Foundry Heat and Pour Log Template
A heat and pour log is the foundry's core traceability record. It links a heat of metal to its chemistry, temperatures, treatment and the molds it filled, so a defect or customer query can be traced to its source.
Fill in
Foundry Heat and Pour Log Template
Heat and Pour Record
Foundry: Acme Castings Ltd Heat number: H-26-1019-03 Date: 2026-10-19 Alloy: Ductile iron 65-45-12 Furnace: Induction furnace 2, 3 tonne
Temperatures and Treatment
Tap temperature: 1500 deg C Pour temperature: 1400 deg C Ladle treatment: Sandwich Mg treatment, inoculant added in stream
Patterns and Molds
Pattern P-2201 / Part PN-48213 (Housing), 24 molds
Operator: A. Operator
Chemistry Checks
| Sample | C % | Si % | Mn % | Other | Time | Result |
|---|---|---|---|---|---|---|
| Pre-tap | ||||||
| Final |
Mechanical / Process Checks
| Check | Method | Requirement | Actual | Pass / Fail |
|---|---|---|---|---|
| Test bar or coupon | ||||
| Wedge or chill test | ||||
| Nodularity / microstructure |
Remarks
No delays. Sample poured at start and end of heat.
Approvals
Starting point only. Adapt fields to your customer requirements and quality system, and keep heat numbers consistent with casting traceability records.
Digitize heat records into your ERP
Optional: a short review of how heat numbers and chemistry could be linked to lots and shipments.
Optional. The tool and every export work without this. No spam.
How to use the template
Fill in the heat number, alloy, furnace and temperatures, then describe the treatment and the patterns poured. Use the tables for chemistry and mechanical checks and sign off at the end. Export to PDF for the traveler or Word for a customized version, and file it with the casting lot.
- Use the same heat number on the lab report and casting tags.
- Record the temperature measurement method and its calibration.
- Note any delays that may affect fade of treatment.
What a good heat record contains
Traceability needs the heat number, alloy specification, tap and pour temperature, treatment, chemistry results, and the molds or patterns poured. For ductile iron, include the time between treatment and pour because magnesium fades. Many customers also require retained test bars or coupons and the results of tensile, hardness and microstructure checks per the applicable ASTM or customer standard.
Common mistakes
The most common issue is a record that cannot be matched to the castings. Keep the heat number on the mold, casting and shipping paperwork. Another is recording targets instead of actual readings, which hides drift in pour temperature.
- Logging planned temperatures instead of measured ones.
- Missing a chemistry sample after a late alloy addition.
- No record of the thermocouple or spectrometer calibration date.
- Heat numbers reused across shifts.
Frequently Asked Questions
Why record both tap and pour temperature?
The difference shows heat loss in transfer and ladle handling, which affects fluidity and defects such as misruns. Tracking both over time also shows whether ladle preheat and pour delay are under control.
How long should I keep heat records?
Follow your customer contract, quality system and any regulatory requirement. Aerospace and pressure-containing castings often require many years or the product life, and general industry commonly keeps records for several years. Confirm retention in your procedure.
Can I add fields for my customer?
Yes. Export to Word and add the customer's required fields such as specification revision, pour sequence or test bar identification. Keep the core heat number, alloy and results fields consistent.
Does this replace a MES or ERP record?
No. It is a paper or PDF-based record that works with or without a system. If you have an ERP or MES, use the same heat number in both so the paper log and the electronic lot can be matched.
If your foundry wants heat records captured on a tablet and linked to lots in the ERP, we can talk through options. The template is usable immediately without us.
Related Tools
Foundry Furnace Charge Mix and Cost Worksheet
Build a furnace charge row by row and see total weight, cost per kg and the blended carbon and silicon before melt losses.
Industry TemplatesCasting Gating System Choke Area and Pour Time Calculator
Calculate choke area, sprue diameter, runner and ingate areas from poured weight, density, pour time, discharge coefficient and effective head.
Industry TemplatesChvorinov Rule Solidification Time and Riser Sizing Calculator
Enter casting volume, cooling surface area and mold constant to get modulus, solidification time and a first-pass riser diameter and height.
Discrete ManufacturingTempering Hollomon-Jaffe Parameter Calculator
Compute the Hollomon-Jaffe tempering parameter and the equivalent time at another temperature, or the temperature that gives the same softening in a target time.
More Industry Templates tools
See all- Forging Billet Weight and Flash Allowance Calculator
- Upset Forging Stock Length, Strain and Final Diameter Calculator
- Foundry and Forge Process Control Maturity Assessment
- Distributor Free Freight Policy Template
- Job Shop Quote Cover Letter Template
- Monthly Operations Review Meeting Pack Template
- OEE Improvement A3 Charter Template
- Sheet Metal Job Traveler Template
- Press Brake Setup Sheet Template
Keep exploring
Free tools
- Foundry Pour and Mold Log WorksheetTrack every mold poured by heat, pattern, temperature, time and weights, and see casting yield per mold and in total.
- Foundry Heat and Melt Record TemplateA fill-in melt record that ties one heat number to its charge, spectrometer results, tap and pour data and the castings poured from it.
- Foundry and Forge Process Control Maturity AssessmentScore how well your melt, pour, forging, heat treat, traceability and data practices are controlled, and get practical next steps.
Guides
- ERP for Foundries: Requirements That Actually MatterWhat a foundry ERP needs: heat and lot traceability, alloy and melt costing, pattern tracking, cleaning room routing, scrap by defect, and honest fit questions.
- Heat Treatment and Testing Costs in Forging QuotesHow to price heat treatment, mechanical testing, NDT and certification into a forging quote, including in-house versus outside processing and lot charges.
- Foundry Heat and Lot Traceability for CastingsHow foundries trace castings back to heat, charge, pattern and process records, what customers and auditors ask for, and how to retrieve it in minutes.