SAP Engineering Change Obsolescence Exposure Calculator: Stock, WIP and Open POs at Risk
Before an engineering change is released, someone has to answer a simple question: what do we lose if the old component stops being used today? This calculator turns stock, WIP and open order quantities into a net loss estimate and a run-out time.
Your numbers
Your results
Planning model. Accounting treatment of write-downs, scrap and supplier settlements depends on your policies and local rules.
Net loss vs share reworked or reused
Sweeps Quantity that can be reworked or used elsewhere from 0 to 100, holding your other inputs fixed.
Change impact from live data
Optional help pulling stock, WIP and order quantities for the parts in your next engineering change.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Take stock on hand from MMBE, WIP from your production orders and open quantities from the purchase order list. Enter the unit cost and estimate what share can be reworked or consumed in other products. Rework has a cost and the remainder has a salvage value, which may be zero. Add a cancellation charge for open purchase orders from supplier terms.
- Use plant level quantities, not company totals
- Check consignment and vendor owned stock separately
- Enter a conservative salvage value
The method
Recovered value equals the reworked share times unit cost net of rework cost, plus the remaining share times salvage. Net loss is the book value of stock and WIP minus recovered value, plus the cost of cancelling open orders. Weeks to consume divides on-hand quantity by weekly consumption, and tells you whether a run-out date is realistic instead of an immediate cut-in.
Using the result in an ECN
In SAP an engineering change number controls a date effectivity, so you can often pick the date at which the old component stops being used. If weeks to consume is short, set the effectivity to match and avoid the loss. If the part is safety critical or a regulatory change forces a hard date, the net loss is the cost of that decision and belongs in the approval record.
Common mistakes
Forgetting subassemblies and finished goods that contain the old part is the most common error. Others include ignoring supplier cancellation windows, forgetting field stock held by distributors, and double counting open orders already reflected in expected receipts.
- Missing parts embedded in stocked subassemblies
- Ignoring supplier lead time that makes cancellation free
- Using standard cost when actual cost differs
Frequently Asked Questions
Is this an accounting write-off calculator?
No. It estimates economic exposure to support the change decision. Accounting for inventory write-downs follows your policies and the applicable reporting standard, so confirm treatment with finance.
How do I handle a phase-in rather than a hard cut?
Use the weeks to consume figure to choose an effectivity date that lets the old component run out. The loss then falls close to the open purchase order cost only.
Does this cover finished goods?
Add the quantity of old component embedded in finished goods that cannot be reworked to the WIP field. Customer shipped units usually need a separate service decision.
What if the old part can return to the supplier?
Model it by raising the salvage percentage to the credit you expect, net of restocking fees. Treat it as an assumption until the supplier confirms in writing.
Netray can help extract stock, WIP and open order quantities for every affected part of a change, so the exposure is calculated from live data instead of spreadsheets.
Related Tools
SAP Engineering Change Affected Materials Impact Worksheet
A row by row worksheet of affected materials with quantities, cost and disposition that totals the financial impact of a change.
Costing & FinanceSAP Standard Cost Estimate BOM Rollup Calculator
Check a unit cost with scrap, setup per lot and overhead surcharges, the way a costing run (CK11N or CK40N) builds it.
SAPSAP VC Material Master Reduction Calculator
Estimate how many material master records, creation hours and maintenance hours you avoid by moving from a part per variant to a configurable material.
SAPSAP Variant Combination Explosion Calculator
Multiply characteristic values into a raw combination count, apply a dependency exclusion rate, and estimate the pairwise test floor.
More Engineering & PLM tools
See all- SAP Super BOM Design Worksheet
- SAP Engineering Change Number Checklist
- SAP Document Info Record Template
- SAP Change Master and Revision Level Log
- SAP Engineering Change Request (ECR) Template
- SAP BOM Usage and Item Category Reference
- Cloud MRP BOM Data Cleanup Worksheet
- Part Numbering Scheme Generator Template
- BOM Accuracy Calculator