SAPFree referencePDF, Excel, Word exportSAP ECC / S/4HANAAll SAP ECC 6.0 tools

SAP IDoc Status Codes Reference

Every IDoc carries a status that tells you where it is in its life: created, dispatched, posted or stuck. This reference lists the status codes you will see in WE02, WE05 and BD87, with the direction and the first thing to check.

Download:
StatusDirectionKindMeaningTypical next step
01
Outbound
Info
IDoc created
Wait for the dispatch job or run RSEOUT00 / WE14
02
Outbound
Error
Error passing data to port
Check port in WE21 and the target path or RFC destination
03
Outbound
Success
Data passed to port OK
No action, IDoc has left SAP
04
Outbound
Error
Error within control information of EDI subsystem
Check the EDI subsystem log and the control record
05
Outbound
Error
Error during translation
Check the translation or mapping in the EDI subsystem
06
Outbound
Info
Translation OK
No action
07
Outbound
Error
Error during syntax check
Check the EDI syntax result from the subsystem
08
Outbound
Info
Syntax check OK
No action
11
Outbound
Error
Error during dispatch
Check the partner connection in the EDI subsystem
12
Outbound
Success
Dispatch OK
Wait for acknowledgement if the partner sends one
29
Outbound
Error
Error in ALE service
Read the status log; check filters, conversion rules in BD64 and SALE
30
Outbound
Waiting
IDoc ready for dispatch (ALE service)
Run RSEOUT00 or WE14, or check the partner profile collect setting
31
Both
Error
Error, no further processing
Create a corrected copy or discard; nothing will reprocess it
32
Both
Info
IDoc was edited
Check the original in status 33
33
Both
Info
Original of an IDoc which was edited
No action, kept for audit
34
Outbound
Error
Error in control record of IDoc
Check sender, receiver and partner profile in WE20
37
Outbound
Error
IDoc added incorrectly
Review the control record and segment data for the incorrect entry
38
Both
Info
IDoc archived
No action
40
Outbound
Error
Application document not created in receiving system
Check the application error returned by the receiving system
41
Outbound
Success
Application document created in receiving system
No action
50
Inbound
Info
IDoc added
Wait for the processing job or run BD87
51
Inbound
Error
Application document not posted
Read the message in BD87 or WE05, fix master data or customizing, reprocess
52
Inbound
Error
Application document not fully posted
Review which items failed, correct and reprocess
53
Inbound
Success
Application document posted
No action
56
Inbound
Error
IDoc with errors added
Fix the control record or partner profile in WE20, then edit and reprocess
60
Inbound
Error
Error during syntax check of IDoc (inbound)
Correct the segment structure or mandatory fields in WE19
62
Inbound
Info
IDoc passed to application
No action
63
Inbound
Error
Error passing IDoc to application
Check that the inbound function module and process code exist in WE42
64
Inbound
Waiting
IDoc ready to be transferred to application
Run RBDAPP01 or BD87, or check why background processing is not scheduled
65
Inbound
Error
Error in ALE service
Check inbound ALE settings, filters and conversion rules
66
Inbound
Waiting
IDoc is waiting for predecessor IDoc (serialization)
Process the predecessor first or run RBDAPP01 with serialization in mind
68
Inbound
Error
Error, no further processing
Edit and reprocess or discard
69
Inbound
Info
IDoc was edited
Check the original in status 70
70
Inbound
Info
Original of an IDoc which was edited
No action
73
Inbound
Info
IDoc archived
No action

Outbound statuses run 01 to 42 and inbound statuses run 50 to 74. Status text can differ slightly by release, so confirm in WE47 (IDoc status maintenance). Always read the status record message in WE02 or WE05 before reprocessing.

Cut the IDoc error backlog

Ask for a review of your recurring 51 and 56 errors and whether a private AI triage assistant would help.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the reference

Filter by the number you see in WE05 or by a word such as posted or waiting. Use the Direction and Kind columns to narrow the list, then read the next step column for the transaction to open. Export the table to Excel to give your support team a one page cheat sheet for the interface runbook.

Reading outbound versus inbound statuses

Outbound IDocs start at 01 and a healthy one normally ends at 03 when it leaves SAP, or at 12 if an EDI subsystem confirms dispatch. Inbound IDocs start at 50 and a healthy one ends at 53 when the application document is posted. Anything between those and the error codes means the process is waiting or failed.

  • 03 or 12 is the normal outbound end state
  • 53 is the normal inbound end state
  • 51 means the business posting failed, usually data or customizing
  • 64 and 30 mean ready but not yet processed or sent

Typical reprocessing path

For a 51, open BD87, double click the error to see the application message, fix the cause such as a missing material, plant or posting period, and reprocess. For a 56 or 60, fix the control record or segment data through WE19 or the IDoc edit function, then reprocess. For a 64, schedule RBDAPP01 so it stops piling up.

Common mistakes

Reprocessing a 51 repeatedly without fixing the cause floods the log. Deleting IDocs in status 51 hides a real business gap. Leaving statuses 30 and 64 untouched for days usually signals a missing background job, not an application problem.

Frequently Asked Questions

What does IDoc status 51 mean?

Status 51 means the IDoc reached the application but the business document could not be posted. The status record holds the real error message, for example a missing material or a closed posting period. Fix the cause and reprocess in BD87.

What is the difference between IDoc status 53 and 03?

Status 03 is an outbound success: the IDoc was passed to the port. Status 53 is an inbound success: the application document was posted. They never appear on the same IDoc because the direction differs.

Why is my IDoc stuck in status 64?

Status 64 means it is ready for the application but no process has picked it up. Usually the background job for RBDAPP01 is missing, or the partner profile is set to trigger by background program. Run BD87 manually to confirm.

How do I reprocess an IDoc in error?

Use BD87 for inbound IDocs or WE14 and BD75 for outbound. Fix the root cause first, then select the IDoc and process in foreground to see the message. For control record problems, edit the IDoc through WE02 or WE19 first.

Netray can build an assistant that reads your IDoc status logs and groups failures by root cause, running privately next to your SAP landscape.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Integrations