SAP Engineering Change Affected Materials Impact Worksheet
An engineering change touches more materials than the change request lists. This worksheet gives the change coordinator a simple table for every affected material, with quantities, cost and disposition, and exports to Excel for the change board.
| Material | Change type | Stock | WIP | Open PO | Unit cost | Exposure | Disposition | Effective from | |
|---|---|---|---|---|---|---|---|---|---|
$13,760 | |||||||||
$1,080 | |||||||||
$26,500 | |||||||||
$4,884 | |||||||||
$200 |
Fill this from the where-used list and stock reports for the parts named on your engineering change number. Exposure is gross, so it does not subtract rework or salvage value; use the obsolescence exposure calculator for a net estimate.
Automated change impact list
Optional help generating this worksheet from where-used and stock data.
Optional. The tool and every export work without this. No spam.
How to use it
Start from the where-used list of each changed component and add every material in the BOM tree that is affected, including subassemblies and finished goods. For each row, record stock, WIP and open purchase quantity, the unit cost and the disposition decided by the board. The worksheet calculates exposure per row and totals the sheet.
- Add one row per material and plant if values differ
- Set an effective date per row
- Export to Excel for the approval pack
Why dispositions matter
Every affected quantity needs a decision. Use up is cheapest when the effectivity allows a run-out. Rework applies when a part can be modified or used elsewhere. Scrap and return to vendor are last resorts, and open purchase orders either continue, change or are cancelled. Writing it down per material prevents the surprise of finding old parts on the line after cut-in.
Reading the totals
The total exposure is the gross value of everything touched. The largest single exposure shows where to focus effort, because one expensive subassembly can dominate the sheet. The average exposure helps compare changes of different sizes.
Common mistakes
The usual failure is incomplete scope: only the changed component is listed, while assemblies built with it sit in stock. Another is leaving out service parts, since a change that affects the field may also affect spares.
- Leaving out stocked subassemblies
- Ignoring service and spare parts
- No effective date for each row
Frequently Asked Questions
Where do I get the affected materials?
Run a where-used for the changed component through all BOM levels, then add materials from your change request. Include variants and plants. A multi-level where-used report is the usual starting point.
Is exposure the same as loss?
No. It is the gross value of the quantities touched. The loss depends on dispositions and recovery, which the obsolescence exposure calculator estimates.
Can I attach this to the change record?
Export it to Excel or PDF and attach it to your change request, or reference it in the change master record according to your process.
Should every plant have its own row?
Yes if stock, cost or effective dates differ by plant. Otherwise a single row with the combined quantities is easier to review.
Netray can help generate this list automatically from where-used data and stock reports, so every change starts with a complete impact table.
Related Tools
SAP Engineering Change Obsolescence Exposure Calculator
Quantify the write-off risk of replacing a component and estimate when old stock runs out so you can set the right effectivity date.
Costing & FinanceSAP Standard Cost Estimate BOM Rollup Calculator
Check a unit cost with scrap, setup per lot and overhead surcharges, the way a costing run (CK11N or CK40N) builds it.
SAPSAP VC Material Master Reduction Calculator
Estimate how many material master records, creation hours and maintenance hours you avoid by moving from a part per variant to a configurable material.
Developer ToolsSAP Configurable Material Selection ABAP Generator
Fill in plant and material type to get an ABAP report that lists configurable materials and counts them by plant.
More Engineering & PLM tools
See all- SAP Super BOM Design Worksheet
- SAP Engineering Change Number Checklist
- SAP Document Info Record Template
- SAP Change Master and Revision Level Log
- SAP Engineering Change Request (ECR) Template
- SAP BOM Usage and Item Category Reference
- Cloud MRP BOM Data Cleanup Worksheet
- Part Numbering Scheme Generator Template
- BOM Accuracy Calculator
Keep exploring
Free tools
- SAP Engineering Change Number ChecklistWalk through a change master from reason and effectivity to affected objects and release so no BOM, routing or document is changed without a number.
- SAP Engineering Change Request (ECR) TemplateA structured change request form that captures the reason, impact on stock and open orders, and approvals before a change number is created.
- Engineering Change Cost Impact CalculatorEstimate the full one-time cost of an engineering change and the payback period against annual savings before you approve it.
AI on your ERP
- AI for Engineering Change Impact on BOMs, Routings, and Open OrdersAI reads a proposed ECO against live BOM, routing, and open order data to show engineering exactly what a change touches before it gets released.
- AI for SAP S/4HANA in Industrial Machinery: Project Structures, Variant BOMs and Aftermarket PartsAI on SAP S/4HANA for machinery builders: project WBS, variant BOMs, engineering changes and spare parts answered from your live data, on-prem and read-only.