Burn-In Arrhenius Acceleration Factor and FIT Rate Calculator
Burn-in and HTOL turn a few weeks at high temperature into years of equivalent field life. This calculator applies the Arrhenius model so you can see the acceleration factor, the equivalent use time and the FIT from your results.
Your numbers
Depends on the failure mechanism. 0.7 eV is a common default for generic assessments; use your qualified value if you have it.
Junction, not oven ambient. Include self-heating.
Your results
Arrhenius acceleration covers thermally activated mechanisms only. Voltage, humidity and thermal cycling need other models. A point estimate is not a reliability claim: use a chi-square upper confidence bound and your qualification standard (for example JEDEC JESD47 and JESD85) for customer FIT reporting.
Acceleration factor vs activation energy
Sweeps Activation energy from 0.3 to 1.2, holding your other inputs fixed.
Reliability data tied to lots and ERP records
Optional: ask how to link burn-in results to lot genealogy and supplier data in your own systems.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Enter the activation energy for the mechanism you are screening, the junction temperature in use and under stress, the device count, stress hours and observed failures. The tool returns the acceleration factor, total equivalent device hours, equivalent years per device and a point-estimate FIT. Move the activation energy slider to see how sensitive the result is: a small change in Ea makes a large change in acceleration, which is the main uncertainty in any burn-in claim.
- Use junction temperature, including self-heating from power.
- Use the Ea your qualification data supports for the mechanism.
- Do not combine mechanisms with different Ea in one run.
The Arrhenius model
The acceleration factor is AF = exp[(Ea/k) x (1/Tuse minus 1/Tstress)], where k is Boltzmann's constant, 8.617 times 10 to the minus 5 electron volts per kelvin, and temperatures are in kelvin. FIT is failures per 10 to the 9 device hours, so FIT = failures / (devices x hours x AF) x 10 to the 9. For a zero-failure result, the point estimate is zero, so use a chi-square-based upper bound at your chosen confidence level for any customer commitment.
Worked example
With Ea of 0.7 eV, 55 C use and 125 C stress, the acceleration factor is about 78. A 1000 hour stress on 231 devices gives roughly 18 million equivalent device hours, or about 8.9 years of use per device. One failure would give a point FIT of about 55. With zero failures, the 60% confidence upper bound is commonly computed with a chi-square of 1.83 for two degrees of freedom, but check the factor required by your standard.
Common mistakes
Using oven ambient instead of junction temperature will understate the stress. Using the same Ea for every failure type overstates acceleration for low-Ea mechanisms. Reporting zero FIT from a zero-failure test is another error. Finally, check that the hours you enter are actual powered stress hours, not the calendar duration including loading, cooldown and readpoint downtime.
Frequently Asked Questions
Which activation energy should I use?
Use the value that your qualification data or the relevant standard supports for the specific failure mechanism. Many generic assessments use 0.7 eV, but oxide, metallization and contamination mechanisms have different values, so a single number is a simplification.
Why is junction temperature required?
Failure mechanisms respond to the temperature at the die, not the oven air. At high power the junction can be many degrees above ambient. Using ambient understates stress and overstates the time the test represents.
What is FIT?
FIT means failures in time: one failure per billion device hours. A part with 50 FIT is expected to fail at a rate of 50 per billion hours of operation under the stated conditions.
Can I use this for thermal cycling or humidity tests?
No. Those use different acceleration models, such as Coffin-Manson for cycling and Peck for temperature, humidity and bias. This tool covers Arrhenius temperature acceleration only.
If your reliability results live in spreadsheets and test systems, Netray can help build a private reporting layer that links lots, stress conditions and FIT calculations to your ERP and quality records.
Related Tools
OSAT Final Test Cost Per Good Unit Calculator
Find test cost per tested unit and per good unit from tester hourly cost, test and index time, parallel sites and yield, with a multi-site sweep.
Quality & InspectionSemiconductor OCAP Out-of-Control Action Plan Template
Fill-in OCAP record for an SPC out-of-control event: rule violated, tool and lot hold, containment, checks, disposition and sign-off.
Electronics ManufacturingDeal-Grove Thermal Oxide Thickness Calculator
Calculate silicon dioxide thickness after dry or wet thermal oxidation using the Deal-Grove linear-parabolic model, with a growth versus time chart.
Electronics ManufacturingSemiconductor Cycle Time X-Factor Queue Calculator
Estimate queue wait, X-factor and total flow time per layer from tool utilization and variability. Includes a utilization sweep chart.
More Electronics Manufacturing tools
See all- Gross Die Per Wafer Calculator
- Die Yield Calculator (Poisson, Murphy, Negative Binomial)
- Cleanroom FFU Air Changes Per Hour Calculator
- Lithography Resolution and Depth of Focus Calculator
- Etch Rate Uniformity Log Worksheet
- Semiconductor Wafer Size and Thickness Reference
- Semiconductor Package Types Reference
- ISO 14644-1 Cleanroom Particle Limits Reference
- Semiconductor Process Tool Qualification Checklist
Keep exploring
Free tools
- HTOL Burn-In FIT and Acceleration Factor CalculatorCompute the Arrhenius acceleration factor, equivalent field hours and the upper-bound FIT rate for a zero-failure high temperature operating life test.
- Accelerated Stability Arrhenius Shelf Life CalculatorEstimate the acceleration factor between storage and stress temperatures and convert accelerated months into equivalent real-time months.
- Laser Diode Burn-In Log WorksheetEditable burn-in record that computes power degradation percent per unit and flags devices drifting past your limit.