Lithography Resolution and Depth of Focus Calculator (Rayleigh)
Resolution and depth of focus pull in opposite directions in lithography. This calculator applies the Rayleigh equations so you can see the trade-off across wavelength, NA and process factor.
Your numbers
ArF immersion scanners reach about 1.35. Dry ArF is below 1. Current EUV scanners are 0.33 or 0.55.
Lower is harder. The single-exposure theoretical limit is 0.25.
Often between 0.5 and 1 depending on the definition of acceptable focus range.
Your results
The Rayleigh equations are first-order scaling rules. Real resolution depends on resist, illumination, mask type, OPC and the specific scanner. Use your lithography group's process window data for decisions.
Half-pitch and depth of focus vs NA
Sweeps Numerical aperture (NA) from 0.3 to 1.4, holding your other inputs fixed.
Process documents searchable on your own servers
Optional: ask how to search recipes, specs and change records privately.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Pick the exposure wavelength from the standard sources, then enter the numerical aperture, the process factor k1 and the depth of focus factor k2. The tool returns the minimum half-pitch, the minimum pitch, the depth of focus and the margin of your k1 above the theoretical single-exposure limit of 0.25. The chart sweeps NA and shows how resolution improves while depth of focus collapses, which is why higher NA tools need flatter wafers and tighter focus control.
- Use a realistic k1 from your resist and illumination setup.
- Pitch is twice the half-pitch for a line-space pattern.
- Check k1 against 0.25 before planning a single exposure.
The Rayleigh equations
Resolution (the smallest half-pitch) is CD = k1 x lambda / NA. Depth of focus is DOF = k2 x lambda / NA squared. NA appears squared in the denominator of DOF, so doubling NA cuts DOF to a quarter while only halving CD. Wavelength reduction helps both: this is why the industry moved from i-line to KrF, ArF, immersion and then EUV. A k1 below 0.25 cannot be reached with a single exposure, and multiple patterning is needed.
Worked example
For ArF immersion at 193 nm, NA 1.35 and k1 of 0.32, the half-pitch is about 45.7 nm, and the pitch is about 91 nm. With k2 of 0.8, the depth of focus is 193 times 0.8 divided by 1.35 squared, which is about 85 nm. For a target pitch of 80 nm the required k1 would be 0.28 for half-pitch 40 nm, which is close to the 0.25 limit, so multiple patterning or EUV would be considered.
Common mistakes
A frequent mistake is quoting NA for an immersion system as if it were a dry system, or mixing pitch and half-pitch. Another is treating k1 as a constant of the scanner when it is a function of the whole process, including resist, mask, illumination and OPC. Finally, the DOF equation depends on how the user defines acceptable focus, so compare k2 values only when the definitions are the same.
Frequently Asked Questions
What is k1 in lithography?
k1 is a dimensionless factor that captures how aggressively the process pushes resolution. It includes resist performance, illumination, mask enhancement and OPC. Lower k1 means a harder process, with 0.25 as the physical limit for single exposure.
Why does depth of focus shrink as NA grows?
Depth of focus scales as 1 over NA squared, while resolution scales as 1 over NA. A higher NA captures steeper diffraction angles, which sharpens features but makes the image sensitive to small changes in wafer height.
Is half-pitch the same as critical dimension?
Not always. For equal line and space the half-pitch equals the line width, so the terms are used interchangeably in Rayleigh. For isolated lines or contacts, the printed CD can differ from the half-pitch.
Does this cover EUV?
Yes for first-order scaling. Choose 13.5 nm and the NA of your tool, for example 0.33 or 0.55. EUV has additional effects, such as stochastics and mask 3D effects, that the Rayleigh equations do not capture.
If your process recipes, masks and equipment records are spread across systems, Netray can help build a private search layer over those documents, running on your own hardware.
Related Tools
Deal-Grove Thermal Oxide Thickness Calculator
Calculate silicon dioxide thickness after dry or wet thermal oxidation using the Deal-Grove linear-parabolic model, with a growth versus time chart.
Electronics ManufacturingEtch Rate Uniformity Log Worksheet
Editable log of etch monitor wafers with automatic within-wafer non-uniformity and etch depth per row, plus average and worst-case totals.
Quality & InspectionSemiconductor OCAP Out-of-Control Action Plan Template
Fill-in OCAP record for an SPC out-of-control event: rule violated, tool and lot hold, containment, checks, disposition and sign-off.
Electronics ManufacturingCleanroom FFU Air Changes Per Hour Calculator
Compute air changes per hour, ceiling coverage and mean downflow velocity for a cleanroom served by fan filter units, with a sweep by FFU count.
More Electronics Manufacturing tools
See all- Gross Die Per Wafer Calculator
- Die Yield Calculator (Poisson, Murphy, Negative Binomial)
- Semiconductor Cycle Time X-Factor Queue Calculator
- Burn-In Arrhenius Acceleration Factor and FIT Calculator
- Semiconductor Wafer Size and Thickness Reference
- Semiconductor Package Types Reference
- ISO 14644-1 Cleanroom Particle Limits Reference
- Semiconductor Process Tool Qualification Checklist
- Wafer Probe Throughput and Test Cell Capacity Calculator
Keep exploring
Free tools
- Focused Laser Spot Size and Depth of Focus CalculatorEstimate the focused spot diameter and depth of focus of a laser through a lens, and compare against the diffraction-limited Airy disk.
- Gaussian Beam Spot Size and Rayleigh Range Python GeneratorFill in laser wavelength, M-squared, focal length and input beam diameter to generate a ready-to-run Python script for focused spot size and depth of focus.
- Gauge Resolution 10 to 1 Rule CalculatorEnter the part tolerance and your gauge resolution to see the ratio achieved and the finest resolution each rule of thumb requires.
Guides
- ERP Duplicate Data Identification and ResolutionIdentify and resolve duplicate records in your ERP with fuzzy matching, survivorship rules, and merge strategies. Reduce duplicates by 90% before migration.
- SyteLine Upgrade Error Resolution: Complete GuideResolve common SyteLine upgrade errors including schema migration failures, customization conflicts, and post-upgrade validation issues step by step.
- SyteLine Printing Issues: Diagnosis and ResolutionResolve SyteLine printing failures including print job stuck in queue, barcode label errors, and network printer configuration for CloudSuite Industrial.