Maintenance & ReliabilityFree templatePDF, Excel, Word exportOn-prem CMMSManufacturing

On-Prem CMMS Private AI Layer Blueprint Generator

This generator turns a few facts about your On-Prem CMMS environment into an architecture plan for a private AI layer that stays on your servers. It produces a document you can hand to IT, security and the system owner.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

On-Prem CMMS Private AI Layer Blueprint Generator

Private AI Layer Architecture Plan: On-Prem CMMS

Prepared for: Acme Precision Ltd System: On-prem CMMS (Maintenance Connection, MP2, Fiix alternatives), Maintenance Connection (on-premises) Data store: SQL Server Hosting: On-prem server Named users: 80 across 1 site(s) Target go-live: 2027-03-01

1. Context and scope

Acme Precision Ltd wants an AI assistant that works on data held in On-prem CMMS (Maintenance Connection, MP2, Fiix alternatives) without moving that data off its own infrastructure. The assistant is read-only by default. Any change to a system of record is proposed by the assistant and executed only after a named person approves it, through the system's supported interface.

Main use cases: Find similar past failures on an asset; PM compliance by craft; backlog by planner; draft a corrective work order with parts; summarise repeat failures.

2. Components

ComponentDesign for On-Prem CMMSNotes
Data access pathVendor-supported API or reporting views, or a reporting copy of the database; read-only accountRead-only identity, reporting copy where possible
Retrieval indexRetrieval index over work order descriptions, close-out notes, failure codes, PM procedures and OEM manuals, with asset class and site as metadataLocal vector store, metadata filters mirror permissions
Model servingOpen-weight model served with vLLM or Ollama on None yet in On-prem serverSize from users and questions per day
Tool serverTool server with asset_history, find_similar_failures, pm_compliance, parts_for_asset and backlog_by_craft, each citing record numbersApproved read actions only, parameterised
Identity and permissionsCMMS site, department and craft security carried into index metadata and enforced in the tool serverChecked before every query and retrieval
AuditAppend-only log of user, question, tool calls, query text, rows returned and answerRetained per your records policy

3. Security controls mapped to your constraints

Data that must never leave the site: Cost and labour rates, technician names, restricted site or customer assets, OEM documents under licence terms.

Hosting mode: On-prem server. All components run inside your network boundary. No model, index or log leaves it. For air-gapped hosting, model files, container images and updates enter through your controlled media process, and outbound telemetry in the serving stack is disabled.

Least privilege: a dedicated read-only service identity, no shared accounts, and per-user scope enforced in the tool server. Every answer shows its source records or query so a user can verify it.

4. Three-phase rollout

PhaseScopeExit criteria
Phase 1: Read-only questionsCited answers on one site or line for a pilot groupAccuracy on a known question set accepted by the system owner
Phase 2: DraftsSummaries, reports and proposed records for human editingEdit rate and error types reviewed, no policy breaches in audit
Phase 3: Approved actionsWrites through the supported API or interface after named approvalApproval and rollback procedure tested, audit trail complete

5. Open questions for IT and the system owner

1. Which interface does the vendor support for read access in Maintenance Connection (on-premises), and are there contractual limits on direct database reads? 2. Can we take a reporting copy of SQL Server, and who owns refresh and retention? 3. Which user groups map to which scopes, and who maintains the mapping? 4. What is the approved model list and the process for bringing in model updates? 5. What logging retention and review cadence does our policy require? 6. Who is the accountable owner for answer quality after go-live?

Prepared by / Date
System owner / Date
IT security / Date

This is a planning starting point, not a design guarantee. Confirm interface names, versions and vendor support terms with your vendor before building. Metrics such as PM compliance, MTBF and MTTR are computed from clean fields in SQL, with definitions aligned to SMRP-style metric definitions and an ISO 14224 style failure taxonomy where you have one. Retrieval handles the free text: similar failures, fixes that worked and procedures. New work orders are drafted by the assistant and entered by a planner.

Architecture review of your plan

Optional: a short review of your exported blueprint by an engineer who has built private AI layers on this kind of system.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the generator

Fill in company name, version, data store and hosting mode, then describe the use cases and the data that must never leave the site. Choose the GPU line that matches what you have or expect to buy. The document updates as you type and exports to PDF or Word. Share the first draft with the system owner and IT security, and use the open questions section as the agenda for your next meeting. Expect to edit the components table once you learn what your vendor supports.

  • Start with one site or line
  • Name an owner for answer quality
  • List the data that must stay on site before you pick models
  • Use the exported file as the basis for a change request

Method behind the plan

Metrics such as PM compliance, MTBF and MTTR are computed from clean fields in SQL, with definitions aligned to SMRP-style metric definitions and an ISO 14224 style failure taxonomy where you have one. Retrieval handles the free text: similar failures, fixes that worked and procedures. New work orders are drafted by the assistant and entered by a planner.

What the plan covers

The plan has five parts: context and scope, a component table, security controls tied to your inputs, a three-phase rollout and open questions. The rollout moves from read-only questions to drafted outputs to approved actions, with exit criteria between phases. Each component is described for On-prem CMMS (Maintenance Connection, MP2, Fiix alternatives) specifically, including the data access path and the permission model.

  • Data access path and identity
  • Retrieval index and tool server
  • Model serving on local GPUs
  • Audit log and retention

Common mistakes

Most failed pilots skip the permission model or the audit trail, then cannot get approval to widen use. Check the points below before you take the plan to a steering group.

  • Reading production tables directly without vendor confirmation, then breaking on upgrade.
  • Computing MTBF or PM compliance with the model instead of SQL on clean fields.
  • Letting the assistant close work orders or change PM intervals without review.

Frequently Asked Questions

Does this plan require a cloud service?

No. Every component in the plan runs inside your network: the data access path, the retrieval index, the model serving on your GPUs, the tool server and the audit log. Air-gapped hosting is a supported option.

Is the assistant able to change data?

Not by default. The plan is read-only. Writes are proposed by the assistant and executed only after a named person approves, through the system's supported interface, and the audit log records the proposal and the approval.

How do I pick the GPU line?

Pick what you have or plan to buy, then check it with the sizing calculator for this system. A 24 GB class GPU suits small models and few users. More users or larger models need more memory or more GPUs.

Can I edit the document?

Yes. Edit the fields and export to Word. The component table and the open questions are the parts most worth tailoring once your vendor confirms which interfaces it supports for your version.

If you want a second pair of eyes on this plan, Netray designs and builds private, on-prem AI layers over systems like this, read-only by default.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Software