Costing & FinanceFree calculatorPDF, Excel, Word exportAfrica

Africa FX Devaluation Landed Cost Sensitivity Calculator

In many African markets the exchange rate moves faster than purchase prices can be renegotiated. This what-if shows how much more an imported part costs in local currency when the currency depreciates, including the duty that is charged on the higher CIF value.

Your numbers

USD
units
local per USD

Local currency units per one US dollar today.

20 %

Percentage rise in the local price of the dollar.

% of FOB
% of CIF
%

Charged on CIF plus duty. Recoverable for VAT-registered manufacturers.

% of CIF

Your results

Landed cost excluding recoverable VAT
532,094,400
Landed cost per unit
106,418.88
Exchange rate after depreciation
1,800
CIF value in local currency
470,880,000
Import duty
47,088,000
Clearing and local charges
14,126,400
Landed cost per unit at today's rate
88,682.4
Increase vs today's rate
20%

Planning model. Duty, VAT and charges are simplified percentages. Replace them with the tariff line, exemption and invoice figures for your shipment.

Free, optional. Reopen it on any device.
Save results:

Landed cost per unit vs depreciation

Sweeps Local currency depreciation from 0 to 80, holding your other inputs fixed.

PO revaluation scenario

Optional: a read-only simulation of open purchase orders under an FX scenario.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter the foreign price, quantity and today's exchange rate in units of local currency per dollar. Move the depreciation slider to see the new landed cost. The currency field is blank on purpose so the tool works for naira, cedi, kwacha, birr, shilling or any other currency.

  • Use your real freight and insurance percentage from the last shipment
  • Set VAT to zero if you recover it fully and want a net cost view
  • Check which rate your customs authority uses for valuation

The formula

CIF in local currency equals FOB times (1 plus freight percentage) times the exchange rate. Duty and clearing charges are percentages of that CIF, so a weaker currency raises them too. Landed cost equals CIF plus duty plus clearing. Import VAT is not part of cost for a registered manufacturer who can recover it, which is why the tool excludes it from the landed total.

Reading the result

Cost per unit rises one for one with the exchange rate when every charge is a percentage of CIF. A 20% depreciation lifts the landed cost by 20%. If you hold finished goods priced in local currency, compare this increase with your price rise to see the margin squeeze, and use the chart to choose a hedge or pre-buy trigger.

Common mistakes

Finance teams often update the exchange rate but leave fixed local charges unchanged, or forget that duty is assessed on the customs rate and not the bank rate. In the ERP, cost the purchase order at the expected receipt date rate and let the landed cost allocation post variances.

Frequently Asked Questions

Does the tool work for any currency?

Yes. Enter the exchange rate as units of your local currency per one US dollar and read the results in the same units. The currency symbol is blank so it does not mislead.

Why is import VAT excluded from landed cost?

A VAT-registered manufacturer usually recovers import VAT as input tax, so it is a cash flow item and not a product cost. If you cannot recover it, add it into the duty percentage or raise the clearing percentage.

Which exchange rate do customs use?

Customs authorities often publish their own valuation rate, which can differ from the bank or parallel rate. Use the customs rate for duty and the bank rate for payment to the supplier when you need a precise figure.

Can I model a rate band instead of one value?

Run the calculator with several depreciation values and compare the results, or read the chart, which sweeps the whole range. For formal scenarios, export to Excel and keep the table alongside your budget.

If you want ERP purchase orders revalued automatically against a rate scenario, we can prototype a read-only simulation over your open PO data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring