Maintenance & ReliabilityFree templatePDF, Excel, Word exportProcess and Discrete Manufacturing

Condition Monitoring Route Template

A condition monitoring route is the list of machines and measurement points a technician walks on a fixed cycle. This template builds a printable route sheet with limits, space for readings and a follow up section.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Condition Monitoring Route Template

Condition Monitoring Route Sheet

Company: Acme Precision Plant 2 Route: Route 04 - Utilities and Pumps Area: Utilities building Technician: J. Rivera Date: 2026-10-20 Frequency: Monthly Instrument: Handheld analyzer SN 20481

Safety and access notes

Wear hearing protection near compressors. Do not remove guards. Lock out before any contact with rotating parts.

Measurement points

AssetPointTechniqueAlertDangerReadingOK?
Cooling pump P-101Motor DE horizontalVibration velocity mm/s RMS2.84.5
Cooling pump P-101Pump DE horizontalVibration velocity mm/s RMS2.84.5
Cooling pump P-101Motor DE bearingTemperature deg C7590
Compressor K-3Gearbox casingUltrasound dB
Compressor K-3Main motorInfrared thermography
Fan F-5Fan NDE verticalVibration velocity mm/s RMS4.57.1

Observations

Record leaks, noise, odour, loose guards, oil level, oil colour and anything unusual:

Follow up actions

AssetFindingActionNotification no.Priority

Sign off

Technician / Date
Reliability engineer / Date
Maintenance supervisor / Date

Example limits are placeholders. Replace them with limits from the machine builder, ISO 10816 or your own baseline data. Measure at the same points, in the same direction and at similar operating conditions every time.

Load route results into your ERP

Optional review of how to turn route readings into measurement documents and notifications.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Fill in the plant, route name, area, technician and instrument, then edit the table rows to match your assets. Each row is one measurement point and one technique. Keep the points in walking order to save time, and group by area. Export the sheet to PDF for the clipboard, or to Word or Excel for a version your team can keep editing. After the route, enter any findings in the follow up table with the notification number from your maintenance system.

  • One row per point per technique
  • Order the rows in the physical walking sequence
  • Mark point locations on the machine with paint or a tag
  • Keep the route length to what a person can finish in a shift

Choosing techniques and frequency

Vibration analysis suits rotating equipment, ultrasound finds friction, leaks and electrical discharge, infrared thermography shows hot connections and bearings, and oil analysis covers gearboxes and hydraulics. Frequency should be shorter than the P-F interval of the failure you want to catch. Critical machines in a harsh duty may be monthly or even continuously monitored, while a lightly loaded spare pump may be quarterly.

Alert and danger limits

Start from published limits, such as ISO 10816 zones for vibration, and then adjust after you have a baseline of at least several readings on a healthy machine. Many teams set alert at about 1.5 to 2 times baseline and danger at the zone C/D boundary. Always compare to the previous reading as well, because a fast rise is a warning even when the value is below the limit.

Common mistakes

Changing the measurement point or direction between visits makes trends meaningless. Taking readings while the machine is at a different load or speed has the same effect. Another problem is collecting data that nobody reviews: assign a reviewer and a deadline. Finally, make sure that findings become work requests in the CMMS, not just notes on paper.

Frequently Asked Questions

What is a condition monitoring route?

It is a defined sequence of machines and measurement points that a technician visits at a set interval, collecting data such as vibration, temperature or ultrasound. The readings are trended to detect developing faults before they cause failure.

How many points should be on one route?

Enough for one technician to finish within a shift with time to review findings. A common range is 50 to 150 points depending on how many machines are close together and which techniques are used. Split larger plants into several routes.

How do I set alarm limits for new machines?

Use the standard or manufacturer limits at first, then record baseline readings during healthy operation. After a few visits, set alert and danger levels relative to the baseline and the standard, and review them whenever the machine is rebuilt.

Can I use this for oil analysis or thermography?

Yes. Change the technique column and the limits column to suit, for example particle count code, water ppm or temperature rise over ambient. The layout works for any technique that has a point, a reading and a limit.

If you want route results loaded into your ERP maintenance module and exceptions raised as notifications automatically, Netray can help design that integration.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring