On-Prem AIFree calculatorPDF, Excel, Word exportabas ERP / proALPHA

abas ERP and proALPHA AI Assistant Sizing and Value Calculator

This free calculator sizes a private AI assistant for abas ERP or proALPHA: GPU count, token load, document index size, hours saved and payback in euros. Use the chart to compare cost and value as the user base grows.

Your numbers

users

Licensed or named abas ERP and proALPHA users who could use the assistant.

40 %

Percent of named users who ask at least one question per day.

questions
tokens

Include retrieved context. Typical range 1000 to 3000.

documents
pages
minutes

Measure in a pilot; this is the most uncertain input.

per hour
per GPU per month

Amortised purchase plus power, space and support, or a private cloud rate.

tokens/s

Assumption: depends on model, quantisation and batching. Measure on your hardware.

once

Integration, indexing, testing and rollout effort.

Your results

GPUs needed
1
Larger of the GPUs needed to hold the model and load divided by throughput per GPU.
Net monthly value
EUR 22,060
Active users per day
60
Questions per day
420
Tokens per day
840,000
Questions per day times average tokens per question.
Peak concurrent requests
1
Assumes 25% of daily questions in the busiest hour and 20 seconds per answer.
Peak load
58
Tokens per second: the larger of 40 tokens/s per concurrent stream and busy-hour token volume.
GPUs with a standby replica
2
Adds one more model replica for resilience.
Vector index size
4.32
GB, assuming 2 chunks per page and about 6 KB per chunk including vectors and metadata.
Hours saved per month
588 hrs
21 working days per month.
Monthly value
EUR 26,460
Monthly GPU cost (with standby)
EUR 4,400
Simple payback
3.4 months
Setup cost divided by net monthly value. Zero means value does not cover running cost.

Planning estimate. Throughput, minutes saved and token counts vary widely; measure them in a pilot before committing budget.

Free, optional. Reopen it on any device.
Save results:

Monthly value vs GPU cost by named users

Sweeps Named users from 10 to 1000, holding your other inputs fixed.

Optional pilot scoping for abas and proALPHA

We can help turn these estimates into a measured pilot.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the calculator

Enter named ERP users and the active share, the questions each asks daily and the tokens per question and answer. German text often uses more tokens than English, so consider a higher figure. Add documents to index and their average pages, minutes saved, loaded hourly cost in euros, monthly GPU cost and a one-time setup cost.

Formulas and assumptions

Active users equal named users times the active share, and daily questions follow. Peak concurrency assumes 25 percent of questions in the busiest hour at 20 seconds per answer. Load is the larger of concurrency times 40 tokens per second and busy-hour tokens per second. GPUs are the larger of the model requirement and load over throughput per GPU, and the standby adds a model replica. Index size uses 2 chunks per page at about 6 KB. A month is 21 working days. Currency is euros.

Reading the result

For DACH mid-size manufacturers the GPU count is typically small. The cost that matters is the reporting layer and the German-language evaluation, which belong in setup. Value rests on minutes saved, so measure it. A zero payback means monthly value does not exceed running cost with your inputs.

Frequently Asked Questions

Why do tokens per question matter for German?

German compounds and long technical terms often split into more tokens than English. If your prompts and answers are German, use a higher token figure than for English.

Does it include licence costs?

Open-weight model licences are generally free to use, but check each licence. The calculator covers GPU running cost and a one-time setup figure you enter, not ERP vendor fees.

Can I use it for one ERP only?

Yes. The inputs are generic, so enter users and documents for the one system you plan to cover first.

How should I treat the payback?

As a hypothesis to test. Run a pilot, measure real minutes saved and update the input. Payback is simple setup cost over net monthly value.

If you want these estimates tested against your own abas or proALPHA usage, Netray can help scope a pilot. The calculator needs no contact.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations

Software