Integration & DataGlossary

What Is IDoc (Intermediate Document)?

Also known as: SAP IDoc, intermediate document, IDoc message type, ALE IDoc

Definition

An IDoc (Intermediate Document) is SAP's standard data container for exchanging business documents such as orders, deliveries and invoices with other systems. Each IDoc has a control record, data segments and status records, and is sent through ALE or EDI.

IDoc (Intermediate Document) Explained

An IDoc has three parts. The control record names the message type (for example ORDERS, DESADV, INVOIC), the IDoc basic type, the sender, the receiver and the direction. The data records hold the content as a hierarchy of segments such as E1EDK01 for header data and E1EDP01 for items. The status records track processing, from created to passed to port, to posted or failed.

IDocs are the usual way SAP exchanges data without a custom API. Outbound, the application creates the IDoc through output determination or a function module, the ALE layer assigns a partner profile (WE20) and a port (WE21), and it is sent as a file, RFC, HTTP or to an EDI subsystem. Inbound, a process code decides which function module posts the document into SAP.

Monitoring is done in a small set of transactions. WE02 and WE05 list IDocs and their status, WE19 is the test tool for editing and reprocessing, BD87 lets users reprocess failed IDocs in bulk, and WE60 documents a basic type. A status 51 means an inbound IDoc failed in the application, typically on missing master data or a locked record.

Non-SAP ERPs have equivalents, such as Infor Business Object Documents (BODs) in ION for SyteLine and LN, and Oracle's OAGIS-based messages. For manufacturers integrating a plant ERP with SAP at headquarters, the IDoc is often the format the other system has to produce or consume, which makes mapping the key work item.

Why It Matters

  • Large manufacturers on SAP receive supplier and subsidiary data as IDocs, so integrations to them must produce or consume them.
  • Failed IDocs are a common source of silent order, delivery and invoice gaps, and need active monitoring.
  • Understanding message types and segments avoids guessing when mapping from or to a plant ERP.
  • IDocs are asynchronous, so integration design must handle delay, retries and reprocessing.

In Practice

A subsidiary on SyteLine sends production confirmations to a parent on SAP. The integration layer converts a SyteLine job completion into an IDoc of message type WORKORDER_CONFIRM, filled with plant, order and quantity. One IDoc arrives with status 51 because the material master for a new part is missing at the parent. An analyst fixes the master, then reprocesses the IDoc in BD87 rather than resending it.

Frequently Asked Questions

What is the difference between an IDoc and a BAPI?

An IDoc is an asynchronous document sent between systems. A BAPI is a callable function that runs synchronously. IDocs suit batch and messaging, BAPIs suit direct calls.

What does IDoc status 51 mean?

An inbound IDoc reached SAP but the application could not post it, usually because of missing master data, authorization or validation errors.

Which transaction shows IDocs?

WE02 and WE05 list IDocs by status. WE19 tests them and BD87 reprocesses failed ones.

Do non-SAP systems use IDocs?

Not natively. They exchange them through middleware that converts IDocs to XML, JSON or their own formats.

Working with IDoc (Intermediate Document) in a live environment? Our engineers do this every day - and our AI agents automate most of it.

Try it here, free

SAP IDoc and ALE Transactions, Tables and Programs Reference

Open full tool

One searchable list of the transactions, tables and standard programs an SAP integration developer uses to build, monitor and repair IDoc and ALE interfaces.