ISO Cutting Tool Material Groups (P, M, K, N, S, H) Reference
Insert and end mill catalogs sort every grade by six colour coded ISO groups. Knowing which group your workpiece falls in is the first step to choosing a grade, geometry and starting speed. This reference lists common materials with their group.
| Workpiece material | Example designation | ISO group | Catalog colour | Machining note |
|---|---|---|---|---|
Low carbon steel | AISI 1018, S235 | P | Blue | Gummy, long chips. Use chip breaker geometry. |
Free machining steel | AISI 12L14, 11SMn30 | P | Blue | Good chip control, high speeds possible. |
Medium carbon steel | AISI 1045, C45 | P | Blue | General purpose group for coated carbide. |
Alloy steel (soft or annealed) | AISI 4140, 42CrMo4 | P | Blue | Reduce speed as hardness rises. |
Alloy steel (pre-hardened) | 4140 at 28-34 HRC | P | Blue | Strong edge and heat resistant coating. |
Austenitic stainless steel | AISI 304, 316 | M | Yellow | Work hardens. Keep feed up, avoid rubbing. |
Precipitation hardening stainless | 17-4 PH | M | Yellow | Condition dependent, tougher when aged. |
Duplex stainless steel | 2205 (UNS S32205) | M | Yellow | High strength, high cutting forces. |
Gray cast iron | ASTM A48 Class 30 | K | Red | Short chips, abrasive. Often run dry. |
Ductile (nodular) cast iron | ASTM A536 65-45-12 | K | Red | Tougher than gray iron, coated carbide. |
Aluminum alloy (wrought) | 6061-T6, 7075-T6 | N | Green | Sharp uncoated or PCD edges, high speeds. |
Aluminum alloy (high silicon cast) | A390, A356 | N | Green | Abrasive silicon, PCD tools extend life. |
Copper alloys | C110 copper, C360 brass | N | Green | Brass is easy, pure copper is gummy. |
Plastics | Delrin (POM), nylon, PEEK | N | Green | Sharp edges, low heat, avoid melting. |
Titanium alloy | Ti-6Al-4V (Grade 5) | S | Orange | Low speed, high coolant, sharp edges. |
Nickel based superalloy | Inconel 718, Inconel 625 | S | Orange | Work hardens, ceramics at high speed. |
Cobalt based alloy | Stellite, Haynes 25 | S | Orange | Very abrasive and tough. |
Hardened steel | AISI 4340 at 50 HRC | H | Grey | CBN or fine grain carbide. |
Hardened tool steel | AISI D2 at 58-62 HRC | H | Grey | CBN inserts, rigid setup, light cuts. |
Group assignments follow the ISO 513 style grouping used by major insert catalogs. Individual manufacturers subdivide each group (for example P10 to P50) and may place borderline alloys differently, so confirm in the catalog you buy from.
Material and tooling rules in your ERP
Optional: a conversation on keeping material groups and approved tools searchable from your ERP.
Optional. The tool and every export work without this. No spam.
How to use the reference
Search for your workpiece material or alloy designation, note the ISO group letter, then open the tooling catalog at that group. Grades are labelled with the group letter and a number, where lower numbers favour wear resistance and higher numbers favour toughness. Export the table if you want a reference page in your tooling standard.
What the six groups mean
P is steel, M is stainless steel, K is cast iron, N is non-ferrous metals and plastics, S is heat resistant superalloys and titanium, and H is hardened steel. The colour code is blue, yellow, red, green, orange and grey respectively. The groups reflect how chips form and what tool wear mechanism dominates, not just hardness.
- P blue: steel
- M yellow: stainless
- K red: cast iron
- N green: non-ferrous and plastics
- S orange: titanium and superalloys
- H grey: hardened steel
Using group data in a tooling database
Store the ISO group on every material record in your ERP or tool crib system. That lets a program or a planner filter approved insert grades by material instead of keeping a separate spreadsheet. It also helps when a customer changes the material on a drawing, because the affected tools and cutting data are easy to find.
Common mistakes
Do not assume all stainless steels behave alike, since free machining 303 is easier than 316, and do not use a steel grade on titanium because heat concentrates at the edge. Another common error is treating hardness as the only factor: pre-hardened 4140 at 30 HRC is still a P material, while 50 HRC steel moves to H.
Frequently Asked Questions
What does P M K N S H stand for?
They are the six ISO material groups used by cutting tool makers: P for steel, M for stainless steel, K for cast iron, N for non-ferrous metals, S for heat resistant alloys and titanium, and H for hardened steel.
Which group is aluminum?
Aluminum alloys are in the N group, shown in green. High silicon cast aluminum is abrasive and often needs PCD tooling, while wrought alloys like 6061 and 7075 are machined with sharp, polished carbide.
Which group is Inconel and titanium?
Both belong to the S group, shown in orange. They are machined at much lower cutting speeds than steel because of heat and work hardening, and need rigid setups and plenty of coolant.
Can one insert cut several groups?
Some multi-purpose grades list more than one group, for example P and M, but performance is a compromise. For production work, pick the grade that is rated for your group and operation type.
If material and tooling rules are scattered across spreadsheets, we can show how an ERP-connected assistant could answer which tool to use for a given part and material.
Related Tools
Tap Drill Size Chart (UNC, UNF and Metric Coarse/Fine)
Look up the standard tap drill for common inch and metric threads, with pitch, and export the chart for the shop floor.
MES & Shop FloorCNC Tool List and Offset Log Worksheet
An editable tool list that tracks tool numbers, holders, stick-out and offsets, and flags the net wear on each tool.
Supply Chain & InventoryCarbide Insert Inventory and Reorder Worksheet
A tool crib worksheet that computes days of stock, reorder point and suggested order quantity for turning and threading inserts.
Engineering & PLMISO 286 IT Tolerance Grade Table (IT5 to IT9)
Standard tolerance band widths in micrometres for IT5 to IT9 across nominal sizes up to 250 mm.
More Discrete Manufacturing tools
See all- Fanuc Macro B System Variables Reference
- Tap Drill Size Chart (Metric, UNC, UNF)
- Thread Pitch Chart (Metric, UNC, UNF)
- Drill Point Length Calculator
- Turning Cutting Time Calculator
- Thread Milling G-Code Generator
- Boring Bar Overhang Ratio Calculator
- Knurling Blank Diameter Calculator
- Tapping Torque Calculator
Keep exploring
Free tools
- Carbide Insert Inventory and Reorder WorksheetA tool crib worksheet that computes days of stock, reorder point and suggested order quantity for turning and threading inserts.
- Turning Cutting Time CalculatorEstimates turning rpm, feed rate, number of passes, cutting time and metal removal rate for a straight turning cut.
- SAP S/4HANA Conversion and Migration Tools ReferenceA lookup of the SAP tools used at each phase of an S/4HANA conversion or migration, what each does and when to use it.
ERP fixes and how-tos
- Infor LN Text Editor and Text Fields: How They WorkHow the text editor and text fields work in Infor LN sessions: opening, editing, text groups and languages, printing text on documents and common problems.
- SAP S/4HANA Material Groups: Configure, Assign and ReportHow to define material groups in SAP S/4HANA (OMSF), assign them in MM01 and report on spend by group using tables T023, MARA-MATKL and EKPO-MATKL.
- Infor Birst Dynamic Groups for Row-Level Data AccessHow to restrict Infor Birst data by user with dynamic groups and filters: the security table pattern, session variables, testing, and common mistakes.
Guides
- How to Estimate Laser Cutting Cost Per PartA working formula for laser cutting cost per part: cut time, pierce time, assist gas, material by nest, machine rate, setup and handling for fab shops.
- How to Configure User Security Groups in SyteLineStep-by-step guide to configuring user security groups in Infor SyteLine CloudSuite Industrial. Set up group hierarchies, form permissions, and IDO-level access controls.
- Configuring Security Groups in SyteLineConfigure security groups in Infor SyteLine to control form access, field visibility, and data permissions. Step-by-step guide for role-based security administration.
AI on your ERP
- AI for NCR, CAPA, and 8D Drafting in AS9100 and ISO 9001 Quality SystemsAI drafts NCR, CAPA, and 8D reports from ERP quality data for engineer review, cutting drafting time under AS9100 and ISO 9001 without changing sign-off.
- AI Tools for Infor CSI and SyteLine: A Buyer's Guide to the OptionsCompare AI tools for Infor CSI and SyteLine: Infor GenAI, Birst, Power BI copilots, RPA, generic chatbots and private assistants, with honest fit and limits.
Manufacturing hubs
- AMT and IMTS: the machine tool association and its show, from a shop's point of viewWhat the Association for Manufacturing Technology (AMT) and the IMTS show are, and how machine shops and plants connect equipment, ERP and data after the show.
- American Gear Manufacturers Association (AGMA): gear standards, quality and ERP for gear shopsAGMA gear manufacturers ecosystem: gear standards, accuracy grades, heat treat and inspection, plus quoting, ERP and private AI problems for gear shops.