deadlock shows as a sudden error and a rolled back transaction.

Is it safe to just rerun the transaction?

Generally yes, since the victim was rolled back completely. Check that the data was not partly saved by custom code that commits outside the transaction. For interfaces, build a bounded retry of two or three attempts with a short delay.

How often is too often?

A few per month on a busy system can be normal. Several per day, or the same pair of statements every time, indicates a design or scheduling problem worth fixing. Track count and the statement pair rather than relying on user complaints.

Can I find deadlocks from last week?

Only if they are still in the system_health ring buffer or file target, which rolls over. Set up a dedicated extended events session writing to files with the xml_deadlock_report event if you need history.

Related

Advanced

How to Improve SQL Server Performance for a Slow SyteLine ERP System

Most SyteLine performance complaints trace back to a handful of SQL Server issues: stale statistics, missing indexes on high-churn IDO tables, blocking caused by the default isolation level, and IDO Runtime connection pool exhaustion. Working through those systematically, with DMV evidence, resolves the majority of slow system tickets faster than guessing at application-layer causes.

How-to

SyteLine Freezing for Everyone: Find the SQL Head Blocker

When several SyteLine users freeze at once, a single session holding locks and blocking a chain of others is a common cause. Query sys.dm_exec_requests for blocking_session_id, walk the chain to the head blocker, read its statement and open transaction, and decide whether to wait, fix the caller, or end the session.

Error fix

SyteLine error: this row has been modified by another user since you began editing it

This is SyteLine's IDO optimistic concurrency check. It fires when the row's timestamp column (usually ts_prefix or a similar rowversion field) on the database no longer matches the value the client loaded, meaning another session, a background job, or an integration already saved a change. Refresh the record and reapply your edit; if it recurs constantly on one record, look for a duplicate integration process or a stuck lock rather than user contention.

Error fix

Troubleshooting SyteLine MRP and APS regeneration that fails or hangs

A SyteLine MRP or APS run that fails to complete, hangs indefinitely, or errors partway through is most often caused by data integrity problems (a BOM loop, an item with an invalid lead time or missing routing), a scheduling engine (APS) process that is stuck or resource-starved, or a concurrent MRP run conflict. Check the MRP/APS log first for the specific item or job it stopped on before assuming it is a system capacity issue.

Error fix

Fixing SyteLine's 'Object reference not set to an instance of an object' error

This is a generic .NET NullReferenceException surfacing through the SyteLine IDO Runtime, not a SyteLine-specific error code. It almost always means a form, script or IDO method referenced a field, row or object that came back null, usually after a customization, a missing related record, or a view/IDO method call before the form finished loading. Turn on detailed client logging and check the most recent customization or form event first.

Error fix

Diagnosing and fixing SyteLine session timeout errors

SyteLine session timeouts come from one of three independent layers: the IDO Data Service session timeout on the app server, the IIS/application pool idle timeout for the web (Mongoose Web) client, or a load balancer/proxy idle timeout in front of a CloudSuite hosted environment. Fixing the wrong layer is the most common mistake - you need to identify which layer is actually expiring the session before changing anything.

AI for ERP

AI for Infor SyteLine and CloudSuite Industrial

Add grounded AI to Infor SyteLine or CloudSuite Industrial: natural-language answers, agents over IDOs and ION, on-prem or CloudSuite deployment.

AI for ERP

An Air-Gapped Private LLM for SyteLine, Built for Defense Suppliers

Deploy a private LLM on an air-gapped network alongside Infor SyteLine for defense suppliers: no internet egress, ITAR and CMMC-aware architecture.

Stuck on Infor SyteLine (CloudSuite Industrial)?

Talk to engineers who work inside Infor SyteLine (CloudSuite Industrial) every week, and who build private AI that answers these questions from your own ERP data.

Get Infor SyteLine alerts

Support and maintenance deadlines, release changes that affect Infor SyteLine sites, and new free Infor SyteLine tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor SyteLine: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring