Electronics ManufacturingFree referencePDF, Excel, Word exportSemiconductors

Semiconductor Package Types Reference (QFN, BGA, SOIC, WLCSP and more)

IC package names are a maze of abbreviations. This reference decodes the common families, from DIP and SOIC to QFN, BGA, WLCSP and flip chip, and shows terminal style, mounting method and typical applications in one searchable table.

Download:
AbbreviationFull nameTerminal styleMountingNotes
DIP
Dual in-line package
Two rows of leads on opposite sides
Through-hole
Common in prototyping, legacy and socketed parts
SOP / SOIC
Small outline (integrated circuit) package
Gull-wing leads on two sides
Surface mount
Widely used for analog, logic and memory
SSOP
Shrink small outline package
Gull-wing leads on two sides, finer pitch
Surface mount
Smaller pitch than SOIC
TSSOP
Thin shrink small outline package
Gull-wing leads on two sides, thin body
Surface mount
Thin body for space constrained boards
TSOP
Thin small outline package
Leads on the two short or long sides
Surface mount
Used for flash and memory devices
SOT
Small outline transistor
Three to six gull-wing leads
Surface mount
Small discretes, regulators, small ICs (for example SOT-23)
QFP
Quad flat package
Gull-wing leads on four sides
Surface mount
Microcontrollers, ASICs; includes LQFP and TQFP variants
PLCC
Plastic leaded chip carrier
J-leads on four sides
Surface mount or socket
Older memory and logic devices
QFN
Quad flat no-lead
Pads on the underside edges
Surface mount
Often has an exposed thermal pad; also called MLF or MLP
DFN
Dual flat no-lead
Pads on two sides of the underside
Surface mount
Small power and analog parts
LGA
Land grid array
Flat pads in a grid on the underside
Surface mount or socket
Used for processors and modules
BGA
Ball grid array
Solder balls in a grid on the underside
Surface mount reflow
High pin count processors, memory, FPGAs
FBGA / CSP
Fine-pitch BGA / chip scale package
Fine-pitch solder balls
Surface mount reflow
Package close to die size; common for memory and mobile
WLCSP
Wafer level chip scale package
Solder balls or bumps formed at wafer level
Surface mount reflow
Package is essentially the die size; sensitive to board stress
FC-BGA
Flip chip ball grid array
Balls on the substrate, bumps on the die
Surface mount reflow
Die connected face down with bumps instead of wire bonds
TO-220 / TO-247
Transistor outline power packages
Three leads with a metal tab
Through-hole
Power transistors and regulators with a heat sink tab
DPAK / D2PAK
Power surface mount packages
Leads plus a large thermal tab
Surface mount
Power MOSFETs and regulators
SiP
System in package
Varies by design
Typically surface mount
Multiple die and passives in a single package

Package names and dimensions are defined by JEDEC and manufacturer drawings, and variants differ between vendors. Treat this table as an orientation guide, and always use the manufacturer package outline drawing for land patterns and thermal data.

Item master package field clean-up

Optional: a short review of how package and component attributes are stored in your ERP.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the reference

Search by abbreviation or by a keyword such as thermal pad or reflow. Use it when reading a BOM, a datasheet or an OSAT quotation where only the short code appears. Export the filtered list to Excel to attach to a component engineering note or an ERP item master clean-up.

  • Search the abbreviation exactly as printed on the BOM
  • Check mounting to see whether the part is through-hole or reflow
  • Use notes to spot thermal or board-stress considerations

Leaded versus no-lead versus array

Leaded packages such as SOIC and QFP have visible leads that can be inspected after soldering. No-lead packages such as QFN and DFN have pads under the body, which saves space and improves thermal performance but needs X-ray or careful AOI. Array packages such as BGA and LGA put terminals in a grid for high pin counts and are inspected mainly by X-ray.

Wire bond versus flip chip

Inside the package, the die is connected either by fine wires from die pads to the lead frame or substrate, or by bumps on a face-down die. Wire bonding is mature and flexible. Flip chip gives shorter paths, better electrical performance and higher I/O density, at higher substrate cost. The package family name does not always tell you which interconnect is used, so check the datasheet or the OSAT process flow.

Common mistakes

Do not assume packages with the same abbreviation share a footprint across vendors, since body size, pitch and pad size vary. Do not mix up QFN pad pullback or exposed pad requirements when creating a land pattern. In an ERP item master, record the exact JEDEC outline or manufacturer package code, not just the family.

Frequently Asked Questions

What is the difference between QFN and BGA?

A QFN has flat pads around the underside edges of the body, while a BGA has an array of solder balls across the underside. BGAs support far higher pin counts, and QFNs are simpler and cheaper for lower pin counts.

What does WLCSP mean?

Wafer level chip scale package. The package terminals are built on the wafer before dicing, so the finished package is about the same size as the die. It is compact but more sensitive to board level stress.

Is MLF the same as QFN?

MLF (micro lead frame) and MLP are vendor names for packages that are essentially QFN style no-lead packages. Check the outline drawing for the exact dimensions.

Where do I find the official package dimensions?

Use the manufacturer package outline drawing and the relevant JEDEC outline reference. Those documents define body size, pitch, pad geometry and tolerances.

If your item master has inconsistent package fields, Netray can help clean and query them across ERP and PLM data, on your own servers.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Manufacturing hubs

Software