EpicorIndustryUnited States

Kinetic AI for A&D

Epicor Kinetic AI for Aerospace and Defense Suppliers: Traceability, Quality and CUI, On-Prem

Short answer

Aerospace and defense suppliers on Epicor Kinetic can use AI for traceability questions, AS9100 quality and NCR analysis, first article preparation and job cost explanation, but controlled data usually rules out cloud AI. A private model on site, reading Kinetic through BAQs and REST v2 inside your CMMC boundary, keeps ITAR and CUI data under your control.

ERP
Epicor Kinetic, Epicor ERP 10
Industries
Aerospace, Defense
Written for
VP Operations

Many aerospace and defense suppliers, machine shops, sheet metal fabricators, electronics and composite builders, run Epicor Kinetic or Epicor 10 because it fits job-shop and make-to-order work. Their AI questions are similar to other manufacturers, but their constraints are not: ITAR and EAR, DFARS 252.204-7012, CMMC Level 2, AS9100 and customer flow-downs.

Those constraints make cloud AI features difficult. Part numbers, drawings, specifications and program details in Kinetic records can be technical data or CUI. Sending them to a vendor's cloud AI may be outside your assessed boundary or export authorisations. That does not mean no AI; it means AI that runs where your data already lives.

The use cases are concrete. Quality managers want to find patterns across NCRs and corrective actions. Program managers want to explain job cost overruns. Inspectors want quick access to customer quality clauses and first article history. Buyers want supplier performance for approved vendor lists. All of this lives in Kinetic and adjacent documents.

A private model on site, inside the same enclave as your Kinetic servers, can do this with read-only access, showing its queries, respecting security groups and logging everything. This page outlines that approach and the honest limits.

What usually gets in the way

The problems we hear most from vp operations teams running Epicor Kinetic.

Cloud AI conflicts with controlled data

Technical data and CUI in Kinetic records make vendor cloud AI features risky for ITAR, EAR and CMMC obligations.

Traceability questions take hours

Answering which serials or lots went into a shipment, or where a suspect material was used, requires several BAQs and manual joins.

NCR patterns hidden

Recurring defects across parts, work centres and suppliers are hard to see in individual NCR records.

Customer quality clauses scattered

Flow-down requirements live in PO text, quality clauses and documents, and inspectors struggle to find them.

Job cost overruns explained late

Program managers learn about overruns at job close, too late for corrective action.

Where AI earns its place in Epicor Kinetic

Each use case names the ERP objects it reads or writes, so your ERP team can judge the integration effort before anyone commits budget.

Lot and serial trace questions

Ask which lots or serials went into a shipment or job, and where a suspect material lot was consumed.

Touches: Erp.PartLot, Erp.SerialNo, Erp.PartTran, Erp.JobMtl, Erp.ShipDtl

Outcome: Trace answers in minutes with the query shown.

NCR and corrective action patterns

Summarise recurring defects by part, work centre and supplier across NCRs and DMRs.

Touches: Erp.NonConf, Erp.DMRHead, Erp.DMRActn, Erp.Vendor

Outcome: Earlier identification of systemic issues.

Customer quality clause lookup

Retrieve flow-down clauses from PO text and quality documents for a given order.

Touches: Erp.OrderHed comments, quality clause documents

Outcome: Inspectors see requirements before inspection.

First article preparation support

Gather part revision, routing and prior inspection history for AS9102 first article packages.

Touches: Erp.PartRev, Erp.JobOper, inspection records

Outcome: Less time assembling FAI inputs; quality still signs.

Job cost overrun explanation

Explain variances by operation, labor and material for program managers.

Touches: Erp.JobHead, Erp.JobOper, Erp.LaborDtl, Erp.JobMtl

Outcome: Earlier corrective action on overruns.

Supplier performance for AVL

Summarise supplier quality and delivery history for approved vendor list reviews.

Touches: Erp.Vendor, Erp.RcvDtl, Erp.DMRHead, Erp.PORel

Outcome: Evidence-based AVL decisions.

Counterfeit parts risk check

Flag purchases of electronic parts from non-authorised sources for review.

Touches: Erp.PODetail, Erp.Vendor, approved source lists

Outcome: Supports DFARS counterfeit parts controls.

Reference architecture

Everything runs inside your controlled enclave: Kinetic, the model server and the retrieval index, with access through your existing identity and audit tooling.

  1. 1

    Kinetic in enclave

    Kinetic or Epicor 10 servers inside your CMMC boundary.

  2. 2

    Read-only connector

    REST v2 and BAQs with scoped identities mirroring security groups.

  3. 3

    Model server

    Open-weight model on vLLM on a GPU server inside the same enclave, no outbound calls.

  4. 4

    Retrieval

    Index of quality documents, clauses and procedures, access-controlled.

  5. 5

    Audit

    Full logging integrated with your SIEM; US-person access controls where required.

Integration notes for your ERP team

  • Keep the model server in the same network segment as Kinetic with no internet egress.
  • Use scoped service identities per role, never a shared admin account.
  • Exclude controlled drawings from retrieval unless access controls match their markings.
  • Log prompts and responses to your SIEM with retention matching your policy.
  • Coordinate with your Epicor partner before adding UD tables for predictions or flags.
  • If Kinetic is Epicor-hosted, confirm hosting terms for controlled data before any AI work.

Deployment options

On-prem enclave

Suppliers with ITAR or CUI in Kinetic.

Model server alongside Kinetic in the enclave.

Air-gapped

Classified-adjacent or highly restricted programs.

No network egress; model updates via controlled media.

Private government cloud

Suppliers already hosting Kinetic in an authorised government cloud.

Model in the same authorised environment.

Compliance and data control

How the architecture supports your obligations. Certification and accountability stay with your organisation; the design keeps the evidence straightforward.

ITAR and EAR

Inference on site with access limited to authorised persons; the customer remains responsible for registration and licensing.

CMMC Level 2 and DFARS 252.204-7012

AI components inside the assessed boundary and documented in the SSP.

AS9100

AI supports quality records but does not replace sign-off; records remain in Kinetic or QMS.

DFARS counterfeit parts

Risk flags support but do not replace your counterfeit avoidance procedures.

NIST SP 800-171

Access control, audit and configuration management controls applied to AI components.

How an engagement runs

Phase 1 . 2 weeks

Boundary review

  • -Data classification
  • -Enclave architecture
  • -SSP impact notes

Phase 2 . 4-6 weeks

Pilot

  • -Trace and NCR questions
  • -Audit integration
  • -Accuracy tests

Phase 3 . 4 weeks

Expand

  • -Quality clause retrieval
  • -Job cost explanation
  • -Role-based access

Phase 4 . Ongoing

Operate

  • -Model update process via controlled media
  • -Quarterly access reviews
  • -Usage reporting

Questions to ask any vendor, including us

A short list that separates real Epicor Kinetic AI work from a chatbot demo.

  1. Does any part of the AI system send data outside our enclave?
  2. How is access restricted to authorised persons?
  3. How will the AI components be documented in our SSP?
  4. How are model updates delivered and verified?
  5. Can every answer show its source query?
  6. How are controlled drawings handled in retrieval?

Frequently asked questions

Can aerospace suppliers use Epicor Prism?

Prism runs in Epicor's cloud. For non-controlled data and use cases, it may be fine. For technical data or CUI, confirm hosting and personnel access with Epicor and your compliance team; many suppliers keep those use cases on a private on-prem layer.

Does Epicor Kinetic support AS9100 traceability?

Kinetic has lot and serial tracking, job traceability and quality objects that many AS9100 suppliers use. AI makes those records easier to query, but the quality system remains your responsibility.

Can AI help with AS9102 first articles?

Yes, by gathering part revision, routing and inspection history into a draft package. Quality staff still verify and sign. AI should not create inspection results.

Is a private model enough for CMMC?

A private model inside your assessed boundary can be documented in your SSP like other components. CMMC compliance depends on your full set of controls; AI is one component within them.

Does Netray hold ITAR registration or CMMC certification?

No. Netray does not claim ITAR registration or CMMC certification. The architecture lets you keep AI inside your own boundary so you meet your obligations.

What hardware is needed?

Typically one GPU server for a mid-sized supplier, sized to user count and model choice. Air-gapped sites need a controlled update process.

How long does a pilot take?

Around six to eight weeks including boundary review, trace and NCR use cases, audit integration and accuracy testing.

Talk it through with an engineer who knows Epicor Kinetic

Bring one real question your team cannot answer from the ERP today. We will map the data path, the model, and where it runs, and tell you honestly if AI is the wrong tool for it.

Try it here, free

Epicor Kinetic Upgrade Checklist

Open full tool

A phase-by-phase upgrade checklist covering inventory, testing, integrations, cutover and rollback for Epicor Kinetic.

Get Epicor ERP alerts

Support and maintenance deadlines, release changes that affect Epicor ERP sites, and new free Epicor ERP tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Epicor ERP: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Epicor ERP? Start with the Epicor ERP guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Manufacturing hubs

Integrations

Comparisons

Software