SAPFree referencePDF, Excel, Word exportSAP ECC / S/4HANAAll SAP ECC 6.0 tools

SAP IDoc and ALE Transaction Codes, Tables and Programs

IDoc and ALE work spreads across a few dozen transactions, three core tables and a handful of batch programs. This list puts them in one searchable table so you do not have to remember which transaction does what.

Download:
ItemTypePurposeTypical use
WE02
Transaction
Display IDoc, read control record, data records and status history
Monitoring
WE05
Transaction
IDoc lists with selection by date, status, message type and partner
Monitoring
WE09
Transaction
Search for IDocs by content of a segment field
Monitoring
WE19
Transaction
Test tool: create or copy an IDoc and process it inbound or outbound
Testing
WE20
Transaction
Partner profiles with inbound and outbound parameters
Configuration
WE21
Transaction
Port definition for tRFC, file, XML HTTP and other transports
Configuration
WE30
Transaction
IDoc type development: create and change basic types and extensions
Development
WE31
Transaction
Segment editor: create and change IDoc segments
Development
WE41
Transaction
Process codes for outbound processing
Configuration
WE42
Transaction
Process codes for inbound processing
Configuration
WE46
Transaction
IDoc administration: general settings, status and process codes
Configuration
WE47
Transaction
Maintain IDoc status values and their texts
Configuration
WE57
Transaction
Assign function module to logical message and IDoc type
Configuration
WE60
Transaction
IDoc type documentation: structure and field descriptions
Development
WE81
Transaction
Display and maintain logical message types
Configuration
WE82
Transaction
Assign message type to IDoc type and release
Configuration
BD54
Transaction
Maintain logical systems
Configuration
BD64
Transaction
Maintain the ALE distribution model
Configuration
BD82
Transaction
Generate partner profiles from the distribution model
Configuration
BD87
Transaction
Status monitor for ALE messages: select, process and delete IDocs
Monitoring
BD10
Transaction
Send material master data via ALE
Master data
BD11
Transaction
Request material master data from another system
Master data
BD12
Transaction
Send customer master data via ALE
Master data
BD14
Transaction
Send vendor master data via ALE
Master data
BD21
Transaction
Select change pointers and create IDocs from them
Change pointers
BD50
Transaction
Activate change pointers per message type
Change pointers
BD52
Transaction
Activate change pointers per changed field
Change pointers
BD61
Transaction
Activate change pointers generally
Change pointers
SALE
Transaction
ALE IMG: central entry for ALE and IDoc configuration
Configuration
WEDI
Transaction
Area menu for IDoc and EDI basis
Navigation
SM59
Transaction
RFC destinations, connection tests and logon settings
Configuration
SM58
Transaction
Transactional RFC: list and resend failed tRFC calls
Monitoring
SMQ1
Transaction
qRFC monitor for the outbound queue
Monitoring
SMQ2
Transaction
qRFC monitor for the inbound queue
Monitoring
SE37
Transaction
Function Builder: inspect and test IDoc function modules
Development
SE38
Transaction
ABAP editor: run IDoc reports directly
Development
RSEOUT00
Program
Process outbound IDocs that are waiting in status 30
Batch job
RBDAPP01
Program
Process inbound IDocs that are waiting in status 64
Batch job
RBDMANI2
Program
Manually process IDocs that ended with an application error
Repair
RBDMIDOC
Program
Create IDocs from change pointers for a message type
Change pointers
RSEIDOCR
Program
Process IDocs from external files placed in a directory
File interface
EDIDC
Table
IDoc control records (header) with current status
Analysis
EDID4
Table
IDoc data records (segments) from release 4.0 onward
Analysis
EDIDS
Table
IDoc status records, one row per status change
Analysis
EDP13
Table
Partner profile: outbound parameters
Analysis
EDP21
Table
Partner profile: inbound parameters
Analysis
EDPP1
Table
Partner profile: general data
Analysis
BDCP2
Table
Change pointers for ALE master data distribution
Change pointers
BDCPS
Table
Change pointer status
Change pointers

Transaction codes are as found in standard SAP ECC and S/4HANA. Availability depends on release and authorization, and some functions are also available in Fiori or in SAP Integration Suite monitoring.

Need an IDoc monitoring view without custom reports?

Optional: talk through how a read-only assistant could answer IDoc status questions from your SAP data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use this list

Search by transaction code, by keyword such as port or status, or by phase such as Monitoring. The Typical use column groups items into configuration, development, testing and monitoring so you can walk through a build in order. Export to Excel to hand a new team member a ready cheat sheet.

A normal outbound to inbound flow

An application creates an IDoc through output control or a function module. It lands in EDIDC with status 01, moves to 30 when ready for dispatch, and RSEOUT00 or immediate processing sends it through the port from WE21 to the receiver. On the receiving system the IDoc arrives at status 50, goes to 64 when waiting to be processed, and RBDAPP01 posts it to the application, ending at status 53 on success.

  • Check partner profile first when nothing is created (WE20)
  • Check port and RFC destination when status 02 appears (WE21, SM59)
  • Check process code and function module when inbound fails (WE42, WE57)

Where to look when something breaks

Start in WE05 with the status filter. A stuck outbound IDoc at 30 usually means the dispatch job is missing. An IDoc at 02 means the transfer failed, so look in SM58 for the tRFC call and SM59 for the destination. For inbound at 51, open the status record in WE02 to read the application message and use BD87 or WE19 to reprocess after the master data or configuration is fixed.

Common mistakes

Teams often schedule RBDAPP01 but not the program that picks up status 51 errors, so failures sit unnoticed. Others reprocess in production without checking whether the cause was data or configuration, which just recreates the error.

Frequently Asked Questions

Which transaction shows all IDocs for a message type?

Use WE05 and enter the message type and a date range, or WE02 for the same selection. Both read table EDIDC. Add a status filter to find only errors, and use direction to separate inbound from outbound. BD87 gives the same data grouped for processing.

What is the difference between WE02 and WE05?

They use the same selection and show the same IDocs. WE02 opens with an overview tree, while WE05 opens with a list view. Both let you drill into the control record, data records and status history, so the choice is mostly habit.

How do I send a test IDoc without the application?

Use WE19. You can copy an existing IDoc, edit its segment values, then choose inbound processing or outbound processing. It is the fastest way to reproduce an inbound posting error, but treat it with care in production because it really posts data.

Do these transactions work in S/4HANA?

Yes, the core IDoc and ALE transactions remain available in S/4HANA. Some master data distribution scenarios are replaced by newer mechanisms, so check SAP notes for your release before relying on a specific message type.

Netray builds private assistants and dashboards on top of SAP data. If monitoring IDocs across several systems takes up your team, ask for a review of what could be automated.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

AI on your ERP

Integrations