Compliance & StandardsGlossary

What Is AS9100?

Also known as: AS9100D, EN 9100, aerospace quality management system

Definition

AS9100 is the quality management system standard for the aviation, space, and defense industry, published by SAE and the International Aerospace Quality Group, which incorporates all of ISO 9001 and adds sector-specific requirements for safety, configuration, and risk.

AS9100 Explained

AS9100 is the aerospace industry's answer to a supply chain problem: ISO 9001 is generic by design, and aerospace primes needed a common, auditable baseline that addressed the specific failure modes of flight hardware. The standard is maintained by the International Aerospace Quality Group and published regionally as AS9100 in the Americas, EN 9100 in Europe, and JISQ 9100 in Japan, with the technical content harmonized so a single certification is recognized globally.

The current revision, AS9100D, was published in 2016 and aligns with ISO 9001:2015, adopting the Annex SL high-level structure and the clause numbering from 4 through 10. Every ISO 9001 requirement is present verbatim, with aerospace additions inserted in place. The additions cover configuration management, product safety, prevention of counterfeit parts, awareness of individual contribution to product safety and ethical behavior, risk management applied to operational processes, special requirements and critical items, first article inspection, product realization planning, and control of work transfer.

Two additions cause the most audit friction. Configuration management requires an organization to know, at any point, exactly which drawing revision, specification, and process a given serialized unit was built to - and to demonstrate control over changes to that configuration. Special requirements and critical items require the organization to identify characteristics whose variation significantly affects safety, fit, form, function, or producibility, and to apply specific controls to them. Both requirements push directly into ERP: item revision control, effectivity dating, routing revision, and inspection plan linkage.

Certification is performed by a certification body accredited under the IAQG scheme, and the resulting certificate is registered in the OASIS database, the industry-wide registry primes use to verify supplier status. Auditors are trained and approved specifically for the aerospace scheme, and audits are scored using a defined methodology with mandatory audit days based on organization size and complexity. A finding cannot simply be closed with a promise; the scheme requires root cause analysis and evidence of effective corrective action within defined timeframes.

Related standards cover adjacent scopes: AS9110 for maintenance, repair, and overhaul organizations, and AS9120 for distributors of aerospace parts. A common misconception is that AS9100 certification proves product quality. It does not - it certifies that a management system meeting the standard is in place and operating. Primes therefore layer their own supplier quality requirements, source inspection, and flowdown clauses on top of the certificate rather than treating it as sufficient by itself.

Why It Matters

  • Most aerospace primes require AS9100 certification as a condition of being an approved supplier, making it a market-access requirement rather than a quality option.
  • Configuration management and critical item controls force traceability discipline into ERP item revisions, routings, and inspection plans.
  • Certificates are visible to customers in the OASIS registry, so a lapsed or suspended certificate is immediately known across the supply chain.
  • The counterfeit parts and product safety clauses connect quality management directly to AS5553 and defense contracting obligations.

In Practice

A recurring nonconformance: the ERP item master carries a revision field, but purchase orders and travelers print only the part number. When engineering releases Rev G, receiving accepts Rev F stock against an open order and the shop builds mixed-configuration units. AS9100D configuration management findings almost always trace to this pattern. The fix is enforcing revision on the purchase order line, on the inspection record, and on the work order traveler, so that a mismatch is visible before parts move rather than during a customer audit.

Frequently Asked Questions

What is the difference between AS9100 and ISO 9001?

AS9100 contains the complete text of ISO 9001 and adds roughly one hundred aerospace-specific requirements. The additions cover configuration management, product safety, counterfeit part prevention, risk management in operational processes, special requirements and critical items, first article inspection, and control of work transferred to other sites or suppliers. An AS9100 certificate therefore satisfies ISO 9001 as well.

How long does AS9100 certification take to obtain?

For an organization starting without a formal quality management system, twelve to eighteen months is typical: several months to document processes, at least three months of operating records to demonstrate the system works, then a two-stage certification audit. Companies already holding ISO 9001 often reach AS9100 in six to nine months by closing the aerospace-specific gaps.

Working with AS9100 in a live environment? Our engineers do this every day - and our AI agents automate most of it.

Try it here, free

AS9100 Certification Cost Estimator

Open full tool

Calculator for the total cost of AS9100 certification: registrar fees, consultant, training, internal time and the three year surveillance cycle.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs