What is DriveWorks? Modules, integrations and alternatives
DriveWorks is design automation and sales configurator software that works with SOLIDWORKS. It lets manufacturers capture design rules so that custom variants of a product, with models, drawings and quotes, are generated automatically from a form. It is used mainly by engineer-to-order and configure-to-order companies.
Also known as: DriveWorks Solo, DriveWorks Pro, DriveWorks Xpress, DriveWorks Autopilot
DriveWorks automates the repetitive part of custom design. Engineers define the rules that govern how a SOLIDWORKS model or assembly changes in response to inputs such as dimensions or options. A user then fills in a form, and the system generates the model, drawings, bills of material and often a quote, without an engineer redrawing each variant.
It is mostly used by manufacturers whose products are tailored per order but built from a common design family, such as machinery, enclosures, doors, furniture, stairs and structural items. Because it is tied to SOLIDWORKS, companies that already design in that CAD package can reuse their existing models rather than rebuilding them in a separate configurator.
In a stack, DriveWorks sits between sales or customer input and the CAD, PDM and ERP systems. Outputs such as drawings and bills of material can be stored in PDM and passed to the ERP, while a web-based front end can let sales staff or customers submit specifications. It differs from pure price-list CPQ because the geometry itself is generated.
Modules and capabilities
Design automation
Captures rules that drive SOLIDWORKS parts, assemblies and drawings from user inputs.
Sales configurator
Presents web forms for sales users or customers to specify a product and see results.
Document and drawing generation
Produces drawings, quotes and other documents from templates.
Bill of material output
Generates structured BOM data from the configured design.
Rules and project builder
Tools for engineers to build forms, rules and calculations without writing a full application.
Automation and batch generation
Runs model generation automatically in the background for web and batch use.
Integrations and data access
SOLIDWORKS
Core integration: rules drive SOLIDWORKS models, assemblies and drawings.
PDM
Generated files can be stored in SOLIDWORKS PDM or similar document management systems.
ERP and CRM
Configuration data, quotes and bills of material can be passed to ERP and CRM, typically through custom integration or scripting.
Data sources
Rules can look up data from spreadsheets and databases, such as price lists or material tables.
Web front end
Web-based forms allow sales staff, dealers or customers to submit specifications.
Strengths
- Reuses existing SOLIDWORKS models instead of recreating them in another tool
- Generates real CAD outputs, not only a price and option list
- Engineers can build and maintain rule sets without full software development
- Reduces repeated design effort on variants of a standard product family
- Suits both internal engineering automation and external web configurators
Limitations
- Tied to SOLIDWORKS, so it does not suit companies using other CAD systems
- Model structure must be clean and rule-ready; poorly built models make automation hard
- Pricing, approval and CRM features are lighter than dedicated CPQ suites
- Integration with ERP typically requires custom work
Where AI helps DriveWorks users
- - Extracting design rules from engineering standards and legacy spreadsheets into draft rule sets
- - Checking generated models and bills of material against ERP item masters for mismatches
- - Interpreting free-text customer specifications into form inputs for review
- - Summarizing differences between a generated variant and its nearest standard design
Evaluating DriveWorks? Check these
- Confirm your product family has stable, definable design rules before investing
- Audit your SOLIDWORKS models for robustness and consistent feature structure
- Decide whether the main goal is engineering productivity or a customer-facing configurator
- Plan how generated files and bills of material will move into PDM and ERP
- Start with one product family to measure rule-building effort before scaling
- Check which edition covers web deployment, batch generation and integration needs
Common alternatives: Tacton CPQ, Epicor CPQ, Salesforce CPQ, Autodesk Inventor iLogic, Configit, Custom-built configurator.
Frequently asked questions
What is DriveWorks?
DriveWorks is software for automating SOLIDWORKS-based design and creating sales configurators. Engineers define rules, and users enter specifications in forms, after which models, drawings, bills of material and quotes are generated automatically for custom variants of a product.
Is DriveWorks a CPQ tool?
It overlaps with CPQ because it can collect specifications and produce quotes, but its core strength is generating CAD geometry and drawings. Dedicated CPQ products typically offer richer pricing, approval workflows and CRM integration, so some companies combine the two.
Do I need SOLIDWORKS to use DriveWorks?
DriveWorks is built around SOLIDWORKS, so it is most useful for companies that already design in it. If you use a different CAD system, other configurators or CAD-specific automation tools such as iLogic for Inventor may be a closer fit.
What kinds of products suit DriveWorks?
Products that vary by dimensions and options within a design family, such as machinery, enclosures, doors, structural items and furniture. The key condition is that the design logic can be described as rules, so truly novel one-off engineering is not a good candidate.
How does DriveWorks connect to an ERP?
Usually through custom integration, since generated bills of material and quotes are exported as structured data and loaded into the ERP by scripts or middleware. The scope of that integration is an important item to estimate during project planning.
Running DriveWorks?
We add AI, chat, automation and integrations to the systems manufacturers already run, on-prem if needed.
Get a free assessmentTry it here, free
SOLIDWORKS PDM Private AI Layer Blueprint Generator
Generate a plan for adding a private, on-prem AI assistant to a SOLIDWORKS PDM Professional vault using the PDM API.
Keep exploring
Free tools
- SOLIDWORKS PDM Private AI Layer Blueprint GeneratorGenerate a plan for adding a private, on-prem AI assistant to a SOLIDWORKS PDM Professional vault using the PDM API.
- SOLIDWORKS PDM AI Assistant Sizing and Value CalculatorEstimate GPUs, token volume, index size and payback for a small-team private AI assistant on a SOLIDWORKS PDM vault.
ERP fixes and how-tos
- Product Configurator in Sage X3: How to Set Up Configurable ItemsHow to approach configurable products in Sage X3: features and options, rules, generated BOMs and routings, and when a configurator or a simple option BOM is enough.
- DELMIAworks with SolidWorks, SPC and Shop-Floor Add-onsHow to get a SolidWorks BOM into DELMIAworks, where SPC fits, and how shop floor add-ons connect. Integration patterns and checks, without invented product claims.
- How to add AI to SOLIDWORKS PDM Professional without sending files to a cloudArchitecture for a private AI assistant on SOLIDWORKS PDM Professional: PDM API access, SQL Server vault, permissions, local models, audit and phased rollout.
Runs with your ERP
- Tacton CPQ with JD Edwards EnterpriseOneHow Tacton CPQ configures engineered products and sends sales BOMs to JD Edwards EnterpriseOne, also Oracle Fusion and NetSuite: flows, setup, pitfalls.
- Infor CPQ with Infor SyteLine: Configurator in Order EntryHow Infor CPQ opens from SyteLine order entry for configurable items, returns validated options and creates the order line. Setup, pitfalls, alternatives, FAQ.
- Tacton CPQ with SAP S/4HANA: how the integration worksHow Tacton CPQ connects to SAP S/4HANA and ECC: reusing variant configuration rules, validated BOMs, order creation, setup steps, pitfalls and AI on top.
Guides
- SyteLine Product Configurator Best PracticesSyteLine configurator best practices: structure rules, tune performance for large configurations, and test configure-to-order models before release.
- ERP for Industrial Machinery Manufacturers: ETO, Configuration, and AftermarketERP for industrial machinery manufacturers: engineer-to-order quoting, configurators, project accounting, aftermarket service parts and field service needs.
- SyteLine Configurator Performance: Diagnosis and FixesFix SyteLine configurator performance issues. Slow configuration sessions, rule evaluation bottlenecks, and BOM explosion optimization techniques.
AI on your ERP
- AI for Tacton CPQ: Complement the Constraint Solver, Do Not Replace ItWhere AI helps around Tacton CPQ's constraint-based configurator: RFQ-to-config intake, infeasibility explanations, product model upkeep and ERP BOM handoff.
- AI for SOLIDWORKS PDM: Ask Your Vault and Your ERP the Same QuestionPrivate AI for SOLIDWORKS PDM Professional: search vault metadata, explain where-used and BOM differences, review ECO workflows and sync with your ERP item master.
Software
- Tacton CPQTacton CPQ is constraint-based configure-price-quote software for complex engineered products. Modules, ERP and CRM integrations and alternatives explained.
- Epicor CPQEpicor CPQ is a cloud configure-price-quote product with visual 3D configuration for manufacturers. Modules, ERP integrations and alternatives explained.