ERP Core ConceptsGlossary

What Is FIFO Costing (First-In, First-Out)?

Also known as: FIFO, First In First Out, FIFO inventory valuation

Definition

FIFO costing is an inventory valuation method that assigns the cost of the oldest receipts to units issued or sold first, leaving the most recent purchase costs in ending inventory. It tracks cost in layers by receipt.

FIFO Costing (First-In, First-Out) Explained

Under FIFO each receipt creates a cost layer with its own quantity and unit cost. When stock is issued to a job or shipped to a customer, the system consumes the oldest layer first and moves to the next layer when it is exhausted. Cost of goods sold therefore reflects older prices and ending inventory reflects the newest prices.

In a period of rising prices FIFO produces lower cost of goods sold and higher reported profit than average or LIFO methods. When prices fall the effect reverses. Inventory on the balance sheet under FIFO is closer to current replacement cost, which many auditors and lenders prefer. Both US GAAP and IFRS permit FIFO, and unlike LIFO it is accepted under IAS 2.

ERPs implement FIFO as a per-item cost method, not a global setting. SyteLine and Infor LN let you assign a costing method per item, and NetSuite offers FIFO as an item costing method alongside average, LIFO and standard. Mixing methods across items is allowed but complicates reporting, so most manufacturers pick one method per item class and document it. Changing an item's cost method mid-year usually needs a revaluation and a clear audit trail.

The practical weak point is physical flow. If a warehouse picks newest stock first (common with bins and mixed lots), FIFO cost layers drift away from what actually left the shelf. That does not break the books, since FIFO is a cost flow assumption, but it can matter for lot-controlled or expiring items where you also need true first-expired-first-out picking.

Why It Matters

  • The costing method changes reported gross margin and inventory value, so it affects tax, covenants and valuations.
  • Receipt-level cost layers give traceable margins on individual sales orders, useful when material prices swing.
  • FIFO is accepted under IFRS, so international groups can use one policy across entities.
  • Method choice drives how landed cost, price variances and revaluations are handled in the ERP.

In Practice

Example: you buy 100 units at 10, then 100 at 12, and ship 120. FIFO cost of goods sold is 100 x 10 + 20 x 12 = 1,240, and ending inventory is 80 x 12 = 960. An average cost method would put cost of goods sold near 1,320 and ending inventory near 880.

Frequently Asked Questions

What is FIFO in inventory costing?

FIFO assigns the cost of the oldest inventory receipts to goods issued or sold first. Ending inventory is valued at the most recent purchase costs.

Is FIFO the same as physical first in, first out picking?

No. FIFO costing is a cost flow assumption and does not require the oldest physical unit to be picked. Expiring or lot-controlled goods still need real first-expired-first-out picking rules.

Does FIFO give higher profit than LIFO?

When prices are rising, yes: FIFO reports lower cost of goods sold and higher profit than LIFO. When prices fall, the opposite is true.

Can I change an item from FIFO to another costing method?

Usually yes, but it needs a revaluation, finance approval and documentation. Do it at a period boundary and confirm tax and auditor requirements first.

Working with FIFO Costing (First-In, First-Out) in a live environment? Our engineers do this every day - and our AI agents automate most of it.

Try it here, free

Inventory Valuation Comparison Worksheet (FIFO, Average, Standard)

Open full tool

Compare ending inventory value under FIFO, weighted average and standard cost for each item, and see the total gap between methods.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides