Carburizing Case Depth and Time Calculator
Carburizing depth grows with the square root of time and rises quickly with temperature. This calculator uses that diffusion relationship to estimate case depth for a cycle or the hours needed to reach a depth target.
Your numbers
About 0.025 inch per root hour is the commonly quoted figure for 925 deg C gas carburizing; calibrate with your furnace data.
Typically about 130 to 150 for carbon in austenite.
Your results
Diffusion models give an estimate only. Actual depth depends on carbon potential, steel grade, load density, quench and the hardness criterion used. Confirm with test coupons and cross-section hardness traverses.
Case depth vs time at temperature
Sweeps Time at carburizing temperature from 1 to 24, holding your other inputs fixed.
Capture furnace recipes in your ERP
Optional: a short review of how heat treat recipes and results could attach to work orders.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Set the carburizing temperature and the hours at temperature. The tool estimates the depth. To plan a cycle, enter a target effective case depth and read the hours needed. Adjust the reference constant after comparing the estimate with your coupon results, so the model matches your furnace.
- Count only time at carburizing temperature, not heat-up.
- Keep carbon potential in the range your procedure sets.
- Use effective case depth to the hardness your drawing names.
The method behind it
Carbon diffusion follows depth proportional to the square root of D x t, and the diffusion coefficient D follows an Arrhenius law with temperature. The tool uses a reference of about 0.635 mm per root hour at 925 deg C, the familiar 0.025 inch figure, and scales it with the activation energy. At 925 deg C for 8 hours it gives about 1.8 mm. Higher temperature shortens time but increases grain growth and distortion risk.
Reading the result and common mistakes
Because depth rises with the square root of time, doubling the cycle adds only about 41 percent more depth, which the chart makes clear. Going hotter often saves more than extending the cycle, but only if the steel and fixtures tolerate it. Carbon potential at the surface also limits what is possible.
- Assuming depth is linear with time.
- Mixing total case depth and effective case depth.
- Ignoring the diffusion step after boost cycles.
- Using one constant for all steel grades.
Frequently Asked Questions
Why does case depth go with the square root of time?
Diffusion is a gradient-driven process, so the penetration distance scales with the square root of the diffusion coefficient times time. Doubling the time increases depth by about 41 percent rather than doubling it.
What is effective case depth?
It is the depth from the surface to a specified hardness, commonly 50 HRC or 550 HV, though specifications vary. Total case depth extends further, to where the core carbon level is reached. Always match the definition on the drawing.
How accurate is this estimate?
Treat it as plus or minus 15 to 25 percent. Carbon potential, steel alloy, load geometry and quench all matter. After a few coupons you can tune the reference constant to your furnace and the model becomes more useful.
Is it valid for vacuum carburizing?
The diffusion relationship is similar, but vacuum low-pressure carburizing uses boost and diffuse pulses that change the surface carbon history. Use the supplier's simulation for vacuum recipes and use this tool for rough planning only.
If your heat treat shop schedules loads and certifications in an ERP or MES, we can discuss capturing furnace recipes next to the work order. The calculator itself needs no signup.
Related Tools
Tempering Hollomon-Jaffe Parameter Calculator
Compute the Hollomon-Jaffe tempering parameter and the equivalent time at another temperature, or the temperature that gives the same softening in a target time.
Industry TemplatesFoundry Heat and Pour Log Template
Fill in a one-page heat record covering alloy, furnace, temperatures, chemistry checks, treatment, molds poured and approvals, then export it.
Industry TemplatesForging Billet Weight and Flash Allowance Calculator
Work out billet weight, bar cut length and material utilization from finished forging volume, flash percentage, scale loss and shear loss.
Industry TemplatesUpset Forging Stock Length, Strain and Final Diameter Calculator
Enter bar diameter, stock length and target height to get final diameter, upset ratio, true strain and whether the stock exceeds the 3D buckling rule.
More Discrete Manufacturing tools
See all- OEE Calculator (Overall Equipment Effectiveness)
- Scrap Rate Cost Calculator
- Takt Time Calculator
- Cycle Time & Capacity Calculator
- Inventory Carrying Cost Calculator
- Economic Order Quantity (EOQ) Calculator
- MRP Nervousness Assessment
- Production Scheduling Maturity Assessment
- Shop Floor Digitization Scorecard
Keep exploring
Free tools
- Foundry and Forge Process Control Maturity AssessmentScore how well your melt, pour, forging, heat treat, traceability and data practices are controlled, and get practical next steps.
- Casting and Forging Quote Review ChecklistReview a casting or forging quote against the items that usually cause surprises: drawing revision, weights, tooling terms, material surcharge, inspection scope and delivery.
- Tempering Hollomon-Jaffe Parameter CalculatorCompute the Hollomon-Jaffe tempering parameter and the equivalent time at another temperature, or the temperature that gives the same softening in a target time.
Guides
- Heat Treat Distortion and Scrap in Gear Manufacturing: How to Reduce ItReduce heat treat distortion and scrap on carburized gears: steel, quench, fixturing, grind stock and the data gear makers should track by lot and furnace load.
- Forging Quote and Estimating Software for US Forge ShopsHow forging shops quote faster: input weight, flash, die cost, press time, heat treat and testing in one estimate, and where AI drafts the first pass.
- Forging Die Life Tracking and Scrap Analysis With Your ERP DataHow forge shops track pieces per die set, repair cycles and scrap causes, and use ERP history and private AI to find which dies and parts cost the most.
AI on your ERP
- Building the ROI Business Case for ERP AI in ManufacturingHow to build a defensible ERP AI business case: benefit mechanisms instead of vague productivity claims, cost structure, payback period, and sensitivity analysis.
- Dynamics 365 Customer Service AI: Case Agents and Copilot Grounded in Manufacturing DataAI in Dynamics 365 Customer Service: Copilot, case management and knowledge agents, and how manufacturers ground answers in orders, serials and warranty data.
Manufacturing hubs
- Metal Treating Institute and commercial heat treating: standards and ERP realitiesMetal Treating Institute and commercial heat treating: furnaces, Nadcap, AMS 2750 and CQI-9 records, plus the ERP, quoting and private AI issues heat treaters face.
- Forging Industry Association (FIA): forging processes, standards and ERP realitiesForging Industry Association (FIA): open die, closed die and ring rolling shops, standards, and the ERP, traceability, costing and private AI issues forgers face.