Aerospace ERP Requirements
No other industry places as many demands on ERP systems as aerospace. Full material traceability, multi-level lot control, configuration management for 50,000+ part numbers, ITAR access controls, and AS9100 documentation—all running simultaneously in real-time.
- AS9100 requires 100% traceability with zero documentation gaps
- ITAR compliance requiring role-based access controls on all data
- Configuration management for aircraft with 50K-500K unique parts
- MRO operations requiring real-time access to full maintenance history
AI Agents for Aerospace ERP
Netray's aerospace agents enforce compliance automatically, manage traceability proactively, and optimize MRO scheduling predictively. Built specifically for SyteLine, LN, and M3 in aerospace environments.
- Automated AS9100 compliance monitoring and documentation generation
- AI-enforced ITAR access controls with violation prevention
- Predictive MRO scheduling based on flight hours and condition data
- Automated first article inspection (FAI) documentation
Aerospace Results
Aerospace clients achieve zero AS9100 audit findings, 30% reduction in MRO turnaround time, and full ITAR compliance automation. A tier-1 aerospace supplier passed 3 consecutive AS9100 surveillance audits with zero nonconformances after deploying Netray agents.
Try it here, free
AI Agent Runbook Template
A runbook for the person on call when an ERP-connected AI agent misbehaves: how to check it, pause it and roll back.
See aerospace-specific AI agents—request a defense-cleared demo.