Infrared Thermography Inspection Report Template
Thermography findings are only as useful as the paperwork that follows them. This template captures the camera settings an auditor will ask about, the temperatures that justify the call and the repair priority your electricians can schedule.
Fill in
Infrared Thermography Inspection Report Template
Infrared Thermography Inspection Report
Site: Eastgate Foundry Area: MCC-3 motor control center Date: 2026-10-14 Thermographer: A. Okafor Camera: Thermal camera, S/N 12345 Emissivity: 0.95 Ambient and reflected: 24 C ambient, 24 C reflected Load: About 70% of rated current
Finding
Phase B lug on feeder 7 reads 78 C against 41 C on phases A and C, delta T of 37 C at 70% load.
Repair Priority
Repair within 7 days
Recommendation
De-energize under permit, clean and retorque the lug, inspect for discoloration, rescan after return to service at similar load.
Anomaly Register
| Item | Component | Hot temp C | Reference temp C | Delta T C | Photo ID | Priority |
|---|---|---|---|---|---|---|
| 1 | ||||||
| 2 | ||||||
| 3 |
Approvals
Severity scales vary by company and by standard, for example NETA and insurer guidance. State which scale you used. Attach the thermal and visible-light image for each anomaly. Always correct for load, a reading at low load understates the problem. Work on energized equipment must follow your own electrical safety procedure.
Get thermography findings into work orders
Optional review of how your scan results could create tracked maintenance jobs in the ERP.
Optional. The tool and every export work without this. No spam.
How to use the template
Complete the header with emissivity, ambient and load, since these decide whether a number can be trusted. Describe each hotspot with the measured temperature, a like-for-like reference and the delta T. Choose a repair priority from the list, write the recommended action, then add each anomaly to the register table. Export to PDF for the file and to Word if you want to edit before sending to the maintenance supervisor or insurer.
Delta T and severity
Electrical findings are normally judged by temperature rise against a similar component under the same load, or against ambient. Typical programs treat small differences as monitor items and large differences as urgent. Because heating scales roughly with the square of current, a reading at 50% load can understate the heat at full load by a large factor. Record the load and, if your procedure allows, normalise the delta T.
- Compare phase to phase on the same piece of equipment
- Check emissivity of the surface, bare metal reads low
- Rescan after repair and keep before and after images
What to include in the anomaly photos
Take a thermal image with a visible-light photo of the same view, with the temperature scale locked so readers can compare. Label the item by tag so it links to the equipment record in your CMMS. Avoid reflective surfaces and direct sunlight on outdoor equipment, and never rely on a single measurement point when a line or area box will show the maximum.
Common mistakes
Typical errors are the wrong emissivity, scanning with closed panels, ignoring wind outdoors, comparing unlike components and leaving out the load. Another is writing a report with no repair date. Each anomaly should end with an owner, a priority and a target date.
Frequently Asked Questions
What emissivity should I use?
Painted or oxidised surfaces and insulating materials are often near 0.90 to 0.95. Bare or shiny metal is far lower, so use electrical tape or paint of known emissivity on the target or use a procedure to measure it. Record whatever you used.
Which severity table applies?
Many sites follow NETA or their insurer tables, others have internal tables. This template does not impose a scale. Pick the one required for your site and write it in the report.
Is thermography only for electrical equipment?
No. It is also used on bearings, steam traps, refractory, tanks, roofs and pipe insulation. Replace the anomaly register headings to suit if your survey is mechanical or building related.
How often should scans be done?
Annual scans are common for electrical systems, with more frequent scans on critical or heavily loaded gear. Insurers sometimes dictate the interval.
Netray can help route thermography findings into ERP maintenance notifications so each hotspot has an owner and a due date.
Related Tools
Vibration Analysis Field Report Template
A fill-in vibration analysis report: asset, route data, spectrum findings, diagnosis, severity and recommended work order. Exports to PDF or Word.
Maintenance & ReliabilityMotor Insulation Resistance Test Log Worksheet
An editable megger test log that calculates dielectric absorption ratio, polarization index and insulation resistance corrected to 40C.
Maintenance & ReliabilityCondition Monitoring Alarm Limits Register Worksheet
An editable register of baselines, alert and alarm limits by asset and parameter, with percent of alarm calculated from the latest reading.
Maintenance & ReliabilityFailed Component Teardown Inspection Report Template
A fill-in report for post-failure teardown: what was found, failure mode, probable cause, whether the condition monitoring warning was correct and what changes.
Maintenance & ReliabilityUltrasonic Bearing Readings Log Worksheet
An editable route log for ultrasound readings. Enter baseline and current dB, get rise over baseline per row and record the lubrication or inspection action.
More Maintenance & Reliability tools
See all- Preventive Maintenance Schedule Template
- Maintenance Work Order Template
- Inherent vs Operational Availability Calculator (MTBF, MTTR)
- Spare Parts Criticality Scoring Worksheet
- Maintenance Backlog Calculator (Weeks of Work and Crew Size)
- PM Compliance and Schedule Compliance Calculator
- Reliability Centered Maintenance (RCM) Worksheet
- Maintenance Cost per Unit Produced Calculator
- Optimal PM Interval Calculator (Weibull Cost Model)
Keep exploring
Free tools
- Infrared Thermography Severity and Emissivity ReferenceQuick lookup of temperature rise priorities for electrical thermography and typical emissivity values for common surfaces.
- Vibration Analysis Field Report TemplateA fill-in vibration analysis report: asset, route data, spectrum findings, diagnosis, severity and recommended work order. Exports to PDF or Word.
- Predictive Maintenance Alert Work Request TemplateA document template that turns a vibration, thermography or oil analysis finding into a plannable maintenance work request.