Microsoft DynamicsFree referencePDF, Excel, Word exportMicrosoft Dynamics AX 2012All Microsoft Dynamics AX 2012 tools

Table Methods in AX 2012: X++ Reference for Overrides, Kernel Helpers and Conventions

This reference lists the table methods you override or call in Dynamics AX 2012 (RTM, R2, R3), split into kernel overrides, kernel helpers and the static find/exist conventions. Each row says when the kernel calls the method and the tip that avoids the most common bug or slowdown.

Download:
MethodKindWhen it runsReturnsTip
initValue
Override
When a new record is created in a form, or when you call it in code after declaring a buffer
void
Put field defaults here, not in insert, so the user sees them before saving
validateField
Override
When a field is changed in a form, before modifiedField
boolean
Use a switch on the field id; return checkFailed(...) to block the value
modifiedField
Override
After a field value is accepted in a form
void
Cascade dependent fields here (for example fill a name from an account)
validateFieldValue
Override
Field validation variant that receives field name and array index
boolean
Use for array fields; check your xRecord node to see if your kernel exposes it
modifiedFieldValue
Override
Modified-field variant that receives field name and array index
void
Pair with validateFieldValue when overriding array field behaviour
validateWrite
Override
On save from a form. Not called automatically by insert() or update() in code
boolean
Call it explicitly before insert or update in import code; never write to the database inside it
validateDelete
Override
On delete from a form. Not called automatically by delete() in code
boolean
Block deletes of records still in use; call it yourself in batch code
insert
Override
When code or a form inserts a record
void
super() performs the actual write; logic before super() can still change fields
update
Override
When code or a form updates a selected-for-update record
void
Compare this.field with this.orig().field to react only to real changes
delete
Override
When code or a form deletes a record
void
Delete actions run in super(); keep extra cleanup inside the same transaction
doInsert
Kernel helper
Only when you call it
void
Writes the record without calling the overridden insert(); use for data fixes only
doUpdate
Kernel helper
Only when you call it
void
Bypasses the overridden update(); business logic in update() is skipped
doDelete
Kernel helper
Only when you call it
void
Bypasses the overridden delete(); business logic in delete() is skipped, so use for data fixes only
aosValidateInsert
Override
On the AOS for every insert, from any client or code
boolean
Server-side guard that cannot be bypassed by client code
aosValidateUpdate
Override
On the AOS for every update
boolean
Keep it light; it runs for every row
aosValidateDelete
Override
On the AOS for every delete
boolean
Use for hard rules such as never delete posted records
aosValidateRead
Override
On the AOS when a record is read
boolean
Very hot path; avoid queries here
skipDataMethods
Kernel helper
Call before update_recordset, delete_from or insert_recordset
boolean
skipDataMethods(true) stops per-row calls to overridden update/delete/insert so set-based statements stay set-based
skipDatabaseLog
Kernel helper
Call before a set-based operation
boolean
Database logging on a table forces row-by-row; skip only if audit rules allow
skipEvents
Kernel helper
Call before a set-based operation
boolean
Alerts and events also force row-by-row processing
skipDeleteActions
Kernel helper
Call before delete_from
boolean
Skips delete actions; you then own referential cleanup
skipAosValidation
Kernel helper
Call before a write
boolean
Skips aosValidate methods; data migration only
orig
Kernel helper
Any time after a record is selected
Common (the record as last read)
Use in update() to detect changed fields
reread
Kernel helper
When you call it
void
Reloads the buffer from the database, for example after another process changed it
data
Kernel helper
When you call it
Common
Copies field values from another buffer of the same table: target.data(source)
clear
Kernel helper
When you call it
void
Empties the buffer before reuse in a loop
isFormDataSource
Kernel helper
When you call it
boolean
Branch logic that should run only when the record is bound to a form
caption
Override
When a form shows the record caption
str
Return the key and name so the form title is meaningful
postLoad
Override
After a record is fetched from the database
void
Runs for every fetched row; avoid database calls here
renamePrimaryKey
Kernel helper
From the Rename function or your code
void
Cascades a key change to related tables; slow on large data
toolTipRecord
Override
When the client shows a tooltip for the record
str
Keep it to a short description
find
Static convention
Called by your code: Table::find(key, forUpdate)
The table buffer
select firstonly with an optional forUpdate parameter; not a kernel method
exist
Static convention
Called by your code: Table::exist(key)
boolean
select firstonly RecId only, for speed
checkExist
Static convention
Called by your code before using a key
boolean
Wraps exist() and adds checkFailed with txtNotExist()
txtNotExist
Static convention
Called by checkExist
str (label text)
Return a label such as "Record %1 does not exist"

Find table methods in the AOT under Data Dictionary > Tables > your table > Methods. Right-click Methods > Override method lists the xRecord methods the kernel lets you override. The write() method belongs to the form data source, not the table. find, exist, checkExist and txtNotExist are Microsoft coding conventions you add as static methods, not kernel methods.

Planning to move AX 2012 code to D365?

Send us a list of your overridden table methods and we will flag which ones need rework as event handlers or extensions.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search for the method you are about to override or the behaviour you see. The Kind column tells you whether the kernel calls the method (Override), whether you call it yourself (Kernel helper), or whether it is a convention you write (Static convention). The When it runs column is the important one: validateWrite and validateDelete run on form saves, not on insert() or update() from code, which is why import jobs so often write invalid data. Export the table and add your own team rules as extra rows.

  • Defaults: initValue
  • Field rules: validateField then modifiedField
  • Record rules: validateWrite, validateDelete
  • Hard server rules: aosValidateInsert, aosValidateUpdate, aosValidateDelete

Where this lives in AX 2012

Open the AOT (Ctrl+D), expand Data Dictionary > Tables, pick the table and expand Methods. Right-click Methods > Override method to add an xRecord override; right-click Methods > New method for static find and exist. The X++ editor opens the method; super() calls the kernel behaviour. In AX 2012 the code is compiled to p-code and, for server code, also to CIL, so run a full CIL compile after changes that batch or services use.

Worked example: find and exist on a custom table

For a table XyzMachineTable with unique index on MachineId, write: static XyzMachineTable find(XyzMachineId _id, boolean _forUpdate = false) { XyzMachineTable rec; rec.selectForUpdate(_forUpdate); select firstonly rec where rec.MachineId == _id; return rec; } and static boolean exist(XyzMachineId _id) { return _id && (select firstonly RecId from XyzMachineTable where XyzMachineTable.MachineId == _id).RecId != 0; }. Add checkExist that calls exist and returns checkFailed(strFmt(XyzMachineTable::txtNotExist(), _id)) when missing.

Gotchas: set-based operations

insert_recordset, update_recordset and delete_from fall back to row-by-row processing when the table overrides insert, update or delete, has database logging or alerts enabled, or has delete actions (for delete_from). Call skipDataMethods(true), skipDatabaseLog(true), skipEvents(true) or skipDeleteActions(true) on the buffer only when skipping that logic is correct. Remember that doInsert, doUpdate and doDelete bypass your overrides entirely, and that validateWrite is never called by the kernel during code inserts.

Frequently Asked Questions

What are the main table methods in AX 2012?

The common overrides are initValue, validateField, modifiedField, validateWrite, validateDelete, insert, update, delete and the aosValidate methods. Kernel helpers include doInsert, doUpdate, doDelete, orig, reread, data, clear and the skip methods. find and exist are static conventions you write yourself.

Is validateWrite called when I call insert() in X++?

No. validateWrite runs when a form saves a record. In code you must call it yourself: if (rec.validateWrite()) rec.insert(); The same applies to validateDelete before delete(). aosValidateInsert and the other aosValidate methods do run on the server for every write.

What is the difference between insert and doInsert in AX 2012?

insert() calls your overridden insert method, which normally calls super() to write the row. doInsert() writes the row directly without calling your override, so any logic in insert() is skipped. Use doInsert only for controlled data fixes where that logic must not run.

Why is my update_recordset slow?

It is probably running row by row. AX falls back when the table overrides update(), has database logging or alerts, or other per-row logic. Call skipDataMethods(true) and the other skip methods on the buffer before the statement if bypassing that logic is acceptable, then test the row count.

If you want developers and support staff to ask questions about your AX 2012 data and code base in plain English on your own servers, we can set up that private AI layer.

Get Microsoft Dynamics AX 2012 alerts

Support and maintenance deadlines, release changes that affect Microsoft Dynamics AX 2012 sites, and new free Microsoft Dynamics AX 2012 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Microsoft Dynamics AX 2012: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Microsoft Dynamics AX 2012? Start with the Microsoft Dynamics AX 2012 guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations

Software