PLM and CAD integrationSAP S/4HANARuns on-prem

SOLIDWORKS PDM with SAP S/4HANA: CIDEON material and BOM integration

The CIDEON SOLIDWORKS PDM Professional Integration lets engineers create and update SAP materials and BOMs from SOLIDWORKS PDM part lists in one click. It is listed as an SAP partner solution on the SAP Store for S/4HANA and S/4HANA Cloud. Engineering keeps designing in CAD and PDM, and SAP receives released structures.

How CIDEON SOLIDWORKS PDM Professional Integration connects to SAP S/4HANA

SAP partner solution (SAP Store)

The add-in works from within the PDM client. It reads the part list or BOM structure from SOLIDWORKS PDM and creates or updates the corresponding material masters and BOMs in SAP. The vendor describes this as one-click; the exact SAP interfaces and release dependencies should be confirmed with CIDEON.

What data moves

FromToDataWhen
SOLIDWORKS PDMSAP S/4HANANew material masters from parts and assembliesEngineer transfers a released item
SOLIDWORKS PDMSAP S/4HANABOM structure with quantities and unitsPart list transfer
SOLIDWORKS PDMSAP S/4HANAChanges to existing materials and BOMsRevision released in PDM
SAP S/4HANASOLIDWORKS PDMTransfer status and SAP material numbersAfter posting

Setting it up

  1. 1Define the engineering-to-ERP handoverDecide at which PDM workflow state a part may go to SAP and who is allowed to trigger the transfer.
  2. 2Agree on material master fieldsDecide which SAP views and fields are filled by engineering and which by purchasing, planning and costing.
  3. 3Map PDM attributes to SAP fieldsMap description, unit of measure, material type, weight and revision to SAP fields and rules.
  4. 4Settle numberingDecide whether SAP material numbers come from SAP number ranges or are derived from the PDM item number.
  5. 5Configure the SAP connection and authorizationsCreate a technical user with rights to maintain materials and BOMs for the relevant plants.
  6. 6Test with real assembliesTransfer multi-level assemblies, change a revision, and compare SAP BOMs with the PDM structure.

What usually breaks

  • !Unit of measure and quantity rounding in CAD part lists not matching SAP BOM rules.
  • !Phantom or virtual assemblies and purchased parts treated wrongly as manufactured items.
  • !Change numbers and revision handling in PDM not aligned with SAP engineering change management.
  • !Duplicate materials created because numbering rules differ between CAD descriptions and SAP search.
  • !Plant-specific views missing, so production cannot use the new material until someone extends it.

A private AI layer across both systems

Transfer error triage

A private assistant reads transfer failures and SAP messages, explains the cause such as a missing material type, and drafts the correction for engineering to approve.

Duplicate material detection

Search SAP and PDM descriptions and attributes to flag likely duplicates before a new material is created.

BOM comparison

Compare the released PDM structure with the SAP BOM and summarize differences in plain language for the change board.

Try it here, free

SOLIDWORKS PDM Private AI Layer Blueprint Generator

Open full tool

Generate a plan for adding a private, on-prem AI assistant to a SOLIDWORKS PDM Professional vault using the PDM API.

When something else fits better

  • SAP Engineering Control Center or other SAP PLM integrations, if you want an SAP-native engineering hub.
  • Manual BOM entry from exports, workable only for very small catalogs.
  • Other PDM-to-ERP connectors, if you use a different PDM or PLM than SOLIDWORKS PDM Professional.

Frequently asked questions

What does the integration create in SAP?

According to CIDEON, it creates and updates SAP materials and BOMs from SOLIDWORKS PDM part lists in one click. Which fields and views are filled depends on your configuration, so plan the split between engineering and downstream functions.

Does it work with on-prem S/4HANA?

The SAP Store listing covers S/4HANA and S/4HANA Cloud. For an on-premise system, confirm the supported release and connection method with CIDEON, as network access from the PDM client or server to SAP must be planned.

Where can private AI help?

A private assistant on your own servers can check transfer errors, find duplicate materials and compare PDM and SAP BOMs, with engineers approving any correction. Design data stays inside your network.

Pairing documented at www.sap.com/products/scm/partners/cideon-software-services-gmbh-cokg-cideon-soli . CIDEON SOLIDWORKS PDM Professional Integration is a product of CIDEON Software & Services; Netray is independent and not affiliated with either vendor.

Get SAP S/4HANA alerts

Support and maintenance deadlines, release changes that affect SAP S/4HANA sites, and new free SAP S/4HANA tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP S/4HANA: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP S/4HANA? Start with the SAP S/4HANA guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Software