EDI Trading Partner Production Cutover Checklist
Moving an EDI partner from test to production is where small gaps become real shipments with real chargebacks. Use this list to check connectivity, maps, acknowledgments and fallback before ISA15 changes to P.
0 of 28 items complete
10 critical items still open - these are the highest-risk gaps.
Connectivity and envelope
Maps and data
Acknowledgments and compliance
Monitoring and fallback
Every critical item should be checked before the switch. If a critical item is open, agree a dated plan with the partner or delay cutover.
Partner onboarding register
An optional review of how onboarding status could be tracked against your ERP and EDI monitoring.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Work through the groups with the partner on a call, not alone. Tick items as you verify them with evidence: a test file, a 997, an email from the partner. The critical items are those that cause lost orders, rejected shipments or financial penalties if wrong. Export the finished list to PDF and keep it with the partner record as the cutover sign-off.
Plan the first week
The first production documents deserve manual review. Compare what the partner sent with what arrived in the ERP, and compare each outbound document with the ERP source. Agree the daily check with the partner, and watch for the first 997 on each document type. Do not start a second partner cutover until the first has stable traffic and the compliance dashboard is clean.
- Review the first five documents of each type manually.
- Confirm 997 receipt within the agreed window.
- Track rejected documents by cause.
- Hold off new maps during the first week.
Common mistakes
Teams often go live on the technical test alone and forget the business side: the ship-to table, the label data, the invoice timing. Another frequent gap is monitoring: a failed AS2 session at night means orders arrive late and nobody notices until the buyer calls. Make sure someone owns the alert, and that the manual fallback has been rehearsed at least once.
Frequently Asked Questions
How long should EDI testing last?
It depends on the number of transaction sets and the partner. A single 850 and 810 pair may take a few days, while full retail programs with ASN and labels often take several weeks. Plan time for partner review cycles.
Who approves going live?
Both sides. Typically the partner's EDI team approves the technical test and the business owner approves the order and shipping flow. Keep the approval in writing.
Should test and production use different control numbers?
Use separate counters or ranges. A production file reusing a test ISA13 may be dropped as a duplicate, and mixing them makes troubleshooting harder.
What is hypercare for EDI?
A short period after go-live, usually one to two weeks, when someone checks every document and alert daily and the partner is on call. It ends when error rates stabilize.
If cutovers are tracked in emails and spreadsheets, Netray can help set up a partner onboarding register that links checklist status to your ERP and EDI monitoring.
Related Tools
X12 ISA GS Envelope Skeleton Generator
Fill in sender, receiver, qualifiers and control numbers and get a matching envelope to test a translator or a partner connection.
Supply Chain & InventoryX12 997 AK Segment Error Codes Reference
Look up what a 997 rejection code means and what to check in the outbound file before you resend it.
Supply Chain & InventoryEDI Program Health Assessment
Score how well your EDI operation is monitored, documented and resilient, and see where to start fixing.
Supply Chain & InventoryEDI Partner Test Plan and Sign-Off Template
A test plan document with cases for inbound and outbound transaction sets, pass criteria and go-live sign-off for a new trading partner.
More Supply Chain & Inventory tools
See all- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
- Distributor Backorder Cost and Fill Rate Calculator
- EOQ with Vendor Minimum Order Calculator