Engineering & PLMFree referencePDF, Excel, Word exportPowder Metallurgy and MIM

Additive, MIM and Powder Metallurgy Material Density and Process Reference

Mass, powder cost and shrinkage calculations all start with a density, and the right number depends on the alloy and the route. This reference lists common additive, MIM and powder metallurgy metals with their density, typical routes and short notes.

Download:
MaterialFamilyDensity (g/cm3)Typical routesNotes
316L stainless (UNS S31603)
Stainless steel
7.99
PBF-LB, binder jet, MIM, PM
Corrosion resistant, common AM and MIM baseline alloy
304L stainless (UNS S30403)
Stainless steel
7.90
PBF-LB, binder jet, PM
Austenitic, lower cost than 316L
17-4 PH (UNS S17400)
Stainless steel
7.78
PBF-LB, binder jet, MIM
Precipitation hardening, heat treated to H900 to H1150 conditions
420 stainless (UNS S42000)
Stainless steel
7.74
Binder jet, MIM, PM
Martensitic, hardenable
410L stainless
Stainless steel
7.70
PM
PM structural and magnetic parts; sintered density is lower
MIM-2200 (Fe-2Ni)
Low-alloy and carbon steel
7.5 to 7.7 typical sintered
MIM
MPIF Standard 35 MIM designation, case hardenable
MIM-2700 (Fe-7Ni)
Low-alloy and carbon steel
7.5 to 7.7 typical sintered
MIM
MPIF Standard 35 MIM designation, higher nickel for toughness
MIM-4605 (Fe-Ni-Mo-C)
Low-alloy and carbon steel
7.5 to 7.7 typical sintered
MIM
Heat treatable low-alloy steel
4140 steel (UNS G41400)
Low-alloy and carbon steel
7.85
DED, MIM
Quench and temper chromium-molybdenum steel
FC-0208 (Fe-Cu-C)
Low-alloy and carbon steel
6.6 to 7.0 typical sintered
PM press and sinter
MPIF designation, nominal 2 percent copper and 0.8 percent carbon
FN-0205 (Fe-Ni-C)
Low-alloy and carbon steel
6.6 to 7.1 typical sintered
PM press and sinter
MPIF designation, nominal 2 percent nickel, heat treatable
FL-4605 (Fe-Ni-Mo-C)
Low-alloy and carbon steel
6.9 to 7.4 typical sintered
PM press and sinter
Prealloyed molybdenum, heat treatable, common structural grade
Maraging 18Ni300 (1.2709)
Tool steel
8.00
PBF-LB
Age hardened tooling and conformal-cooling inserts
H13 tool steel (UNS T20813)
Tool steel
7.80
PBF-LB, DED, binder jet
Hot-work steel for dies
Ti-6Al-4V Grade 5 (UNS R56400)
Titanium
4.43
PBF-LB, PBF-EB, DED, MIM
Most common AM titanium alloy, aerospace and medical
Ti-6Al-4V ELI Grade 23
Titanium
4.43
PBF-LB, PBF-EB
Extra low interstitials for implants
CP titanium Grade 2
Titanium
4.51
PBF-LB, MIM, PM
Commercially pure, corrosion resistant
Inconel 718 (UNS N07718)
Nickel and cobalt alloy
8.19
PBF-LB, DED, MIM
Age hardened, aerospace turbine and propulsion parts
Inconel 625 (UNS N06625)
Nickel and cobalt alloy
8.44
PBF-LB, DED
Solution strengthened, corrosion resistant
Hastelloy X (UNS N06002)
Nickel and cobalt alloy
8.22
PBF-LB
Oxidation resistant, combustor parts
Haynes 282 (UNS N07208)
Nickel and cobalt alloy
8.29
PBF-LB, DED
Gamma prime strengthened, weldable
CoCrMo (ASTM F75)
Nickel and cobalt alloy
8.30
PBF-LB, PBF-EB, MIM
Biomedical and dental alloy
AlSi10Mg
Aluminum
2.67
PBF-LB
Cast-type alloy, the most common AM aluminum
Al 6061 (UNS A96061)
Aluminum
2.70
DED, PM
Difficult in laser powder bed due to cracking without modified chemistry
Copper (C11000 equivalent)
Copper
8.96
PBF-LB, binder jet, MIM
High reflectivity; green or high-power lasers help
CuCrZr (UNS C18150)
Copper
8.90
PBF-LB
High conductivity with strength, rocket and heat exchanger parts
Bronze 90/10 (Cu-Sn)
Copper
8.78
PM press and sinter
Self-lubricating porous bearings are impregnated with oil
Tungsten
Refractory and hard metal
19.25
PM, MIM, PBF-LB
High melting point, radiation shielding
Tungsten heavy alloy (90W-7Ni-3Fe)
Refractory and hard metal
17.0 typical
PM, MIM
Liquid-phase sintered counterweights and shielding
Cemented carbide WC-10Co
Refractory and hard metal
14.5 typical
PM, binder jet
Cutting tools and wear parts, sintered near full density
Fe-50Ni soft magnetic
Soft magnetic
8.25
MIM, PM
High permeability nickel-iron alloy
Fe-3Si soft magnetic
Soft magnetic
7.65
MIM, PM
Silicon iron for magnetic cores

Densities are handbook values for planning mass and cost, not specification limits. PM and MIM parts are not fully dense, so use the sintered density you measure. Check the governing specification, such as MPIF Standard 35 for PM and MIM materials, for design values.

Structured material data in your ERP

Optional: a review of storing density, route and specification attributes on item master records.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search by alloy name, UNS number, family or route. The density column gives the fully dense wrought value for wrought-equivalent alloys, and a typical sintered range where noted for PM and MIM designations. Copy the density into the build cost, nesting and shrinkage calculators to convert part volume to mass. The routes column shows which processes commonly handle the alloy, which narrows the make-or-print options.

  • Use sintered density for MIM and PM parts, not the wrought value.
  • Confirm alloy availability with your powder or service supplier.
  • Check the governing specification for design values.

Understanding the routes

Laser and electron beam powder bed fusion (PBF-LB, PBF-EB) produce near fully dense metal parts layer by layer. Binder jet prints a green part that is sintered, like MIM, and shrinks. DED deposits metal from powder or wire for repair and large features. Metal injection molding (MIM) molds feedstock, debinds and sinters, and suits small complex parts at high volumes. Press-and-sinter PM compacts powder in a die and suits axially pressed shapes at very high volumes.

Density, porosity and cost

Density drives cost in two places. Powder price per kilogram multiplied by part mass sets material cost, and heavier alloys such as nickel and tungsten alloys cost more for the same volume. Porosity changes properties: PM structural parts at 6.6 to 7.0 g/cm3 have lower strength and ductility than wrought steel, and MIM parts at 95 to 99 percent density approach wrought properties. Fully dense AM parts may still need HIP to close internal voids in fatigue-critical applications.

Common mistakes

Using wrought density for a porous PM part overestimates its mass, often by ten percent or more. Mixing trade names with standard designations is another problem: check composition and condition, not only the label. Alloys on this list that are marked difficult, such as 6061 aluminum in laser powder bed, usually need modified chemistries. Finally, powder and feedstock prices vary widely by size distribution and supplier, so use quotes, not list averages, for budgets.

Frequently Asked Questions

Which density should I use for mass calculations?

For fully dense AM parts, use the wrought density. For MIM and PM parts, use the measured or specified sintered density, because porosity reduces mass compared with the wrought value.

What is MPIF Standard 35?

It is the Metal Powder Industries Federation standard that defines materials and designations for PM structural parts, with companion editions for MIM and other PM materials. It lists compositions, properties and design values used in drawings.

Why are some alloys marked difficult in some processes?

Alloy chemistry, thermal conductivity, reflectivity and solidification range affect printability. For example, standard 6061 tends to crack in laser powder bed fusion, and pure copper reflects infrared lasers strongly.

Is the density the same for powder and part?

No. Powder has apparent and tap densities that are well below the solid density because of gaps between particles. The values here are for solid material, which you use for part mass.

If your item master and BOMs should carry density, route and material specifications consistently, we can help clean and structure that data in your ERP.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

Manufacturing hubs