AI & Automation4 min readNetray Engineering Team

AI for Steel Drawing Review, RFIs, and Mill Certs

Short answer

In a steel fabrication shop, AI is most useful on document-heavy daily tasks: checking shop drawings against contract documents, drafting RFIs when drawings conflict, verifying mill test reports against specified grades, and answering project-status questions from the ERP. These tasks eat hours of project manager and quality staff time and are error-prone under deadline. This guide describes realistic AI workflows, what each needs, and where a human must still decide.

Mill Test Report Verification

Every heat of structural steel arrives with an MTR listing chemistry and mechanical properties. Someone must confirm that the grade matches the specification, for example A992 for wide flanges or A572 Grade 50 for plate, and that values fall within limits, including yield, tensile, elongation, and carbon equivalent where relevant. Projects with Buy America or domestic-content requirements add a check that the steel was melted and manufactured in the US.

Reading dozens of MTRs per week is tedious. A private AI can extract the heat number, grade, chemistry, and country of melt from scanned certs, compare to the purchase order and spec, and flag mismatches for a person to review.

  • Heat number and grade extraction from scanned PDFs
  • Comparison of values to the ASTM limits for the specified grade
  • Domestic melt flag for projects with Buy America requirements

Shop Drawing Checks Against Contract Documents

Before a shop drawing is released for fabrication, a project manager compares it with the structural drawings and specs. Do the member sizes match the framing plans? Are weld sizes and connection types consistent with the contract details?

Are camber, finishes, and bolt types as specified? AI can assist by reading both sets and listing discrepancies with sheet references, such as a beam size that differs between the plan and the shop drawing. It does not replace review by the engineer of record or detailer coordination, but it can surface candidate conflicts quickly so the reviewer spends time on the real ones.

  • Cross-check sizes, grades, and finishes across drawing sets
  • Flag missing weld symbols or inconsistent connection notes
  • List items needing clarification with sheet and detail references

Drafting RFIs and Tracking Responses

A request for information is how a fabricator resolves conflicts before cutting steel. Good RFIs are specific: they cite sheet numbers, describe the conflict, propose a solution, and note schedule impact. Poor ones are vague and take weeks to get answered.

AI can draft an RFI from a flagged discrepancy, including references and a proposed resolution, for the project manager to edit and send. It can also track open RFIs against the schedule and flag those blocking release of a package. The cost of an unanswered RFI is idle drawings and schedule slip, so visibility matters.

Try it here, free

AI Extraction Human Review SOP Template

Open full tool

A fill-in SOP for human-in-the-loop review of OCR and AI extraction, with thresholds, roles, sampling and escalation.

Answering Project and Job Status Questions

Owners, project managers, and sales staff ask the same questions repeatedly: What is the status of job 2417? Which pieces are waiting on material? How many hours have we spent on the welding of package 3 against budget?

When the answers live in an ERP or fabrication system, a natural-language layer lets staff ask directly, with the underlying query shown and the user's ERP permissions respected. That saves the back-and-forth with the office and reduces misquoted ship dates.

Boundaries and Deployment Considerations

Do not let AI approve drawings, accept material, or send RFIs without a person reviewing them. Verify outputs against the source and keep logs of what the AI read and produced. Many owners restrict drawing distribution, so run models on your own servers using open-weight models and keep documents in your network.

If you handle very few projects or your documents are already well-structured in a detailing system, the manual process may be fast enough that setup cost is not justified.

Frequently asked questions

Can AI read mill test reports?

Yes, AI can extract heat numbers, grades, chemistry, and mechanical properties from scanned MTRs and compare them to the specified grade and your purchase order. Scan quality matters, and a person should review any flagged mismatch. It reduces manual data entry and catches obvious errors, but it does not accept material by itself.

How can AI help with RFIs in steel fabrication?

It can compare drawings, identify conflicts between sheets or between plans and shop drawings, and draft an RFI with the references and a proposed resolution. A project manager reviews and sends it. AI can also track open RFIs and flag those that block release of a fabrication package.

Is it safe to upload structural drawings to an AI tool?

It depends on the contract and the tool. Some owners restrict drawing distribution, and cloud tools may violate those terms. Running open-weight models on your own servers keeps documents inside your network. Check NDA and contract requirements before uploading project documents to any external service.

Give Netray a sample set of MTRs and a drawing set. We will show what a private AI extracts and flags, and where it still needs your review.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs

Integrations