PCBA BOM Cost Rollup Worksheet: Material Cost per Assembly
Every EMS quote and every standard cost starts with a priced BOM. This worksheet gives you a clean line-by-line rollup with overage, so you can see what drives material cost and export it for your costing file.
| Reference designators | Manufacturer part number | Description | Process | Qty per board | Unit price | Overage % | Extended cost | |
|---|---|---|---|---|---|---|---|---|
$3 | ||||||||
$9 | ||||||||
$0 | ||||||||
$0 | ||||||||
$1 | ||||||||
$0 |
Prices are examples. Replace with current distributor or contract pricing at your build quantity. Add one row per unique line; use a range in reference designators for repeated parts.
Automate BOM costing from your ERP
An optional review of rolling BOM cost from your item and purchasing data.
Optional. The tool and every export work without this. No spam.
How to use it
Add one row per BOM line with reference designators, manufacturer part number and description, then the quantity per board, the unit price at your build quantity and an overage percentage. Pick the process to help filter later. Extended cost is calculated for each row and the totals show parts per board and material cost per board. Export to Excel to keep going or send the file to your buyer for quote validation.
- Price at the break for the actual order quantity, not 1 piece
- Add overage on small passives where fall-off is highest
- Keep the same MPN as in your ERP item master
How overage works
Overage adds a percentage to purchased quantity to cover pick-and-place fall-off, setup consumption and reel-end losses. Chip passives typically need the largest overage because they are bought in reels and lost to machine faults, while expensive ICs get a very low overage. Many EMS shops also apply minimum overage counts for tiny parts, so for short runs a fixed number of extras may be more accurate than a percentage.
Common mistakes
The most common mistake is pricing at 1 piece when the order is thousands, which inflates cost, or the opposite, using a reel price for a prototype run and ending up with surplus stock. Another is leaving out non-BOM material such as solder paste, adhesives, labels and packaging. Finally, watch for minimum order quantities and packaging multiples: the cost you pay may be per reel, not per piece used. Compare the result with the cost estimator for labor and overhead.
Frequently Asked Questions
How do I add overage to a PCBA BOM?
Multiply quantity by one plus the overage percent. For example 40 pieces at 8 percent overage means buying 43.2, which you round up to whole pieces or reel lots. The worksheet applies the percent to cost for you.
Does this include assembly labor cost?
No, it is material only. Labor, machine time, test and overhead belong in a separate cost estimate. Use the PCB assembly cost estimator for those and combine the results.
Can I import my BOM from Excel?
You can edit rows directly in the table and export the result to Excel or CSV. Paste in your lines one by one, or use the exported file as the template for your own costing spreadsheet.
What price should I use for each part?
Use the price break matching your total order quantity, from your distributor quote or contract. For standard cost, many companies use a weighted average of recent purchases. Keep a note of the price source and date.
Netray can help pull current standard costs and last purchase prices from your ERP into a BOM view like this one, without rekeying.
Related Tools
Electronics BOM Cost Calculator
Estimate loaded BOM cost per board and annual material spend, including volume pricing tiers, procurement overhead, and attrition.
Electronics ManufacturingPCB Assembly Cost Estimator
Estimate SMT and through-hole assembly cost per board and total order cost from placements, complexity, NRE, and test overhead.
Electronics ManufacturingPCB Panelization Calculator
Work out how many boards fit on a fabrication panel with rails and routing gaps, and how many panels an order needs.
Electronics ManufacturingSolder Paste Volume Calculator
Estimate how much solder paste a board deposits and how many jars a production run consumes, including waste.
Electronics ManufacturingEMS Partner Selection Scorecard
Score a candidate contract manufacturer across 10 weighted criteria, from certifications and quality data to traceability and change handling.
More Costing & Finance tools
See all- Electronics Excess and Obsolete Inventory Worksheet
- Component Price Escalation BOM Impact Calculator
- PCBA NRE and Stencil Amortization Per Unit Calculator
- PCBA Turnkey Quote Worksheet with BOM Rollup and Attrition
- PCBA Quantity Price Break Worksheet
- SAP QM Inspection Effort and Cost Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
- Legacy ERP Retirement Cost and Payback Calculator
- JD Edwards World Month-End Close Procedure Template
Keep exploring
Free tools
- PCBA Turnkey Quote Worksheet with BOM Rollup and AttritionEnter BOM lines with quantity per board, unit price, attrition and placement counts, then roll up material, placement and through-hole cost into a per-board cost and quote price.
- PCBA RFQ Request for Quote TemplateFill in a complete printed circuit board assembly RFQ so EMS providers can quote without back-and-forth questions.
- PCBA Rework Cost Tracking WorksheetLog rework events by work order, defect type, time and material, and get rework cost per line and per board.
ERP fixes and how-tos
- How to Run a Cost Rollup in SyteLineRun a SyteLine standard cost rollup: use Simulate mode first, fix variance exceptions from missing routings or zero-cost items, then post new standard costs.
- How to create an assembly build or work order in NetSuiteHow to build assembly items in NetSuite: when to use a simple Assembly Build versus a Work Order, BOM setup, component availability, and completion steps.
- Epicor Kinetic Costing Workbench: Part Cost, Rollup and Material BurdenHow Epicor Kinetic part cost works: the Costing Workbench, cost rollup for standard cost, material burden, and a practical cost review routine.
Guides
- How to Quote PCB Assembly From a Customer BOMStep by step PCB assembly quoting from a customer BOM: part matching, price breaks, lead time risk, overage and attrition, and quote validity for EMS shops.
- How to Fix SyteLine Cost Rollup VariancesDiagnose and resolve cost rollup variances in Infor SyteLine including material, labor, and overhead cost discrepancies with SQL validation queries and BOM audit steps.
- PCBA Quoting Software for EMS CompaniesHow EMS and PCBA shops evaluate quoting software: BOM import, live distributor pricing, assembly labor models, NRE, and how quotes tie back to the ERP.