WMSSAP Business OneRuns on-prem

Produmex WMS and SAP Business One: warehouse management for SMEs

Produmex WMS is a native Business One add-on from Boyum IT Solutions that adds warehouse management for SME distributors and manufacturers. It integrates with Boyum's Beas manufacturing and B1UP products.

How Produmex WMS connects to SAP Business One

Native SAP Business One add-on

Boyum describes Produmex WMS as a native add-on, so warehouse activity is recorded in Business One documents and inventory rather than in a separate database.

Integration with Beas and B1UP

The vendor states integration with Beas manufacturing and B1UP. If you run Beas, production picking and receipts can follow the same warehouse logic. Check the supported version combinations with Boyum.

What data moves

FromToDataWhen
Business One purchase ordersWMS inboundExpected receipts, items and quantitiesOrder released to warehouse
WMSBusiness OneGoods receipt and putaway to bins with lot or serial dataOperator confirms receipt and putaway
Business One sales ordersWMS outboundPick tasks and shipping requirementsOrder release or wave creation
WMSBusiness One deliveryPicked quantities, lots and packingPick and pack confirmation
Beas production ordersWMSComponent pick demand and finished goods receiptProduction order release

Setting it up

  1. 1Map warehouse processesDocument receiving, putaway, picking, packing and shipping as they run today, and note which need directed logic.
  2. 2Design bin structureDefine warehouses, zones and bin locations, with naming rules that survive growth.
  3. 3Prepare item dataSet units of measure, barcodes, lot or serial flags and storage rules per item.
  4. 4Install and configureInstall the add-on, set strategies for putaway and picking, and assign user roles.
  5. 5Choose scanning hardwarePick handhelds and label printers, and test Wi-Fi throughout the building.
  6. 6Load opening stock by binReconcile stock to bins before go-live so the WMS starts accurate.
  7. 7Go live in phasesStart with receiving or one warehouse, then add picking and shipping.

What usually breaks

  • !Opening stock loaded at warehouse level without bins makes putaway and picks fail on day one.
  • !Items with mixed units of measure cause pick quantities to be misunderstood by operators.
  • !Lot and expiry rules set inconsistently let the wrong batch be picked, which matters in regulated goods.
  • !Overriding system picks by hand without scanning creates stock that is in the wrong bin on paper.
  • !Upgrades to Business One, Beas or the add-on out of sync break the integration between them.

A private AI layer across both systems

Putaway and pick exception triage

A private assistant can group stuck tasks, short picks and bin mismatches from Business One and WMS data and suggest the likely cause.

Stock accuracy investigation

For a count discrepancy it can trace the movement history of an item and bin and show where quantity diverged.

Slotting suggestions

It can analyse pick frequency and propose bin changes for a warehouse lead to review, without moving stock itself.

Plain-language inventory questions

Customer service can ask what is available, reserved or in quarantine for an item and get the answer from live data.

Try it here, free

SAP B1 Warehouse Bin Location Capacity Planner

Open full tool

An editable worksheet to list bin codes, dimensions and fill factor, compute usable volume and plan bins before you load them into a B1 warehouse.

When something else fits better

  • Basic Business One bin locations and standard transfers are enough for a single small warehouse with simple flows.
  • Produmex Scan gives mobile scanning for transactions without the full WMS feature set.
  • A larger standalone WMS suits multi-site or automated operations beyond SME needs.

Frequently asked questions

Who is Produmex WMS for?

Boyum positions it for SME distributors and manufacturers running Business One. Larger or highly automated operations with conveyors, shuttles or multi-site orchestration may outgrow it. Confirm the details with the vendor for your version and deployment before committing. Test it in a pilot on your own data before rolling it out widely.

How is it different from Produmex Scan?

Scan is aimed at mobile data collection for transactions. WMS is the warehouse management product. Compare them by how much directed putaway, picking strategy and process control you need. Confirm the details with the vendor for your version and deployment before committing.

Does it work with Beas?

Boyum states integration with its Beas manufacturing product and with B1UP. Confirm supported versions and which production flows are covered for your plant. Confirm the details with the vendor for your version and deployment before committing. Test it in a pilot on your own data before rolling it out widely.

What would a private AI layer do here?

It reads Business One and warehouse data on your servers to explain exceptions, trace stock variances and answer inventory questions. Suggested changes to stock or bins are drafted for a person to approve. Confirm the details with the vendor for your version and deployment before committing.

Pairing documented at www.boyum-solutions.com/produmex-wms-warehouse-management-solution . Produmex WMS is a product of Boyum IT Solutions; Netray is independent and not affiliated with either vendor.

Get SAP Business One alerts

Support and maintenance deadlines, release changes that affect SAP Business One sites, and new free SAP Business One tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP Business One: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP Business One? Start with the SAP Business One guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Integrations

Software