Condition Monitoring Alarm Limits Register Worksheet
Alarm limits tend to live in the heads of analysts or buried in vendor software settings. This register puts every limit, baseline and owner on one sheet, so changes are visible and the team knows who responds when a value crosses.
| Asset | Parameter | Technique | Unit | Baseline | Alert limit | Alarm limit | Latest value | Percent of alarm | Responder | |
|---|---|---|---|---|---|---|---|---|---|---|
95.8% | ||||||||||
18% | ||||||||||
92.5% | ||||||||||
89.5% | ||||||||||
87.4% |
This register assumes high values are bad. For parameters where a low value is bad, such as oil film thickness or flow, record the limits inversely and treat the percent column accordingly. Review limits after every major repair or load change.
Alarm limits that feed your ERP
Optional review of how alarm crossings could create maintenance notifications automatically.
Optional. The tool and every export work without this. No spam.
How to use the register
List each monitored parameter once, with its technique, unit and baseline taken when the asset was healthy. Set alert and alarm limits from a standard, the manufacturer or statistics of your own history. Update the latest value after each survey and the sheet shows how close each parameter is to its alarm. Assign a responder so a crossing is never ownerless. Export to Excel for review meetings and audits.
Setting alert and alarm levels
There are three common routes. First, use published severity zones such as the ISO 20816 families for vibration. Second, use the equipment manufacturer values. Third, use statistics: for example the baseline plus two standard deviations for alert and plus three for alarm once you have enough data. Mixing approaches is fine as long as the source of each limit is noted, so you can justify changes later.
- Alert means plan an inspection, alarm means act now
- Review limits after repairs, speed or load changes
- Keep a rate-of-change rule in addition to absolute values
Using percent of alarm
Percent of alarm is the latest value divided by the alarm limit. It lets you rank very different parameters on one scale. Values over 100% are in alarm, and those above the alert level but below alarm sit in the amber zone. Sort the exported file by this column before the weekly reliability meeting to decide which assets to discuss first.
Common mistakes
Frequent problems are copying limits between unlike machines, leaving baselines out of date after an overhaul, too many alarms that train people to ignore them, and alarms with no response plan. Aim for few, meaningful alarms and a clear next step for each.
Frequently Asked Questions
Can I use this for online monitoring systems?
Yes. Use it as the master record of what each system should alarm on, then compare against the configuration in the software. It is especially useful when limits have been changed over time by different people.
How many parameters should I register?
Start with the critical assets and the two or three parameters that best reflect their main failure modes. A short register that is kept current beats a long one that nobody updates.
What if a parameter has only a low limit?
Enter the limits inversely or rename the columns in the Excel export. The percent formula assumes higher is worse, so for low-is-bad parameters calculate the margin separately.
Who should approve limit changes?
Usually the reliability engineer with the asset owner. Record the date and reason in the note field of your exported copy to keep an audit trail.
Netray can help connect your limits to live data so crossings create notifications in your ERP maintenance module automatically.
Related Tools
Vibration Analysis Field Report Template
A fill-in vibration analysis report: asset, route data, spectrum findings, diagnosis, severity and recommended work order. Exports to PDF or Word.
Maintenance & ReliabilityOil Analysis Sample Log Worksheet
An editable log for oil samples with viscosity change calculated per row, water and iron readings, and an action column. Exports to Excel.
Maintenance & ReliabilityUltrasonic Bearing Readings Log Worksheet
An editable route log for ultrasound readings. Enter baseline and current dB, get rise over baseline per row and record the lubrication or inspection action.
Maintenance & ReliabilityMotor Insulation Resistance Test Log Worksheet
An editable megger test log that calculates dielectric absorption ratio, polarization index and insulation resistance corrected to 40C.
Maintenance & ReliabilityInfrared Thermography Inspection Report Template
A fill-in thermography report covering equipment, camera settings, hotspot temperatures, delta T, severity and recommended repair. Exports to PDF or Word.
More Maintenance & Reliability tools
See all- Preventive Maintenance Schedule Template
- Maintenance Work Order Template
- Inherent vs Operational Availability Calculator (MTBF, MTTR)
- Spare Parts Criticality Scoring Worksheet
- Maintenance Backlog Calculator (Weeks of Work and Crew Size)
- PM Compliance and Schedule Compliance Calculator
- Reliability Centered Maintenance (RCM) Worksheet
- Maintenance Cost per Unit Produced Calculator
- Optimal PM Interval Calculator (Weibull Cost Model)
Keep exploring
Free tools
- Condition Monitoring Alarm Limit Worksheet (Statistical Baseline)Editable worksheet that sets alert (mean + 2 sigma) and alarm (mean + 3 sigma) limits per asset and measurement.
- Condition Monitoring Alarm SQL Query GeneratorFill in your table and column names and get SQL that finds sensor readings over limits and flags assets with no open work order.
- Condition Monitoring Route TemplateGenerate a route sheet that lists assets, measurement points, techniques, alarm limits and sign off so a technician can walk it and record readings.