D365 Finance and Supply Chain Production Order Status Reference
Every production order in Dynamics 365 Finance and Supply Chain moves through a defined set of statuses, and each status unlocks different actions and postings. This reference shows the sequence, what each step does and the checks that prevent rework.
| Type | Status or action | Enum value | What it means | Check before moving on |
|---|---|---|---|---|
Status | Created | 0 | Order exists with item, quantity, BOM and route chosen. No cost estimate, no scheduling, no material reserved by default. | Item, BOM version, route version and quantity are correct. |
Status | Estimated | 1 | Cost estimation has run and calculated cost is stored on the order. | Costing sheet and cost group setup, price and cost records for components. |
Status | Scheduled | 2 | Order has been scheduled against resource calendars (job or operations scheduling). | Resource capacity, calendars, scheduling direction and dates. |
Status | Released | 3 | Order is released to the shop floor. Picking list and route card journals can be created. | Material availability, warehouse picking, route cards and job cards are ready. |
Status | Started | 4 | Production has started. Material is consumed and hours are reported against the order. | Journals are posted correctly. Reservations on components are as expected. |
Status | Reported as finished | 5 | Finished goods have been reported into inventory. Costs can still be posted. | Quantity good and scrap, put away, outstanding journals, co-products and by-products. |
Status | Ended | 6 | Order is closed. Variances are calculated and no further postings are allowed. | All journals posted, WIP is cleared. Ending is not reversible in the normal way. |
Action | Estimation | Runs cost calculation and moves the order to Estimated. | Run for the right calculation date and costing version. | |
Action | Schedule | Runs job or operations scheduling and moves the order to Scheduled. | Use finite capacity only where resources are truly constrained. | |
Action | Release | Releases the order to production and creates route and picking documents based on parameters. | Autoreport and autoupdate parameters, as well as flushing principles. | |
Action | Start | Marks the order as started and can trigger material consumption based on flushing principle. | Reservation and flushing principle on each BOM line. | |
Action | Report as finished | Posts the finished quantity to inventory, optionally with a good and bad quantity split. | Whether the end-of-run flag marks the order complete. | |
Action | End | Closes the order, calculates variances and settles costs. | Open picking lists and route card journals. Cost settlement impact. | |
Action | Delete | Removes an order that is still in a low status. | Only possible while no postings or reservations block it. | |
Related | Production status vs. scheduling status | Order status and scheduling status are separate fields. An order can be Released and still need rescheduling. | Use the scheduling status when planning dispatching. | |
Related | Planned production order | Output of master planning. It becomes a production order when firmed. | Firmed planned orders create production orders with BOM and route versions. |
Enum values shown follow the standard ProdStatus ordering. Labels and the exact set of parameters differ by version, so confirm in Production control > Production orders and the Production control parameters.
Production order questions answered from D365
Ask which orders are stuck in Started or ready to end, from your own data. Optional follow-up, the reference is free.
Optional. The tool and every export work without this. No spam.
How to use the table
Filter by Status to see the lifecycle and by Action to see the process buttons that move an order forward. The right-hand column is a quick pre-flight check. Consultants use it when training planners, writing test scripts for UAT and designing the status handling of an integration that creates or updates orders.
- Statuses move forward in order: Created, Estimated, Scheduled, Released, Started, Reported as finished, Ended
- Actions are the buttons that cause the transition
- Scheduling status is tracked separately from production status
- Ending is the point of no return for postings
What each stage is for
Created holds the plan. Estimated adds a calculated cost. Scheduled adds dates against resource capacity. Released makes the order visible for picking and for the shop floor and can generate documents. Started and Reported as finished represent execution, where material and hours are consumed and goods are received. Ended finalizes cost and variances. Skipping estimation or scheduling is allowed in many setups, but the parameters decide what is automatic.
Integration and MES considerations
When an MES or integration reports progress, decide which system owns each transition. A common pattern is that D365 releases orders and the MES reports route card and finished quantities through journals or the production order API. Define what happens when a status change is rejected, such as ending an order with unposted journals, and log it. Avoid forcing statuses by direct data edits.
Common mistakes
Typical problems include ending orders too early so late consumption cannot post, leaving orders Started for months and polluting WIP, relying on autoupdate parameters nobody documented, and mixing up production status with scheduling status when building reports. Standardize who may end orders and when.
Frequently Asked Questions
What are the production order statuses in D365?
The standard sequence is Created, Estimated, Scheduled, Released, Started, Reported as finished and Ended. Each is reached through a process action. Depending on parameters, some steps can run automatically when you release or start the order.
Can I reverse an Ended production order?
In general, no. Ending calculates variances and blocks further postings. If you suspect an error before ending, correct it first. Some versions offer controlled undo options, so check your version and test the process in a sandbox rather than editing data directly.
What is the difference between Started and Released?
Released makes the order available to the floor and can create picking lists and route cards. Started means execution has begun, and depending on flushing principles material and hours may be consumed. Start is where inventory and WIP postings typically begin.
Is scheduling status the same as production status?
No. Scheduling status tracks whether dates are scheduled or need rescheduling, while production status tracks the lifecycle. An order can be Released with a scheduling status that signals it needs another scheduling run after a change.
If you need production order status questions answered from live D365 data in plain language, with the underlying query visible, we can explore that with your team.
Related Tools
D365 F&O Manufacturing Data Entities Reference
A searchable list of the data entities consultants reach for first when loading or integrating manufacturing data in D365 F&O, with the area, purpose and import notes.
Microsoft DynamicsD365 Master Planning Setup Checklist
A step-by-step checklist for configuring and validating master planning in D365 Supply Chain Management, from parameters to a trustworthy planning run.
Microsoft DynamicsD365 Batch Job Checklist
A practical checklist to design, review and monitor batch jobs in D365 F&O, covering batch groups, recurrence, alerts, cleanup jobs and go-live checks.
Microsoft DynamicsD365 One Version Update Test Checklist
A repeatable checklist for testing each Dynamics 365 service update in a sandbox before production, including regression, extensions, integrations and rollback readiness.
More Microsoft Dynamics tools
See all- D365 F&O OData URL Builder
- D365 Data Management Import Worksheet Template
- D365 Security Role Design Worksheet
- D365 Finance and Supply Chain Functional Design Document Template
- D365 Finance and Supply Chain Fit-Gap Analysis Worksheet
- D365 Finance and Supply Chain Data Migration Mapping Worksheet
- D365 Finance and Supply Chain Cutover Plan Template
- D365 Finance and Supply Chain UAT Test Case Worksheet
- D365 Finance and Supply Chain Integration Interface Register
Keep exploring
Free tools
- D365 F&O Order and Inventory Transaction Status ReferenceSearchable list of status and document status values for sales, purchase and transfer orders and inventory transactions in D365 F&O.
- D365 Production Order Cost Variance CalculatorBreak a production order variance into material price, material usage, labor rate and labor efficiency so you can see the real driver.
- D365 F&O Inventory Dimensions ReferenceLookup table of the product, storage and tracking inventory dimensions in D365 F&O and the dimension group flags that control them.
ERP fixes and how-tos
- Dynamics 365 Supply Chain Management API: OData, Custom Services and Data PackagesD365 Supply Chain / F&O APIs explained: OData data entities, custom services, the data management package API, Entra ID authentication and when to use each.
- Dynamics 365 Supply Chain Wave Planning and Inventory JournalsHow wave planning and inventory journals work in Dynamics 365 Supply Chain Management: wave templates, wave steps, work templates, journal names and posting.
- Dynamics 365 Supply Chain Warehouse Only Mode: What It Is and Its LimitsWhat warehouse management only mode is in Dynamics 365 Supply Chain Management, how to enable it, how orders arrive as shipment orders, and its limits.
AI on your ERP
- AI for Dynamics 365 Finance and Supply Chain beyond CopilotAI for D365 Finance and Supply Chain beyond Microsoft Copilot: private LLM grounded on data entities and OData, on-prem-capable via Local Business Data.
- AI for Dynamics 365 Production Control: Orders, Planning and SchedulingAI for Dynamics 365 F&SCM production control: production orders, BOM and route data, master planning and scheduling, explained in plain English on private servers.
Integrations
- How to add an AI chatbot to Dynamics 365 Finance and Supply ChainAdd an AI chatbot to Dynamics 365 Finance and Supply Chain: internal assistant or supplier and customer portal, grounded in ERP data, with on-prem model options.
- How to connect Microsoft Teams to Dynamics 365 Finance and Supply ChainConnect Dynamics 365 Finance and Supply Chain to Microsoft Teams: business events, adaptive cards, Power Automate approvals and Entra ID auth, with limits.
Software
- Microsoft Dynamics 365 Finance and Supply ChainDynamics 365 Finance and Supply Chain Management explained for manufacturers: modules, data entities, OData, deployment, strengths, limits and alternatives.
- Dynamics 365 Field ServiceDynamics 365 Field Service handles work orders, resource scheduling and mobile technicians on Microsoft Dataverse. Modules, integrations and alternatives.