Maintenance & ReliabilityFree calculatorPDF, Excel, Word exportOil and Gas Equipment

Flange Bolt Torque Calculator (Target Preload and Nut Factor)

The short form torque equation T = K x d x F converts a target bolt load into a wrench setting. This calculator derives the load from bolt size and strength, so you can work with any stud, not just a table value.

Your numbers

mm

M24 is about 7/8 in.

mm

M24 coarse pitch is 3 mm. Large studs often use 8 threads per inch, 3.175 mm.

MPa

ASTM A193 B7 up to 2.5 in is 105 ksi, about 720 MPa.

50 %

Many flange procedures use about 50 percent. Follow your own procedure.

pcs

Your results

Torque per bolt
609.1257
T = K x d x F, result in N.m with d in mm and F in kN.
Torque per bolt
449.268
In ft-lb.
Tensile stress area
352.5033
ISO metric stress area in mm2.
Target preload per bolt
126.9012
In kN.
Total preload, all bolts
1,522.8144
In kN, before elastic interaction and relaxation.
Bolt stress at target
360
In MPa.

Torque-preload scatter is large, commonly plus or minus 25 percent or more with friction uncertainty. Use the flange manufacturer or gasket supplier procedure for critical joints, and tension or hydraulic tools where required.

Free, optional. Reopen it on any device.
Save results:

Torque per bolt vs target percent of yield

Sweeps Target preload, percent of yield from 30 to 75, holding your other inputs fixed.

Torque values on your work orders

Optional: automate attaching bolting procedures to maintenance tasks.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the calculator

Enter nominal diameter and pitch to get the stress area. Enter the bolt yield strength and the percent of yield you want to reach, then choose the friction condition through the nut factor. The result is torque per bolt in N.m and ft-lb, plus the total clamp load across the joint. The sweep chart shows how sensitive torque is to the percent of yield chosen.

  • Use the lubricant actually applied to threads and nut faces
  • Use the same value across the whole pattern
  • Re-check with the gasket manufacturer's stress target
  • Torque in stages and in a star pattern

The equations

Tensile stress area for ISO metric threads is pi/4 x (d minus 0.9382 x P) squared. Preload is stress area times yield times the target fraction. Torque is nut factor K times nominal diameter times preload. Typical K ranges from about 0.12 for coated or heavily lubricated threads to about 0.2 or more for dry steel. A small change in K moves torque by the same proportion, which is why lubrication must be controlled.

Worked example

M24 x 3 B7 stud, yield 720 MPa, 50 percent target, K 0.2. Stress area is about 353 mm2. Preload is 353 x 720 x 0.5 divided by 1000, about 127 kN. Torque equals 0.2 x 24 x 127, about 610 N.m or 450 ft-lb. With moly paste at K 0.13 the same preload needs only about 400 N.m. Using the dry value on a lubricated stud would overload it badly.

Common mistakes and ERP notes

Frequent errors are using the dry torque with lubricated studs, skipping the star pattern, tightening in one pass, and ignoring that gasket type sets the required stress. Maintenance modules in SAP PM or Infor EAM can hold the torque value on a task list so technicians do not rely on memory.

Frequently Asked Questions

What is the nut factor K?

It is a lumped friction coefficient in T = K x d x F. Dry steel is around 0.2, lubricated threads around 0.13 to 0.16. Real values vary, so use test data for critical joints.

What percent of yield should I use for flange studs?

Many procedures target roughly 40 to 60 percent of yield, depending on gasket and joint design. Use your flange or gasket supplier's recommended bolt stress or your site procedure.

Is torque accurate for preload?

Not very. Friction scatter can leave actual preload off by 25 percent or more. For critical joints use hydraulic tensioning or controlled bolting with calibrated tools.

Does this work for inch bolts?

Yes. Convert diameter and pitch to mm and strength to MPa. For UNC 1 inch 8 threads per inch bolts, diameter is 25.4 mm and pitch 3.175 mm.

To get torque values and procedures onto your work orders automatically, Netray can discuss options with your ERP or maintenance team. The calculator is free to use.