Infor SyteLineFree templatePDF, Excel, Word exportInfor SyteLineAll Infor SyteLine (CloudSuite Industrial) tools

SyteLine Private AI Layer Blueprint Generator

This generator turns a few facts about your SyteLine system into a written architecture plan for a private AI assistant that runs on your own infrastructure. It is meant for the first conversation between IT, the ERP owner and security.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

SyteLine Private AI Layer Blueprint Generator

Context

Company: Acme Precision Ltd SyteLine version: SyteLine 8.03 Database: SQL Server 2016 Hosting: On-prem server Named users: 250 across 2 site(s) GPU: None yet Target go-live: 2027-03-31

Purpose: add a private AI assistant to the existing SyteLine system without moving data outside the site.

Use cases

Ask about open customer orders, late jobs and PO status; summarise NCRs; find the right drawing or work instruction; draft supplier chase emails.

Data that must stay on site

Customer pricing, export-controlled drawings, employee and payroll data.

These classes are excluded from any external service. The model, retrieval index and logs run on On-prem server infrastructure only.

Components

ComponentDesign for SyteLine
Data access pathRead-only reporting copy of SyteLine databases plus approved IDO loads through the IDO request service
Retrieval indexLocal embedding model and vector store over Mongoose attachments and plant file shares, with site and group metadata
Model servingOpen-weight model on vLLM or Ollama on local GPUs
Tool serverMCP or tool server exposing named read actions, each mapped to one IDO load or parameterised query
Identity and permissionsSSO to SyteLine user, user groups and site access mirrored in tool calls
AuditAppend-only log of prompt, tool call, query and answer per user

Security controls mapped to your inputs

ControlHow it applies
NetworkHosting is On-prem server; the model server has no outbound internet route; only the tool server reaches SyteLine (SQL Server 2016)
Data classesExcluded or masked before indexing: Customer pricing, export-controlled drawings, employee and payroll data.
AccessSQL Server TLS, least-privilege service account, site and group filtering, no free SQL
Scale250 named users across 2 site(s); capacity checked against the GPU position: None yet
Write-backDisabled in phase 1; later only through supported SyteLine interfaces with named-user approval

Rollout

PhaseScopeExit criterion
1. Read-only questionsNamed read actions and document search for the use cases aboveAnswers match SyteLine screens on a test set, no cross-permission leaks
2. DraftsAssistant drafts emails, notes and change proposals for a user to reviewUsers accept most drafts with light edits; audit log reviewed
3. Approved actionsSelected writes through supported interfaces after explicit approvalZero unapproved writes; rollback tested; target go-live 2027-03-31

Open questions for IT

1. Which SyteLine sites and user groups must be mirrored? 2. Is the IDO request service reachable from the tool server network zone? 3. Which custom IDOs and user-defined fields matter for the use cases? 4. Who owns the audit log and how long is it retained? 5. Which identity provider issues the user identity the tool server will use?

Approvals

Prepared by / Date
IT security / Date
ERP owner / Date

This is a starting plan, not a design guarantee. Object names, endpoints and versions vary by installation; confirm them with your SyteLine administrator before building. Sizing figures come from the companion calculator.

Review my SyteLine AI blueprint

Optional: an engineer reviews your generated plan and flags gaps in permissions, sizing and rollout.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the generator

Fill in the company, SyteLine version, database, hosting model, user and site counts, use cases, data that must stay on site, GPU position and target date. The document updates as you type and exports to PDF or Word for circulation.

  • Be specific about use cases: lookups, document search and drafts are cheap, actions are not.
  • List data classes, not systems, under what must stay on site.
  • Choose air-gapped only if no component may reach the internet at runtime.
  • Treat the open questions as the agenda for the first IT meeting.

What the plan contains

The plan lists six components for SyteLine: data access path, retrieval index, model serving, tool server, identity and permissions, and audit. It maps security controls to your inputs and sets out a three-phase rollout from read-only questions to approved actions.

  • Read-only first, writes later through supported interfaces only.
  • One tool per approved read action, never free SQL from the model.
  • Permissions mirrored from SyteLine so the assistant cannot show more than the user could see.

How to read the result

Check that each component has an owner and that the rollout exit criteria are testable. If the GPU position is none, run the sizing calculator before ordering hardware. If your hosting is private cloud rather than on-prem, confirm contractually that the GPU nodes are single-tenant or logically isolated.

Common mistakes

Teams often start with write actions, skip the audit log, or give the assistant a service account that sees every site. Another frequent issue is forgetting documents: much of the value is in drawings, certs and procedures, not tables. This plan puts documents and permissions in the first phase on purpose.

Frequently Asked Questions

Does this plan require a cloud service?

No. All components can run on your own servers, including air-gapped, with open-weight models served locally. A private cloud option is available if you prefer to host there.

Is the plan specific to SyteLine?

The components table and controls name SyteLine access mechanisms and permission models. Version-specific object names must still be confirmed on your system.

Can I edit the document after export?

Yes. The Word export is editable, and you can change fields and re-export at any time. Nothing is sent anywhere; the tool runs in your browser.

How do I size the GPUs?

Use the companion sizing and value calculator, which estimates concurrent requests, tokens per day and GPU count from your user numbers and an assumed tokens-per-second figure.

If you would like a second pair of eyes on the plan for your SyteLine environment, Netray builds private and air-gapped AI on top of ERP systems and can review it with you.

Get Infor SyteLine alerts

Support and maintenance deadlines, release changes that affect Infor SyteLine sites, and new free Infor SyteLine tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor SyteLine: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring