PLM / CAD integrationSAP ECCRuns on-prem

XPLM Integration Platform: SOLIDWORKS PDM with SAP ECC

XPLM's integration platform gives SOLIDWORKS PDM and SAP a bi-directional exchange of CAD files, BOMs and material masters, documented in a SOLIDWORKS partner paper as an SAP-certified integration. Engineers release parts and assemblies in PDM and the material and BOM appear in SAP; the same integration is listed for S/4HANA. It is aimed at companies that design in SOLIDWORKS and plan in SAP.

How XPLM Integration Platform for SOLIDWORKS PDM connects to SAP ECC

SAP-certified integration platform

XPLM sits between SOLIDWORKS PDM and SAP, mapping PDM attributes and structures to SAP material master, BOM and document info records. Exact SAP interfaces are set by the vendor; confirm them in the XPLM documentation.

What data moves

FromToDataWhen
SOLIDWORKS PDMSAP ECCMaterial master attributes for released partsRelease or state change in PDM
SOLIDWORKS PDMSAP ECCMulti-level BOM structure with quantities and unitsAssembly release
SOLIDWORKS PDMSAP ECCCAD drawings and models linked as documentsRelease or revision
SAP ECCSOLIDWORKS PDMMaterial numbers and status feedbackMaterial created in SAP

Setting it up

  1. 1Define ownership of master dataDecide which fields engineering owns in PDM and which purchasing or planning owns in SAP, so syncs do not overwrite each other.
  2. 2Align numberingAgree how PDM part numbers map to SAP material numbers, including material types and industry sector.
  3. 3Map attributesMap PDM data cards to SAP fields such as base unit of measure, material group, weight and description language.
  4. 4Map BOM rulesDecide how PDM configurations, phantom assemblies and purchased items become SAP BOM item categories.
  5. 5Set release workflowTie the PDM workflow state to the trigger that creates or changes SAP records, with an approval step.
  6. 6Pilot with one product familyRelease a small assembly, inspect the SAP BOM and documents, then fix mappings before widening.
  7. 7Plan change handlingDefine how engineering changes flow, including effectivity dates and whether change numbers are used.

What usually breaks

  • !Unit of measure differences between CAD and SAP produce wrong BOM quantities.
  • !Configurations in SOLIDWORKS can explode into many SAP materials if rules are not set deliberately.
  • !Released BOM changes in PDM that conflict with open production orders in SAP need a change-management rule.
  • !Both systems editing the same description or weight field leads to silent overwrites.
  • !Document links break when file vault paths or SAP document servers are reorganized.
  • !Language and character set rules for descriptions are often forgotten until the first multi-plant rollout.

A private AI layer across both systems

Sync failure explainer

A private assistant reads integration logs and both systems' records to say which attribute or BOM rule caused a rejected release, and drafts the correction for engineer approval.

PDM versus SAP drift check

Compare released PDM BOMs with SAP BOMs on a schedule and list parts where revision, quantity or unit differs.

Duplicate part search

Ask in plain language whether a similar part already exists in SAP before a new one is released, using retrieval over material descriptions and drawings.

Try it here, free

SOLIDWORKS PDM Private AI Layer Blueprint Generator

Open full tool

Generate a plan for adding a private, on-prem AI assistant to a SOLIDWORKS PDM Professional vault using the PDM API.

When something else fits better

  • A scheduled flat-file or CSV export from PDM into SAP material and BOM load programs is a cheaper start for small part counts.
  • SAP's own CAD integration or an SAP PLM setup fits teams that want engineering data managed inside SAP.
  • Staying with manual BOM entry is acceptable when you release only a handful of assemblies a year.

Frequently asked questions

Is this a certified SAP integration?

The SOLIDWORKS partner paper describes the XPLM integration as SAP-certified for ECC and S/4HANA. Certification scope can be specific to a release, so ask XPLM to confirm it against your exact SAP version.

Which data moves?

CAD files, BOMs and material masters, in both directions according to the vendor. The practical question is who owns each field, so settle that before building the mapping.

Do we need SOLIDWORKS PDM Professional?

The integration targets SOLIDWORKS PDM, but edition requirements are the vendor's call. Check XPLM and SOLIDWORKS documentation for the supported PDM edition and version.

Can AI create the SAP materials for us?

A private AI assistant can draft material records and flag duplicates, but creation should stay behind the XPLM release workflow and a human approval, not direct writes into SAP.

Pairing documented at files.solidworks.com/partners/pdfs/sap%5Fepdm%5Fen2%2Epdf . XPLM Integration Platform for SOLIDWORKS PDM is a product of XPLM; Netray is independent and not affiliated with either vendor.

Get SAP ECC 6.0 alerts

Support and maintenance deadlines, release changes that affect SAP ECC 6.0 sites, and new free SAP ECC 6.0 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP ECC 6.0: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP ECC 6.0? Start with the SAP ECC 6.0 guide and toolkit, or plan with SAP ECC to S/4HANA Conversion Planner, Training Path Builder, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Software