What shops here make and for whom
Most small manufacturers in the region are second and third tier suppliers. They machine components, weld and fabricate foundations and structures, assemble cable and electronic assemblies, or provide fast-turn repair parts during ship availabilities. Their customers are shipyards, prime contractors and the Navy's own repair organizations.
Demand is lumpy. A repair availability or a submarine production milestone can send a surge of urgent requests, while gaps between awards leave capacity idle.
Quoting and estimating realities
Quotes against Navy-related work carry more than machining time. Estimators need to price first article inspection, material certifications, source inspection by a government or prime representative, special packaging and documentation packages that must travel with the part. Underestimating the paperwork is a common way to lose margin on a job that looks simple on the drawing.
Rework on specification changes is another risk. Keeping revision history tied to each quote and job in the ERP is worth the setup effort.
- Price documentation and inspection hours as separate lines
- Link each quote to the drawing revision it was based on
- Track which customers pay on milestone versus delivery
Try it here, free
CMMC Level 2 Checklist Worksheet
An editable CMMC Level 2 tracking sheet with real NIST SP 800-171 practice IDs, status, evidence, owner and due date, exportable to Excel.
ERP and systems seen in these shops
Small defense suppliers frequently run JobBOSS, E2, ProShop ERP or Global Shop Solutions, with some on Epicor Kinetic, Infor SyteLine or NetSuite. Larger suppliers lean on enterprise ERP with separate quality and document systems.
The practical gap is traceability: tying a lot of material, a certification, a routing step and an inspection record to a shipped part. Where that data sits in different tools, searching it for an audit or a corrective action request takes hours that a retrieval layer over those records can shorten.
Compliance, data handling and where private AI fits
Suppliers holding controlled unclassified information must protect it under NIST SP 800-171, and CMMC 2.0 adds assessment against those controls. That makes public AI chat tools a poor place for drawings, technical data packages or ERP exports. Running open-weight models on the supplier's own hardware, or in an environment the supplier controls and documents, keeps the data inside the boundary being assessed.
Netray does not hold a CMMC certification or confer one. The architecture lets the customer keep data in their own enclave and show where it goes. AI helps with document search and ERP questions, but it should not make inspection or release decisions.
Frequently asked questions
Where can a small Virginia manufacturer get help with cybersecurity compliance?
GENEDGE Alliance, Virginia's NIST MEP affiliated center, supports small and mid-sized manufacturers, including work on NIST SP 800-171 readiness. Suppliers can also work with a registered practitioner or assessor for CMMC preparation. Check current Department of Defense guidance for the rollout timeline.
What do Navy shipyard suppliers in Hampton Roads need to prove?
Requirements vary by contract, but commonly include a quality system such as ISO 9001 or AS9100, material traceability, first article inspection and flow-down clauses from the shipyard. Many contracts also require DFARS 252.204-7012 and NIST SP 800-171 for controlled unclassified information.
Can we use AI on technical data packages safely?
Only if the deployment meets your contract's data handling rules. Running a model on your own servers keeps data inside your boundary, but you still need access controls, logging and a documented system security plan. Confirm with your contracting officer or compliance lead before you load controlled data.
Does Netray work with shipyards in Hampton Roads?
Netray builds private AI on top of ERP and manufacturing systems and works remotely or on site at the customer's location. This page is a regional guide and does not imply any existing relationship with a particular shipyard or supplier.