MES and production planningSAP Business OneRuns on-prem

Beas Manufacturing with SAP Business One

Beas Manufacturing from Boyum IT Solutions is a native Business One add-on that adds production planning, capacity scheduling, quality control and shop floor control for discrete and process manufacturers. It extends the standard production orders and bills of materials in Business One rather than replacing them.

How Beas Manufacturing connects to SAP Business One

Native SAP Business One add-on

Beas runs inside Business One and shares its database, items, warehouses and production orders. Routings, work centres and shop floor data collection are added on top of the standard objects.

Shop floor terminals and data collection

Operators report time, quantities and scrap through Beas screens or terminals, and postings update Business One production orders and inventory.

What data moves

FromToDataWhen
SAP Business OneBeasItems, BOMs, warehouses and sales ordersShared database, immediate
BeasSAP Business OneProduction orders with routing operationsOrder created and released
Shop floorBeasOperation times, quantities, scrapOperator reports on terminal
BeasSAP Business OneGoods issues, receipts and cost postingsReporting and order close
BeasSAP Business OneInspection results and quality statusQuality check completed

Setting it up

  1. 1Document the current processMap how you plan, release, report and cost production today, including outside processing.
  2. 2Install and licence BeasInstall the add-on with a Boyum partner on a test company first, matching your Business One version and database.
  3. 3Define work centres and routingsCreate work centres, capacities, calendars and operations with realistic setup and run times.
  4. 4Review BOMs and itemsClean BOM levels, yields, scrap factors and issue methods before planning relies on them.
  5. 5Configure quality controlSet inspection plans, characteristics and triggers where quality checks are needed.
  6. 6Set up shop floor reportingConfigure terminals, operator logins and the booking rules for time and quantity.
  7. 7Run parallel and cut overRun a pilot product family and compare costs and stock before widening scope.

What usually breaks

  • !Unrealistic routing times make the capacity schedule meaningless, so operators ignore it.
  • !BOMs with wrong issue methods (backflush versus manual) cause negative stock or missing issues.
  • !Operators skipping bookings produce missing labour cost and false schedule progress.
  • !Customisations to standard production orders in Business One can conflict with Beas and need retesting.
  • !Upgrading Business One requires a matching Beas version, so plan the combined upgrade.
  • !Lot and serial tracking must be configured consistently across Beas operations and inventory.

A private AI layer across both systems

Schedule and delay explanations

A private assistant reads production orders, operations and reports and explains why an order is late (capacity, material, rework) in plain language.

Cost variance review

Compares standard and actual time and material per order and highlights outliers for a cost accountant.

Routing data cleanup

Compares planned and reported operation times and suggests routing updates for a planner to approve.

Shop floor questions

Supervisors ask what is running, what is waiting for material and what scrap occurred, read only.

Try it here, free

SAP Business One Production Order Checklist

Open full tool

A step-by-step checklist for creating, releasing, issuing to, receiving from and closing a production order in SAP Business One.

When something else fits better

  • CompuTec ProcessForce, another Business One manufacturing add-on, which is stronger on process manufacturing in some cases.
  • The standard Business One production module with MRP, if routing and capacity planning are not needed.
  • A separate MES with a Business One connector for complex plants.

Frequently asked questions

Does Beas replace Business One production?

No. It is a native add-on that extends standard production orders and BOMs with routings, scheduling, quality and shop floor control, using the same database and items.

Is it only for discrete manufacturers?

Boyum positions it for discrete and process manufacturers. Heavy process needs such as formulas and co products should be tested against your requirements in a demo.

Can it run on-prem?

As an add-on to Business One, it follows your Business One deployment, including on-prem installations with SQL Server or HANA. Confirm your version and database support with Boyum.

How would AI help a Beas shop?

A private assistant can read Business One and Beas tables read only to explain delays and cost variances. Changes to routings or schedules are proposed for a planner to approve.

Pairing documented at boyum-it.notion.site/Beas-Manufacturing-25eaf9a8bf7f445e977e25080103b851 . Beas Manufacturing is a product of Boyum IT Solutions; Netray is independent and not affiliated with either vendor.

Get SAP Business One alerts

Support and maintenance deadlines, release changes that affect SAP Business One sites, and new free SAP Business One tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP Business One: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP Business One? Start with the SAP Business One guide and toolkit.