ASME B16.5 Flange Pressure Class Rating Reference
Class 150, 300, 600 and so on are pressure classes, not pressure values. The allowable pressure depends on material group and temperature. This table gives the ambient values buyers and engineers look up most often.
| Material group | Typical material | Class | Rating at 38 C (psi) | Rating at 38 C (bar) | Shell test, 1.5 x (psi) |
|---|---|---|---|---|---|
1.1 | A105, A216 WCB | 150 | 285 | 19.6501 | 428 |
1.1 | A105, A216 WCB | 300 | 740 | 51.0212 | 1,110 |
1.1 | A105, A216 WCB | 600 | 1,480 | 102.0424 | 2,220 |
1.1 | A105, A216 WCB | 900 | 2,220 | 153.0637 | 3,330 |
1.1 | A105, A216 WCB | 1500 | 3,705 | 255.4509 | 5,558 |
1.1 | A105, A216 WCB | 2500 | 6,170 | 425.4067 | 9,255 |
2.1 | A182 F304, A351 CF8 | 150 | 275 | 18.9606 | 413 |
2.1 | A182 F304, A351 CF8 | 300 | 720 | 49.6423 | 1,080 |
2.1 | A182 F304, A351 CF8 | 600 | 1,440 | 99.2845 | 2,160 |
2.1 | A182 F304, A351 CF8 | 900 | 2,160 | 148.9268 | 3,240 |
2.1 | A182 F304, A351 CF8 | 1500 | 3,600 | 248.2114 | 5,400 |
2.1 | A182 F304, A351 CF8 | 2500 | 6,000 | 413.6856 | 9,000 |
Ambient (38 C / 100 F) values only, rounded as commonly published. Ratings fall as temperature rises, and each material group has its own curve. Always confirm against the current edition of ASME B16.5 before ordering or design. Test pressure shown is a simple 1.5 x multiple for orientation; the standard sets the actual hydrostatic test rules.
Flange attributes in your ERP
Optional: a short review of how class, facing and group are stored on your item master.
Optional. The tool and every export work without this. No spam.
How to use the table
Search by class or material grade, then read the ambient working pressure in psi and bar. The shell test column applies 1.5 times the rating, the multiple widely used for hydrostatic shell tests of flanged components. Use the table for early sizing, quote review and checking purchase order lines. For design, pull the full pressure-temperature table for your group and your actual design temperature.
- Find the material group from the forging or casting grade
- Read the ambient rating for a quick check
- Look up the derated value at design temperature in the standard
- Match flange class to the mating valve and gasket
What the standard covers
ASME B16.5 covers pipe flanges and flanged fittings from NPS 1/2 through NPS 24 in classes 150, 300, 400, 600, 900, 1500 and 2500. It defines ratings, dimensions, tolerances, marking, materials groups and testing. Larger sizes fall under ASME B16.47. Class 400 is rarely stocked and is omitted here.
Reading the numbers
A Class 300 carbon steel flange handles about 740 psi at ambient, but the same flange at 400 degrees C is rated far lower. A Class 150 flange is not a 150 psi flange. Mistaking class for pressure causes both over-spec and unsafe under-spec purchases, especially in sour or high temperature service where derating is steep.
Common mistakes and ERP notes
Frequent errors include mixing B16.5 with B16.47 series A or B for large sizes, mating a raised face flange to a flat face cast iron flange without precautions, and ordering by class without the facing. In your ERP item master, hold class, facing, material group and standard edition as separate attributes so buyers cannot substitute a lower rating by description.
Frequently Asked Questions
What pressure is a Class 150 flange rated for?
For Group 1.1 carbon steel at ambient temperature, about 285 psi (19.6 bar). The rating drops as temperature rises, so the class number is not a working pressure.
Why do stainless flanges show lower ratings?
Each material group has its own allowable stress curve. Group 2.1 austenitic stainless has a lower ambient rating than Group 1.1 carbon steel in the standard tables, for example 275 versus 285 psi in Class 150.
Do these ratings apply to flanges above NPS 24?
No. ASME B16.47 covers NPS 26 to 60 with its own ratings and series A and B. Check that standard for large diameter flanges.
Is this a substitute for the standard?
No. It is a quick reference for ambient values. Design and procurement decisions need the full pressure-temperature tables in the current edition of ASME B16.5.
Netray can help structure flange and valve attributes in your item master so purchasing catches class mismatches before they reach the floor. The table itself is free to use.
Related Tools
Steel Pipe Weight Calculator (Empty and Water Filled)
Calculate pipe weight per meter, total empty weight and water filled weight from outside diameter, wall thickness, length and density.
Maintenance & ReliabilityFlange Bolt Torque Calculator (Preload and Nut Factor)
Compute bolt stress area, target preload and tightening torque from bolt size, pitch, yield strength, percent of yield and nut factor.
Quality & InspectionValve Test Record Template (API 598 Shell and Seat)
Document valve shell, backseat and seat leakage tests with test pressures, hold times, medium and results, ready to print or attach to a data book.
Quality & InspectionHydrostatic Test Report Template for Vessels and Piping
Fill-in hydrostatic test certificate with test pressure, medium, gauge calibration, hold time, results and signatures, exportable to PDF or Word.
More Industry Templates tools
See all- API 6A Wellhead Temperature and Material Class Reference
- API 5L Line Pipe Grade Strength Reference
- API 526 Relief Valve Orifice Area Reference
- ASME B31.8 Pipeline Design Pressure Calculator
- NPSH Available Pump Calculator
- Oil and Gas Equipment Preservation and Shipping Checklist
- Distributor Free Freight Policy Template
- Job Shop Quote Cover Letter Template
- Monthly Operations Review Meeting Pack Template
Keep exploring
Free tools
- ASME B31.8 Pipeline Design Pressure CalculatorCalculate the design pressure of steel gas pipe from OD, wall thickness, SMYS, design factor, joint factor and temperature factor.
- Pressure Vessel Inspection Checklist (ASME VIII / API 510)A practical checklist covering nameplate and documentation, shell and heads, welds, nozzles, supports, internals and relief devices.
- ASME B31.3 Pipe Wall Thickness CalculatorPressure design thickness for straight pipe under internal pressure per the B31.3 equation, with corrosion allowance and mill tolerance rolled into the wall to order.
Guides
- ERP for Energy and Power Equipment ManufacturersERP for energy and power equipment manufacturers: ASME code compliance, long-lead castings, project-based costing, NERC and grid equipment traceability.
- How to Write IDO Extension Classes in SyteLineLearn how to write IDO extension classes in Infor SyteLine using C# and .NET to add custom business logic, validation rules, and data processing to your ERP system.
AI on your ERP
- AI ERP for Oil and Gas Equipment Manufacturers: Heat Traceability, MTRs and AftermarketPrivate AI on your ERP for wellhead, valve, BOP and pressure equipment manufacturers: heat traceability, MTRs, NDE records, API Q1 and aftermarket service.
- AI on Infor SyteLine for Oil and Gas Equipment ManufacturersAI on Infor SyteLine for oil and gas equipment: API Q1 and 6A traceability, MTRs, heat lots, ETO projects, and aftermarket parts. Private deployment.
Manufacturing hubs
- Manufacturing in Houston, Texas: oil and gas equipment, petrochemical, valves and pumpsHouston manufacturing guide: oil and gas equipment, petrochemical, valves and pumps. Standards, ecosystem, ERP and quoting problems shops face, and where private AI helps.
- Aerospace MRO and energy equipment manufacturing in TulsaTulsa aerospace maintenance, repair and overhaul plus energy equipment manufacturing: FAA Part 145, AS9100, API standards, ERP and private AI for shops.