Engineering & PLMFree referencePDF, Excel, Word exportComposites Manufacturing

Composite Fiber and Matrix Typical Properties Reference

Early composite sizing needs a quick table of fiber and matrix density, modulus and strength. This reference collects typical values for the reinforcements and resins most manufacturers meet, so you can fill the input fields of a rule-of-mixtures calculation without hunting through datasheets.

Download:
MaterialClassTypeDensity (g/cm3)Tensile modulus (GPa)Tensile strength (MPa)Typical use
E-glass
Fiber
Glass
2.54 to 2.60
72 to 73
3,400 (virgin fiber)
Marine, wind, pressure vessels, general industrial
S-2 glass
Fiber
Glass
2.46 to 2.49
85 to 90
4,500 to 4,900
Aerospace, ballistic, higher performance glass
Basalt
Fiber
Mineral
2.6 to 2.8
80 to 95
3,000 to 4,800
Rebar, pipes, thermal and corrosion applications
T300 class
Fiber
PAN carbon, standard modulus
1.76
230
3,500
General aerospace and industrial prepreg
AS4 class
Fiber
PAN carbon, standard modulus
1.79
231
4,300
Primary aircraft structure, legacy programs
T700S class
Fiber
PAN carbon, standard modulus
1.80
230
4,900
Pressure vessels, automotive, sporting goods
T800S class
Fiber
PAN carbon, intermediate modulus
1.80
294
5,880
Aerospace primary structure
IM7 class
Fiber
PAN carbon, intermediate modulus
1.78
276
5,300
Aerospace primary structure, rotorcraft
M40J class
Fiber
PAN carbon, high modulus
1.77
377
4,400
Satellite structures, antenna reflectors
M55J class
Fiber
PAN carbon, ultra high modulus
1.91
540
4,000
Space structures where stiffness drives design
Kevlar 49 class
Fiber
Para-aramid
1.44
112 to 131
3,000 to 3,600
Ballistic, radomes, tension members
UHMWPE (Dyneema, Spectra class)
Fiber
Polyethylene
0.97
90 to 130
2,400 to 3,500
Ballistic panels, ropes, lightweight armor
Epoxy (cured)
Matrix
Thermoset
1.10 to 1.30
2.7 to 4.1
55 to 130
Aerospace prepreg, wind, sporting goods, tooling
Polyester (unsaturated)
Matrix
Thermoset
1.10 to 1.25
2.0 to 4.5
40 to 90
Marine, building panels, cost-driven glass parts
Vinyl ester
Matrix
Thermoset
1.10 to 1.20
3.0 to 3.5
70 to 90
Corrosion-resistant tanks, pipes, boats
PEEK
Matrix
Thermoplastic
1.30 to 1.32
3.6 to 4.0
90 to 100
Thermoplastic aerospace composites, high temperature
PPS
Matrix
Thermoplastic
1.35
3.4 to 4.0
80 to 90
Aerospace brackets and clips, chemical resistance
Polyamide 6 (nylon 6)
Matrix
Thermoplastic
1.13
1.5 to 3.0
50 to 80
Automotive and consumer thermoplastic composites

Values are typical, rounded figures for early sizing and rule-of-mixtures inputs. Grades, sizing, moisture state and test method change the real number, and virgin fiber strength is much higher than strength measured in a laminate. Always take design values from the supplier datasheet or your qualified material allowables. Class names such as T700S or IM7 refer to fiber families; individual producers publish their own certified data.

Put material data behind a private assistant

Optional: see how item masters and datasheets can be searched in natural language on your own infrastructure.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Search for a fiber or resin by name or use the class filter to switch between reinforcements and matrices. Copy density and modulus into the fiber volume fraction calculator to estimate laminate density and ply stiffness. Use the strength column to compare fibers qualitatively, not to predict laminate strength. Export the table to Excel or PDF for a materials selection discussion with design or purchasing.

  • Compare specific stiffness (modulus divided by density) when weight matters.
  • Check the datasheet for your grade before quoting or releasing a design.
  • Note whether strength is for dry fiber, impregnated strand or cured laminate.

How to read the numbers

Fiber properties are measured on the fiber or an impregnated strand, so strengths are high; a cured unidirectional carbon laminate typically delivers only 60% to 80% of the strand figure in the fiber direction because of stress concentrations and imperfect load sharing. Matrix properties are for neat cured resin. Transverse and shear behavior of a composite is dominated by the matrix and the fiber-matrix interface, so a high-strength fiber does not by itself give a damage-tolerant laminate. Use the density column to judge weight savings against glass, which is about 45% heavier than carbon for the same volume.

Choosing between fiber families

Glass is the low-cost, durable default and is non-conductive, which suits radomes and electrical parts. Standard modulus carbon offers about three times the stiffness of glass at lower density, but at a significantly higher cost per kilogram. Intermediate and high modulus carbon target aerospace and space structures where stiffness or low thermal expansion drives the design. Aramid and UHMWPE offer high tensile and impact performance but poor compressive strength, so they appear in ballistic and tension applications rather than primary bending members.

Common mistakes

Do not use fiber strength as laminate strength. Do not mix a dry-fiber modulus with a cured-laminate value in the same calculation. Be careful with moisture: epoxy matrices and aramid absorb water, which lowers hot-wet properties and can matter more than room-temperature numbers. Matrix temperature capability, such as glass transition temperature, is a separate selection criterion not shown here. Thermoplastic matrices have different processing windows and need supplier data for consolidation temperature and pressure.

Frequently Asked Questions

Which is stiffer, carbon fiber or glass fiber?

Standard modulus carbon is about 230 GPa against roughly 72 GPa for E-glass, so carbon is about three times stiffer and also about 30% lighter per unit volume. High modulus carbon can exceed 370 GPa, but cost and brittleness rise as well.

What is the density of carbon fiber?

Carbon fiber density is generally between 1.76 and 1.91 g/cm3, depending on the grade, with standard modulus fibers near 1.76 to 1.80 and high modulus fibers higher. A cured carbon/epoxy laminate is about 1.5 to 1.6 g/cm3 at typical fiber volume fractions.

Can I use these values for design allowables?

No. Use them for early sizing and trade studies only. Design allowables come from tested laminates with statistical basis, such as those in qualified material databases, and depend on the resin system, process and environment.

Why is aramid not used in compression-loaded parts?

Aramid fibers have high tensile strength but buckle and yield at low stress in compression, so laminates lose compressive performance. Hybrid constructions mix aramid with carbon or glass to combine impact resistance and compression capability.

If your engineering and purchasing teams keep material data in PLM or ERP item masters, Netray can help expose it to a private assistant that answers selection questions without data leaving your network.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

Manufacturing hubs